Total Years of Experience: 17 Years, 8 Months
December 2017
To Present
Deputy Project Manager
at Saudi Arabia Saipem
Location :
Saudi Arabia - Dammam
Prioritizing the deliverables of AFC, method drawings, Procurement & Fabrication at Yard
Conducting weekly meeting and analyzing progress, productivity and forecast
Analysing monthly Progress, budget, schedule and mitigate if any issues
Monitoring the Risks in the Project & manage / mitigate them as per priority.
Allocating resources - manpower, materials, consumables & equipment in advance as per plan
Sequencing of NDT plan for smooth operations and to achieve the planned progress
Monitoring & controlling the scope is performed within the given budget and schedule
Managing the scope changes throughout the Project phase
Coordinating with internal departments for smooth workflow & shooting out the cause of flaws
Managing the Precommissioning activities coordinate with Commissioning team
Managing and Closing the B Punch Items raised by client prior to load out/Sail away
Conducting weekly meeting and analyzing progress, productivity and forecast
Analysing monthly Progress, budget, schedule and mitigate if any issues
Monitoring the Risks in the Project & manage / mitigate them as per priority.
Allocating resources - manpower, materials, consumables & equipment in advance as per plan
Sequencing of NDT plan for smooth operations and to achieve the planned progress
Monitoring & controlling the scope is performed within the given budget and schedule
Managing the scope changes throughout the Project phase
Coordinating with internal departments for smooth workflow & shooting out the cause of flaws
Managing the Precommissioning activities coordinate with Commissioning team
Managing and Closing the B Punch Items raised by client prior to load out/Sail away
April 2017
To November 2017
Project Manager
at Steel Engineering Technology
Location :
Qatar - Doha
Managing the scope is performed within the given budget and schedule
Managing monthly invoice as per contract
Monitoring the Risks in the projects & manage / mitigate them as per priority.
Approving & Allocating resources - manpower, materials, consumables & equipment in advance as per plan
Conducting weekly & monthly project meeting with Client
Managing the scope changes throughout the project cycle
Managing monthly invoice as per contract
Monitoring the Risks in the projects & manage / mitigate them as per priority.
Approving & Allocating resources - manpower, materials, consumables & equipment in advance as per plan
Conducting weekly & monthly project meeting with Client
Managing the scope changes throughout the project cycle
June 2014
To February 2017
Senior Production Engineer / Act. Production Manager
at Eversendai Offshore RMC FZE
Location :
United Arab Emirates - Ras Al Khaimah
• Fixing Priorities to all cutting, prefab & fabrication activities in the Yard
• Leading Production Engineers (Structural, Piping, E&I and Mechanical) to feed the required information, procedures, drawings & materials to construction team for smooth work flow.
• Ensuring the approved & latest AFC issue to site & shop & controlling the As-Built drawings.
• Assisting Project Manager to prepare Risk Register to forecast Risks in the project & manage / mitigate them as per priority.
• Arranging & Allocating resources - manpower, materials, consumables & equipment in advance as per plan, priority and sequence for smooth operations and to get the planned productivity
• Achieving the given task and scope within the budget and schedule
• Mitigating the plan/schedule if any schedule slippage due to unexpected situations and or critical path activities
• Utilizing the scrap materials for temporary fabrication aids/supports - saving company cost
• Conducting Internal Audit to rectify the weak part of internal departments and supporting to improve the same
• Always maintain good safety & motivate the people for the same - conduct training & TBT
• Liaising & supporting Proposal team in bidding stage for estimation of resources required.
• Liaising with commercial, planning & project team in budget split up & cost code for construction activities to have better control on Cost.
• Reviewing & approving Method Statements & TRA for all construction related activities
• Coordinating with Engineering, QA/QC, HSSE and having good communication at all the time to complete the task with quality, safety & productivity.
• Preparing Punch list for mechanical completion and liaising with Commissioning team
• Performing the job as per International Standards, codes & client specifications (e.g. DNV, AWS, EMMUA, ASME, ADGAS, SAES)
• Continuous monitoring of Consumables, tools, materials & equipment and coordinating with Procurement/warehouse for current & upcoming projects for smooth operations
• Reviewing the daily & weekly progress with Yard manager and taking remedies to improve the productivity and advising the construction team accordingly - Implemented Job Card system
• Preparing Lesson learn Register for all projects and communicate to relevant team to avoid mistakes / taking action for coming projects
• Leading Production Engineers (Structural, Piping, E&I and Mechanical) to feed the required information, procedures, drawings & materials to construction team for smooth work flow.
• Ensuring the approved & latest AFC issue to site & shop & controlling the As-Built drawings.
• Assisting Project Manager to prepare Risk Register to forecast Risks in the project & manage / mitigate them as per priority.
