Senior Electrical Engineer
Worleyparsons - Saudi Arabia
Total years of experience :16 years, 3 Months
Job Title: Electrical Engineer II / Al Khobar Branch.
Purpose: To Design and Engineering Offshore Projects.
Recent Projects Handled in 2018 to 2021:
SFNY Increment Program, Starting Oct-2021.
ZULF Increment Program, Overall Power Supply Study under BI 10-12741
Upgrade ZULF AM Platforms
MARJAN Increment Program.
Upgrade Fire System Protection System at Ju’aymah Platform.
ABU SAFAH Electrical Distribution Platform and new Wellhead Platforms.
MARJAN TP-10 and Associated Facilities.
Relocate Control Room from Production Platform to Accommodation Platform at ZULUF GOSP-4, MARJAN GOSP-2 & 3.
-Duties & Responsibilities
• Preparation of Specification and Data Sheet
• Preparation of Purchase Requisition
• Scope of Work Preparation
• Design Drawings Package Review
• Study Contractor reports
• Engineering Document Preparation
• Engineering Calculation Preparation
• Contractor Technical Query Response
• Vendor Technical Query Response
• Comments response to Saudi Aramco
• Coordination with Electrical Design Team
• Inputs to other Discipline
• Site Visit to Offshore Platforms
• Cable Sizing and Voltage Drop Calculation
• ETAP Study and Arc Flash Analysis.
• Cable Schedule Preparation
• Electrical Load Schedule Preparation
Purpose: To work as SMP at Saudi Aramco, DOB/Wasit Gas Project (WASIT LATERAL LINES TIE-IN AT BERRI AND KHURSANIYAH GAS PLANTS).
Purpose: To Design and Engineering the Assigned Projects.
Responsibilities:
1- Report to Branch Manager.
2- Designing Electrical and Instrumentation for ARAMCO Projects.
Duties:
1- Design Electrical and Instrumentation System for the Assigned Projects, Mostly ARAMCO Plant Projects in ABQAIQ.
2- Produce Mark-up Design Drawings for the CADD Operator.
3- Checking of Finished Drawing as Per ARAMCO Standard.
4- Drawing Search, Checking ARAMCO Standard and NEC Standard.
5- Drawing Control Lists and Material Lists.
6- Coordinates With Other Discipline Regards to The Design and Engineering.
7- Attend Meetings as Required.
8- Do Scope of Work as Required.
9- Site Survey or As-Built As Required.
10- QA/QC Design Drawing Updated CADDED.
List of Projects which I did for ARAMCO COMPANY :
Provide Ventilation to The Generator Room in ABQAIA GOSP-2.
Relocation of Motor Control Center and Other Equipments from MCC Room to Substation-87.
Demolition of Boiler #1 in ABQAIQ Plant.
Replace IQ-1000 Relays by SR-369 Relays in Uthmaniyah GOSP-4.
Install New Micro-Turbine in Haradh Gas Gathering Manifold.
Provide Fire Alarm and Smoke Detectors System at Shedqum GOSP-1.
Flare Gas recovery System (Power System Study by ETAP Program)
Provide Fire Alarm and Smoke Detectors System at King Fahad International Airport.
GPA: 2.29 (out of 4.00)