Syed Muhammad Ehtesham Syed, Mechanical Site Engineer

Syed Muhammad Ehtesham Syed

Mechanical Site Engineer

Descon Engineering

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, Mechanical Engineering
Expérience
16 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 4 Mois

Mechanical Site Engineer à Descon Engineering
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis décembre 2011

Responsibilities:
1- Managed MEP (Monthly Erection Plan), resources, manpower and execute it accordingly.
2- Experience in Erecting and alignment of static and rotary equipment.
3- Experience in Erecting scheme submission and its approval.
4- Carrying out all the construction, erection works as per method statements and Borouge specifications.
5- Understanding P&IDs, piping isometrics, equipment installation drawings for the regular generation of work front for site supervisors.
6- To attend Toolbox meetings to establish scope of work activities such as safety requirements permits to work, special tools and materials.
7- Develops the project Implementation Strategy.
8- Plans and prepares the project programming covering all phases of each assigned project.
9- Responsible for the preparation & execution of the jobs as per scope of work.
10- Monitor material management function with respect to project materials and equipment.
11- Understanding of API 686 for Machinery Installation.
12- Reporting to in charge Equipment with regard to engineering progress and performance, to highlight concerns, and to make recommendations and seek guidance for resolution.
13- Piping fabrication and erection, equipment erection and pre-commissioning activities for PE polymerization area at Borouge-3 project.
14- Killing punch list for pressure test packages and making pipelines ready for commissioning.
15- Meeting with the vendors regarding installation procedures and engineering problems if any.

Maintenance Engineer à Mobil Oil formerly Exxon Mobil Pakistan
  • Pakistan - Karachi
  • juin 2009 à novembre 2011

Worked on Lube Oil Blending Plant having the production capacity of 1 million liters/ month. Also worked as a Shut Down Planning Engineer during Annual Shut Down. Activities include:
1- Overhauling and routine maintenance of rotating equipments like centrifugal compressors, pumps, and hydraulic filling machine of KOBE and EBARA makers etc.
2- Condition-based monitoring of machinery equipment.
3- Contribute towards sustained and reliable operation through development and implementation of Machinery Reliability Plans.
4- Technical knowledge of API guidelines related to Machinery equipment selection, commissioning and operation. Thorough review and understanding of API 610, API-614, API-616, API-617, API-618 and API-670.
5- Lead Safety related audits, weekly and daily safety talks and other safety related activities of the area.
6- Make long term Maintenance Plans for critical stationary & rotating equipment.
7- Turnaround and shutdown Planning.
8- Developed KPI to gauge both functional and safety performance of the unit
9- Ensuring that all maintenance staff are adequately trained and informed of changes in work-related legislation.
10- Recommend and implement improvements, which will maximize the efficiency of maintenance work and reduce future maintenance requirements.
11- Review Work Orders for completeness and accuracy and ensure that Work Orders are properly entered and closed out in the Equipment Log Sheet.
12- Preparation of Annual Maintenance & Facility construction plan.
13- To communicate effectively with the plant team relative to the condition of the plant equipment and performance and to provide suggestions for improvements.
14- Spares Management & Inventory Control.

Project Engineer à Coastal Refinery Limited
  • Pakistan - Karachi
  • décembre 2008 à mai 2009

Worked on the SPM Buoy an Offshore Oil Transportation Jetty installed after 15 KM from BYCO Oil Refinery. Activities include:
1- Managing Procurement.
2- Managing Refurbishment activities like welding, cutting & painting at Karachi Port Trust.
3- Installation of Cross Junction Guide to connect Hose pipe of 48 dia inch with SPM in sea.

Production Engineer à Atlas Engineering Limited
  • Pakistan - Karachi
  • janvier 2008 à novembre 2008

Worked in Automobile Manufacturing Plant. Major responsibilities include learning the operation and maintenance of CNC Machines. 1- Make daily production plans & execute them accordingly.
2- Ensure machine running condition & plan for preventive maintenance.
3- Ensure good quality by good practices of defect analysis & corrective actions.
4- Coordinate with customer for demand fluctuation & priority orders.

Éducation

Baccalauréat, Mechanical Engineering
  • à NED University of Engineering & Technology
  • décembre 2007

Graduated Mechanical Engineer from NED University of Engineering & Technology

Specialties & Skills

MS Project
AutoCAD
Primavera P6
• Pro-E• Ansys• MS-Office.• MS-Project.

Langues

Anglais
Expert
Urdu
Expert

Adhésions

Pakistan Engineering Council
  • Registered Engineer
  • January 2008

Formation et Diplômes

Introduction to Project Management (Formation)
Institut de formation:
Pakistan Institute of Management & Sciences
Date de la formation:
April 2010

Loisirs

  • Long Drive, Hotelling, Shopping, Reading Books