• Arranging & Allocating resources - manpower, materials, consumables & equipment in advance as per plan, priority and sequence for smooth operations and to get the planned productivity
• Achieving the given task and scope within the budget and schedule
• Mitigating the plan/schedule if any schedule slippage due to unexpected situations and or critical path activities
• Utilizing the scrap materials for temporary fabrication aids/supports - saving company cost
• Conducting Internal Audit to rectify the weak part of internal departments and supporting to improve the same
• Always maintain good safety & motivate the people for the same - conduct training & TBT
• Liaising & supporting Proposal team in bidding stage for estimation of resources required.
• Liaising with commercial, planning & project team in budget split up & cost code for construction activities to have better control on Cost.
• Reviewing & approving Method Statements & TRA for all construction related activities
• Coordinating with Engineering, QA/QC, HSSE and having good communication at all the time to complete the task with quality, safety & productivity.
• Preparing Punch list for mechanical completion and liaising with Commissioning team
• Performing the job as per International Standards, codes & client specifications (e.g. DNV, AWS, EMMUA, ASME, ADGAS, SAES)
• Continuous monitoring of Consumables, tools, materials & equipment and coordinating with Procurement/warehouse for current & upcoming projects for smooth operations
• Reviewing the daily & weekly progress with Yard manager and taking remedies to improve the productivity and advising the construction team accordingly - Implemented Job Card system
• Preparing Lesson learn Register for all projects and communicate to relevant team to avoid mistakes / taking action for coming projects
August 2013
To June 2014
Production Engineer
at Adyard Abu Dhabi LLC - Interserve
Location :
United Arab Emirates - Abu Dhabi
• Achieved the given task and scope within the budget and schedule
• Arranged project & aid materials in advance with contingencies and maintain proper record to avoid last minute surprises
• Prepared Method statement for all construction activities
• Deployed right supervisors for the right job
• Prepared Preplanning, estimation & micro schedule for all major activities
• Raised DCR, PCR for any design or scope variance & claimed against client
• Coordinated with all internal departments, subcon & client for good construction flow
• Read the scope of work thoroughly before start job and saved plenty of company cost
• Updated and reported daily & weekly progress reports
• Arranged project & aid materials in advance with contingencies and maintain proper record to avoid last minute surprises
• Prepared Method statement for all construction activities
• Deployed right supervisors for the right job
• Prepared Preplanning, estimation & micro schedule for all major activities
• Raised DCR, PCR for any design or scope variance & claimed against client
• Coordinated with all internal departments, subcon & client for good construction flow
• Read the scope of work thoroughly before start job and saved plenty of company cost
• Updated and reported daily & weekly progress reports
February 2012
To July 2013
Production Engineer / Deputy Construction Manager
at Saipem
Location :
Indonesia
• Achieved the given task and scope within the budget and schedule
• Arranged project & aid materials in advance with contingencies and maintain proper record to avoid last minute surprises
• Prepared Method statement for all construction activities
• Monitored and controlled the Materials in good manner as per priority throughout the projects
• Prepared Preplanning, estimation & micro schedule for all major activities
• Raised DCR, PCR for any design or scope variance & claimed against client
• Coordinated with all internal departments, subcon & client for good construction flow
• Read the scope of work thoroughly before start job to avoid any flaw during construction stage
• Reviewed and reported daily & weekly progress reports through work pack
• Arranged project & aid materials in advance with contingencies and maintain proper record to avoid last minute surprises
• Prepared Method statement for all construction activities
• Monitored and controlled the Materials in good manner as per priority throughout the projects
• Prepared Preplanning, estimation & micro schedule for all major activities
• Raised DCR, PCR for any design or scope variance & claimed against client
• Coordinated with all internal departments, subcon & client for good construction flow
• Read the scope of work thoroughly before start job to avoid any flaw during construction stage
• Reviewed and reported daily & weekly progress reports through work pack
November 2010
To March 2012
Project Engineer
at edaran asia pvt Ltd
Location :
Singapore
Project management
leading projects
progress reporting and preparing invoices
leading projects
progress reporting and preparing invoices
December 2009
To October 2010
Project Engineer
at Archirodon Construction overseas
Location :
United Arab Emirates - Dubai
Preliminary responsible person for all mechanical activities in the Dubai LNG Import Terminal Project as Mechanical Engineer and managed entire project cycle from Engineering to Construction.
• Prepared Method of Statements as per the Clients’ project Management procedures and
International Standards.
• Prepared Permit to work (PTW) for all mechanical kind of activities.
• Erected the piping, valves, flanges and Instruments as per the approved P&ID in the
Offshore Platform as well as Onshore Site.
• Liaised with marine diving team for connecting and testing the subsea pipelines.
• Monitored the complete site activities for the construction of Piping and Pipeline.
• Made and verified Protocols for all flange tightening joints in the project.
• Coordinated with QC Team for inspecting all project materials and getting approvals.
• Prepared Test Pack and check list for Hydrostatic Testing and Pre-commissioning.
• Fabrication done by using the international code ASME sec VIII and B 31.3.
