Construction of Tunnel 2-1 East and 1F8 Portal:
Construction of Tunnel T2-1 East: a 303m long tunnel with 70m cut and cover section and remaining as open trough in the median of King Abdullah road Riyadh. Works includes excavation, shotcreting, waterproofing, concrete works, installation of steel prop beams, fireproofing works and all related electrical works.

Construction of 1F8 Tunnel Portal: a 217m long Open trough section on AL Batha Street, Riyadh. Works include secant pilling works strut installation, toe grouting, tie backs installation and grouting works, excavation, shotcreting, waterproofing, concrete works, installation of steel prop beams, fireproofing works, construction of 31m long TBM retrieval shaft and related electrical works.

Construction of deep Underground Station (1F8): Secant Piling works, Bearing piles, excavation concrete structure works, installation of King Posts (Plunge Columns), Block Masonry etc.

Site Manager في AL-FUTTAIM CARILLION LLC
  • الإمارات العربية المتحدة - دبي
  • مايو 2008 إلى فبراير 2014

 Burj Dubai Infra Structure works (EMAAR), Dubai, UAE
 Dubai Mall Storm water Discharge project
Construction of collection tank, construction of Pumping station 09 and 10 along with oil interceptor construction, laying of storm water line, Pipe Jacking works, MCC rooms for pumping stations 09 and 10, creek out fall connection at two location at existing creek.



 Al-Raha Beach Development Project (Aldar Properties PJSC), UAE

 Const. of Town Houses and Al-Maha 1 Tower
Construction of town houses (Structural and finishes works, Construction of Al-Maha 1 tower works includes structural works, finishes works, Curtain walls, shop fronts and green box structural and cladding works, External rendering works.

 Promenade Complete works and Landscaping works
Excavation works for canal that includes sea wall exposing, Drainage Network that includes laying storm water piping, junction pits, catch pit and outfall to sea, Potable water network includes water pipelines, connection to water main etc.
LV cables with installation of street and landscape lighting, feeder pillar, service cabinets and control cabinets.
Landscaping works includes planters construction, hardscaping, softscaping and related irrigation networks.

 Channel Street and Landscaping works
Roadway Excavation until formation level, Road Works such as Sub grade, pervious fill, Sub base, road base, wearing course, Lay kerbs, etc. Services works such as, LV, street lighting, Traffic control system and related foundations with feeder pillars, service cabinets, control cabinets and road crossing ducts etc. Landscaping (hardscaping & softscaping) with related irrigation works.


 Emirates Aluminium Smelter Abu Dhabi, UAE
 Potlines 3A & 3B
Precast of 100-ton tap line, 27-ton duct line slabs, Busbar foundations & draw pits.
Precast of Control building components (walls, Column, Beams and parapets)

 Carbon and reduction area construction works
Construction of furnace building and related underground services such as potable water supply system, fire water, sea water piping and oil and gas pipe line system laying and testing, Construction of coke conveyor foundations, Construction of HTM building, Anode rodding shop, Hot bath removal area and chimney foundations.


 Power Plant Construction works (Phase 1)
Construction of Conveyor belt foundation and Underground services
Structural foundation, pile caps and slab works, Installation of rails for offshore gantry crane, Installation of drainage networks and potable water networks.

Seawater Intake Excavation
Deep well dewatering until -21m, Excavation of intake, aeration basin structures to -13m.

Construction of STG and BOP foundations, structural works, and related Underground Services
Excavation works, Construction of cooling towers and its related steel structure works, Construction of steam turbine generator building / foundation works, Construction of water treatment building (foundation and structural works),
Construction of PCM building, Construction of water (potable and service) system and testing, fuel tanks foundations, Underground utilities such is underground duct for power cables, fire water network, storm water network, potable water network, Gas line, fuel lines with leak detection system etc.

Seawater and circulation water lines
Excavation works, GRP 2.4m diameter- seawater and circulating water line, Backfilling works.

 Smelter Construction works
Excavation works, Foundations works for pot lines, Construction of gas treatment centres.

Project Manager في KKP (PVT) Ltd.
  • غير ذلك
  • مايو 2006 إلى مايو 2008
Area Superintendent في Abdul Rehman Al-Otaishan Group
  • المملكة العربية السعودية - الدمام
  • مايو 2003 إلى مايو 2006

 Oil and Gas and Petrochemical, Kingdom of Saudi Arabia
 Saudi Aramco, Abqaiq, KSA.
Building construction (Concrete Structure/ Steel Structure), Heavy Foundation Works, Concrete Repair works, Fencing, Fire Proofing, building renovation and maintenance works and manpower supply at Abqaiq Main Plant, North Ghawar Producing Dept. (NGPD) including all GOSP’s (Gas Oil Separation Plant), Water Injection Plants (WIP’s, all WIP Plants in Eastern Region) and related communities / towns.

 SABIC, Al-Jubail, KSA.
Long form maintenance project Concrete Repair and thermal insulation works at SADAF, SAFCO, SHARQ, SUB-TANK, IBN BAYTAR, BIN ZAQR (PERTOCHEMICAL COMPANIES OF SABIC).

Olefin-III Construction Project as subcontractor to Keller and Samsung Engineering

Execute civil works such as access roads, Concrete foundation works, Fencing and Geotechnical improvement of existing/ natural soil with stonelatic piling through vibro compaction at Petrokemya SABIC, Al-Jubail.


PVC DBN Project Ibn-Hayyan SABIC subcontractor Mustang Tampa, Florida.

Construction of Steel and Concrete Structures and small team buildings, Thermal insulation works at Ibn-Hayyan SABIC.
Painting (protective coating) works.

Site Engineer في USMAN AND COMPANY, Karachi (PAKISTAN).
  • باكستان - كراتشي
  • سبتمبر 2001 إلى أبريل 2003

 Air Force officer Housing scheme batch 8 & 9

Works included were earth works and site preparation, foundation works, houses structural works and finishing works.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في NWFP University of Engineering and Technology Peshawar, Pakistan
  • سبتمبر 2001

Specialties & Skills

Construction Engineering
Construction Methods
Civil Engineering
Construction- Civil

اللغات

الانجليزية
متوسط

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
December 2010
صالحة لغاية:
December 2010