ZAKUM Development Company (ZADCO) UAE (04/6/2008 till Present):
Worked in ZADCO (one of ADNOC companies, JV with Exxon Mobil) as an electrical engineer in the
Maintenance support Department on ZIRKU Island where the main facility of the oil and gas processing exists
prior to oil and gas export.
Duties included giving required assistance the electrical maintenance and operations team while carrying out
major maintenance activities of the various electrical equipments.
Also supervising the outsourced contractors during projects implementation, Electrical Equipments installation
testing and commissioning as a part of the electrical power system complete renovation and refurbishment,
ensure proper and safe implementation of the work done by the contractor as per company issued scope of
work as well as relevant standards and recommended work practices, raise and coordinate PTW and
preparation of JSA.
This includes projects of Packaged S/S replacement, transformers replacement (Up to 25.6 MVA), New HV
Switchgears (GIS), Distribution boards and cabling installation, low voltage switchgears, UPS's, Battery chargers
replacement, power transformers replacement, analysis and health check of electrical equipment and
transformer oil replacement, PCB contaminated oil replacement, generators refurbishment and repair,
Cathodic Protection System Renovation, Heaters Burner Management System Upgrade, installation and testing
of fire alarming and detection systems, H2S wireless detection system, new RO and chlorination units, lighting
projects.
Tel: + (971) 50 5920382 / +(20) 11 48616122• e-mail
Behind 75 el Geish way, sporting, Alexandria (Egypt)
Duties included:
Provide assistance to the Senior Engineer in defining the technical requirements and in the performance
of engineering for the assigned works.
Participate in site surveys of existing facilities to establish and identify the actual requirements.
Participate in monitoring and reviewing engineering design carried out by Consultant/Engineering
Companies including feasibility, conceptual, basic and detailed engineering.
Coordinate with other engineers during the development of the works, to ensure conformity of
engineering with user’s requirements.
Prepare technical documents including data sheets and requirements for material, testing and
requisitions.
Participate in the clarification meetings with contractors and Vendors to ensure compliance with
technical specifications & requirements. Assist the Senior Engineer in the provision of Technical
Evaluation and appraisal reports.
Review the update technical drawings for the installations and ensure conformity of the as-built status
with the Design and Technical requirements.
Participate in the development and updating of the cost estimates and schedules for the works.
Assist the JO in the HQ in the provision of technical support on all engineering aspects arising in his
discipline during the Construction phase of projects.
ELNG is a JV with British Gas (BG), PETRONAS and Gas De France,
Worked as an Electrical Specialist in the maintenance department. My Duties includes performing as well as
supervising the different maintenance, troubleshooting and planning of all the electrical related activities. It
includes also planning and preparing for the activities carried out during the process planned shutdown. The
Involved equipments included:
4 Gas Turbines (17.2 MVA ISO rated Each, Siemens, 11 KV)
8 Substations (11 KV, 3.3 KV and LV distribution switchboards, ABB Unigear).
4 Emergency diesel generators (CUMMINS)
3.3 KV motors (for inst air compressors, LNG loading pumps, Turbo compressors starter motors …etc).
About 500 LV motors driving fan coolers and pumps
38 step down transformers to the different utilization voltage levels serving the 8 substations.
UPS's (C.E.G. Italy) and Battery Chargers (ABB)
Duties also covered analysis of the equipments failure and history, preparation of purchase requisitions for the 2
years spare parts, updating the Maintenance work instruction when required and prepare of maintenance
checklist, defining and purchasing the required electrical tools and special measurement and logging devices,
following up the permit to work system and isolation activities in the HV switchgears.
I also took part in the team responsible for making a bid for the Gas turbines service agreement between the
OEM and competitive companies.
RASHPETCO is a joint venture with BG, Edison and PETRONAS, a gas company producing about 40% of Egypt’s
gas production
Tel: + (971) 50 5920382 / +(20) 11 48616122• e-mail
Behind 75 el Geish way, sporting, Alexandria (Egypt)
Worked as a Senior Authorized Electrical Maintenance engineer (SAEP) in the company electrical department.
This includes maintenance, troubleshooting and operation of the onshore and the offshore terminals and
facilities as well as the electrical equipments of the remote export terminals; this covers the preventative,
protective and corrective maintenance of the following equipments:
Gas turbines & Generators:
Speed controllers' software configuration and maintenance
Caterpillar, Deutz and Perkins Emergency diesel generators, control system and generators
protection.
Switchgear operation, protection system and maintenance
Power and distribution transformers.
Cathodic protection system
UPS and chargers
Other plant auxiliary electrical equipments
Electric heaters for Natural Gas
Distributed outlets and welding sockets.
HVAC units
Cathodic protection system (Impressed current system).
Plant earthing network.
Electrical power analysis and Database tools:
Power and Harmonic Analyzer
Transient and power system disturbance analysis.
Power Quality monitoring & Electrical Data Loggers.
Electrical Distribution Supervisory system