• Monitored and updated the materials usage and welding consumables for construction.
• Engineer -In-charge & permit holder for all mechanical activities in site.
• Conducted monthly Flawless meeting with client for the tightness (FMS).
• Coordinated with Project and Quality departments for completing the project without any issue.
• Coordinated and followed the HSE for safe working condition.
• Worked as a Flange Protocol Manager (FPM) in the flawless team.
• Prepared & Updated the Planning & Project Management chart for Mechanical works
and explain to the client about the job completion.
• Coordinated with Blasting, Coating and Painting team.
• Planned and scheduled the work accordance with the clients’ project procedure.
• Prepared Volume, Man-hour, Man power estimation and material cost assessment for work.
• Involved & completed the task of the Testing, Pre-Commissioning and Commissioning
Start Up with 100% of success.
• Prepared Method of Statements as per the Clients’ project Management procedures and
International Standards.
• Prepared Permit to work (PTW) for all mechanical kind of activities.
• Erected the piping, valves, flanges and Instruments as per the approved P&ID in the
Offshore Platform as well as Onshore Site.
• Liaised with marine diving team for connecting and testing the subsea pipelines.
• Monitored the complete site activities for the construction of Piping and Pipeline.
• Made and verified Protocols for all flange tightening joints in the project.
• Coordinated with QC Team for inspecting all project materials and getting approvals.
• Prepared Test Pack and check list for Hydrostatic Testing and Pre-commissioning.
• Fabrication done by using the international code ASME sec VIII and B 31.3.
• Monitored and updated the materials usage and welding consumables for construction.
• Engineer -In-charge & permit holder for all mechanical activities in site.
• Conducted monthly Flawless meeting with client for the tightness (FMS).
• Coordinated with Project and Quality departments for completing the project without any issue.
• Coordinated and followed the HSE for safe working condition.
• Worked as a Flange Protocol Manager (FPM) in the flawless team.
• Prepared & Updated the Planning & Project Management chart for Mechanical works
and explain to the client about the job completion.
• Coordinated with Blasting, Coating and Painting team.
• Planned and scheduled the work accordance with the clients’ project procedure.
• Prepared Volume, Man-hour, Man power estimation and material cost assessment for work.
• Involved & completed the task of the Testing, Pre-Commissioning and Commissioning
Start Up with 100% of success.
June 2006
To December 2009
Project Engineer
at Ramakrishna Engineering Company
Location :
India - Chennai
Preliminary responsible for all mechanical activities in the ONGC Projects as Mechanical
Engineer and managed entire projects from Design to Construction.
• Checked all Equipment’s like Pressure Vessels, Storage Tanks, piping & Pipeline
Design and detailed drawings.
• Responsible for Mechanical Data sheets preparation of Pressure vessels and Tanks
developing equipment narrative specifications.
• Checked and verified Piping & Pipeline drawings and released to shop for fabrication.
• Understanding and applying the Fabrication requirements of ASME Boiler and Pressure
vessel Code Sec VIII.
• Coordinated with the design team and giving the advanced output to the client.
• Modified the design changes in the pipeline routings as per client’s requirements.
• Individually Handled fuel/Oxy Tanks fabrication project and completed without any
quality issue.
• Coordinated with QC and Project Team for completing the project scope within the time period.
• Prepared Test Pack and check list for Testing and Pre-Commissioning.
• Installed the Piping and Pipelines as per approved P&ID.
• Involved in the Agni Missile Vessels fabrication and tested with 0% leakages.
• Completed the Oxy and fuel tank manufacturing within the given time period.
• Reviewed Technical Documents and Prepared Equipment Data sheet.
• Got the safety reward for achieving the safe working at site with 0% accident.
Engineer and managed entire projects from Design to Construction.
• Checked all Equipment’s like Pressure Vessels, Storage Tanks, piping & Pipeline
Design and detailed drawings.
• Responsible for Mechanical Data sheets preparation of Pressure vessels and Tanks
developing equipment narrative specifications.
• Checked and verified Piping & Pipeline drawings and released to shop for fabrication.
• Understanding and applying the Fabrication requirements of ASME Boiler and Pressure
vessel Code Sec VIII.
• Coordinated with the design team and giving the advanced output to the client.
• Modified the design changes in the pipeline routings as per client’s requirements.
• Individually Handled fuel/Oxy Tanks fabrication project and completed without any
quality issue.
• Coordinated with QC and Project Team for completing the project scope within the time period.
• Prepared Test Pack and check list for Testing and Pre-Commissioning.
• Installed the Piping and Pipelines as per approved P&ID.
• Involved in the Agni Missile Vessels fabrication and tested with 0% leakages.
• Completed the Oxy and fuel tank manufacturing within the given time period.
• Reviewed Technical Documents and Prepared Equipment Data sheet.
• Got the safety reward for achieving the safe working at site with 0% accident.