Three buildings every one (16) floors (one compound 140 flat
FIVE buildings (6+1) floors (one compound 50 flat
-Structural Design Integrated residential complex consisting of 1, 000 villas in
-Structural Design three Schools, Tow Restaurants, Mosque, Turkish bath, Swimming ball, Hall Shopping and Weddings hall .
IN -Kirkuk- Hawija . IRAQ
MIMAR READY MIX & CONSTRUCTION- ALEPPO, SYRIA 2007 - Present
-Design and supervise various Industrial facilities.
. Reinforced Concret Ground water tank with a capacity of 50, 000 m 3(contractor)
. N2 Factories (Aleppo industrial city).. Prefabricated Reinforced Concret.
. N2 Factories (Aleppo industrial city) .. Steel Structure (Consultant)
. Housing association composed ( Almaarri ) of 65 villas (supply of Concret & Consultant), with Roads, Sewage System, Water supply, .. etc
-Project manager at Mimar Ready mix company.( Sale and supply of Concret)
-Project manager at Mimar engineering and Construction Company (Construction of Trade building ) As Owner .
. N4 Apartment buildings (Apartment N(82) (Construction and Finishing))
ALWATANIA READY MIX COMPANY. 2000 - 2007
-Project manager at Alwattania Ready mix company.( Sale and supply of Concret)
- Execution of the project Sheraton Aleppo Hotel / business structure and supply concrete .( As contractor )
- Execution of the Real Estate Bank Building - Aleppo / As contractor .( Construction & Finishing ) .( As contractor )
- Structural design and supervision for various facilities
- Study and Execution of the expansion of plant medicines Asia Company
-The study of construction of the Faculty of Medicine at the University of Alandalus - Qadmous - Syria .
- The study of construction for the city of student housing at the University of Alandalus - Qadmous - Syria .
- Construction study of the Hospital Dr. Badr al-Din Asi - Aleppo - Syria
HISHAM ISMAIL CONSTRUCTION COMPANY. 1995 - 2000
Project: Construction Of Dam ( Tishreen Dam at the North of Syria inclusive all structural work, Earth work, services Roads and all required facilities .
( As contractor ) With Syrian Arab Republic for generating the electrical power.
- Casting of about 90000 m3 Reinforced Concert at (Hydroelectric Station ) .
Consist of 6 groups for generate the electricity power with total capacity 630 Mega watt
- Structural Execution of the administration building (5 floors*1000 m2 ) of prefabricated concrete .( columns, beams, slabs )
- Execution of prefabricated concrete bridges for road crossing the dam (400 m.l ) .
- Coating the shoulders of the Dam by reinforcement Concrete .
Manager of Supervision :
• Construction of Transformer Power Station 66/20 KVA - Aleppo.( Construction & Finishing ) .
• Construction of Aleppo thermal power station . 1000 Mega Watt ( Mitsubishi. com - Contractor) .
- The general location (excavation and backfill, roads, water supply, sewer) .. etc.,
- Consist of 5 groups for generate the electricity power with total capacity 1000 Mega watt,
- Five Concret Chimneys, length of each 100 m .
- All industrial facilities and ancillary services, and administrative buildings.
- Buildings housing the Worker, Consists of 30 villas and 1000 apartments
Bachelor of Science (CIVIL), 1985 ALEPPO-SYRIA