shift charge engineer
dubai electricity and water authority
Total years of experience :23 years, 7 Months
From october2008 - till now
* Commissioning Engineer For:-L STATION PHASE 2 and K STATION
Desalination plant (4*14.7 MIGD) by FISIAITALIMPIANTI CO.
Gas turbines (4*250 MW) by SIEMENS V94.3A
HRSG’S (4*450 T/HR, with duct burner ) by NEM CO.
Auxiliary fired boilers (450 T/HR) by NEM CO.
steam turbines (2*230 MW) by ALSTOM
DCS control program TXP by SIEMENS
Natural gas reducing station by ROTIRNG CO.
All above with LAHMEYR INTERNATIONAL consultant engineer
From may2000 - april2002
Work as senior operation Engineer in ataka steam Power Plant 900 MW (2x300MW)
(2 x150 MW)
From april 2002 - november2005
work as senior Operation Engineer Talkha steam power station ( 2×210) MW.
From november 2005 - october2008
Work as shift Operation Engineer in The New Talkha Power Station 750MW Combined Cycle Project (2x250 MW SIEMENS V94.3A Gas turbine and 1x250 MW ALSTOM Steam Turbine).
Attendance the constructions of the Gas turbine and the Switch Gear (6.3KV).
Attendance commissioning, performance tests, ignition, 1st synchronizing & reliability tests for 2 gas turbine units 2×250MW(V94.3A).
Attendance the constructions of the ALSTOM Steam turbine&its auxiliries.
Attendance the constructions of the cmi hrsg &its auxiliries.
Participate in all tests of cmi hrsg like (chemical cleaning, steam blow)
From 26th JUNE 2007 to 30th JUNE 2007 :-
Outdoor training performed at Prague(Skoda Praha) in Basic Operation Training Course Heat Recovery Steam Generator and Auxiliaries.
From 23th JUNE 2007 to 25th JUNE 2007 :-
Outdoor training performed at Lutin (Sigma) cshez republic For sigma’s pumps operations.
From 4t june 2007 to 22th june 2007:-
outdoor training performed at SEARING (Belgium) inOperation Training Course Heat Recovery Steam Generator and Bop.
From 28th November 2005 to 23th December 2005 :-
Training in Germany in SIEMENS Power Generation in the courses:
- Basic Operation Training (Introduction to the Plant, Electrical and I&C Part, Gas turbine and Plant Operation) To operate 2×250MW (V94.3A) gas turbine
- Indoor training for 6 weeks with siemens to operate 2×250MW V94.3A units