طارق الخطيب, Project Manager

طارق الخطيب

Project Manager

IMCO Engineering & Construction Co.

البلد
الكويت - الأحمدى
التعليم
بكالوريوس, Electrical Engineering / Power
الخبرات
19 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 10 أشهر

Project Manager في IMCO Engineering & Construction Co.
  • الكويت - الأحمدى
  • أشغل هذه الوظيفة منذ مارس 2019

• Reporting to Senior Project Manager
• Planning of daily, Weekly & Monthly Site activities for OHL Maintenance Works
• Review and discussion of dead Line washing and maintenance programs in coordination with client/MEW to meet their requirements networks
• Manpower, Material & Equipment’s Management.
• Direct supervision of 180+ Manpower including Site Engineers, Foremen, Linemen, Drivers, Operators & Helpers
• Controlling and monitoring project performance to assure project objectives are met
• Preparation and Arranging of Monthly Invoices for submission to client/MEW

Sr. Electrical Engineer في STFA Construction Group, Turkish Co.
  • الكويت - الأحمدى
  • أغسطس 2013 إلى مارس 2019

Position : Electrical & LV Systems Construction In-charge 1 Feb. 2016 - Up to date Location : Abu Halifa - Near to Minus Complex
Project : Small Boat Harbours
Project Brief : Marine Works and Construction of 52 different use Buildings (26 in North Harbour & 26 in South Harbour) including 7 nos. Substations, Onshore Buildings, Offshore Buildings, Administration Buildings, Engineering Buildings, Mechanical and Marine Workshops.
Client : Kuwait Oil Company ( KOC )
Main Contractor: STFA Construction Group
Duties & Responsibilities:
• Reporting to MEP Construction Manager.
• Site preparation & organization of the site activities and working groups for 4 nos. different use large buildings and marine services.
• Manpower, Material & Equipment’s Management.
• Direct supervision for 100 Manpower including Supervisors, Foremen, Electricians, Instrument Technicians & Helpers
• Planning of daily, Weekly & Monthly site construction activities for Electrical Systems (Lighting, Lighting Control, Earthing, Lightning Protection & Small Power Systems) & LV Systems (Fire Alarm, Communication, Security, Public Address & Power Automation Systems)
• Coordinates various phases of design and construction activities to ensure smooth workflow
• Preparing Typical Installation Details & Shop Drawings for construction activities
• Preparing Electrical Equipment Rooms layout


Position : Senior Electrical Engineer 1 Aug. 13 - 31 Jan. 16
Project : Small Boats Harbour
Client : Kuwait Oil Company ( KOC )
Main Contractor : STFA Construction Group
Duties & Responsibilities:
• Review, Check & Re-issue of Engineering Drawings for Lighting and Small Power Systems Layouts for 56 New Buildings in South and North Harbours.
• Preparing Shop Drawings for Conduits & Cable Trays Works for Lighting & Small Power Systems
• Preparing Typical Installation Details for Light Fixtures, Isolators, DBs & Electrical Panels
• Review, Check & Re-issue Design & Engineering Drawings for 7 Nos. Electrical Substations, including Single Line Diagrams, MV & LV SWGRs Layouts, Transformers, Generators, Load Banks, … etc.
• Review, Check & Re-issue Indoor & Outdoor Lighting Design Calculations - DIALux software
• Preparing all Outdoor and Indoor Lighting Layouts, Cable Route Layouts and Schematic Diagrams
• Prepare & Evaluate Packages for Materials Procurement in line with Project, KOC & KNPC Standards

Sr. Electrical Engineer في IMCO Engineering and Construction Company
  • الكويت - الأحمدى
  • مارس 2007 إلى يوليو 2013

Position : Sr. Electrical Engineer - 1 Apr. 10 - 31 July 13
Project : Integrated Security System for all KOC Facilities
North, West, South and East of Kuwait
Client : Kuwait Oil Company ( KOC )
Main Contractor : Samsung SDS, South Korea
Duties:
Engineering and Design Works for the New Fence Lighting, New Walkway Lighting, Street Lighting, Car Park and Buildings Lighting
Indoor & Outdoor Lighting Design Calculations - DIALux software
Preparing all Outdoor Lighting Layouts and Schematic Diagrams
Preparing Power, Control and Earthing Cables Route Layouts

Position : Site Electrical Engineer / IMCO representative - 16 Jul. 09 - 31 Mar.10
Project : Offshore Associated Gases Project - Package 1
Construction of New Plant for Gas Liquefaction & Pressure Pumping and it’s 33/11 Kv Substation
Das Island / Abu Dhabi
( Manpower Supply to Technip )
Duties:
Supervise construction activities that executed by Electrical Subcontractor in new constructed Substation 33/11/3.3/0.415 Kv
And Train 1, 2 & Common Area Facilities
Manpower Management (in charge of 75 workers; Supervisors and Foremen report to me on daily basis)
Client : Abu Dhabi Gas Liquefaction Company ( ADGAS )
Main Contractor : Technip France - Abu Dhabi, UAE

Position : Project In-charge - 1 Feb. - 15 Jul. 09
Project : MFT 2 & 4 Building Project - Electrical Work / EQUATE , Kuwait
Supply, Installation & Commissioning of all Electrical Works Related to the New Building Including the following systems :
Electrical Lighting & power systems - Emergency Audible Alarm System
Telephone & Data System - Access Control System
Fire Alarm System - Gas Detection System
Duties:
Analysing related technical data & engineering drawings and make necessary changes
Manpower management ( In charge of 55 Workers; Site Engineer report to me on a daily basis )
Procurement
Client : EQUATE Petrochemical
Main Contractor : Projacs International

Project: Emergency Power 2007, Doha, Kuwait.
Installation of Six LM6000 Aero Derivative GE Gas Turbines Packages and Balance of Plant
Installation of 11kV & 415V ABB Switchgears
Installation of MCCs and Distribution Transformers (11kV/415V)
Cable Pulling and Installation (MV, LV, and I&C)
Wiring, Termination, and Glanding
Client: Ministry of Energy & Water - Kuwait
Main Contractor: Creative Power Solutions - Foster Jordan LLC
Duties:
•Responsible for executing all activities required by client on field and submit ‘as built’ drawings (electrical related)
•Manpower Management (in charge of 75 workers; Supervisors and Foremen report to me on daily basis)

Construction and kwh meters Engineer في Electricity Distribution Co. (EDCO.)
  • الأردن - عمان
  • يوليو 2004 إلى مارس 2007

Electricity Distribution Company ( EDCO. )
Ma’an District - Erection Section
Erection and K.W.H Meters Engineer ;

· Building of medium and low voltage Power Networks ( 33 , 11 and 0.4 kv )
· Erection of Medium and Low voltage Overhead and Underground Transmission lines
· Erection of Power Transformers and A.C panels with different No. of feeders and
different capacities .
· Erection and commissioning of 11 and 33 kv Switchgears.
· Erection of different types of Distribution Substations including Packages, Cable
box, and Pole-mounted Substations.
· Erection of Current and Voltage Instrument Transformers .
· Testing and Erection of 3-ph kwh meters with and without CTs and VTs or just CTs
· Test and Erection of 1-phase kwh Meters

الخلفية التعليمية

بكالوريوس, Electrical Engineering / Power
  • في Baghdad university
  • أغسطس 2003

GPA is Good ... Ranked the 3rd in a class of 71 students

الثانوية العامة أو ما يعادلها, scientific
  • في Aqaba school
  • أغسطس 1998

Scientific

Specialties & Skills

Low Voltage
Offshore
Students
Microsoft Office
AutoCad 2004
Lighting Software - DiaLux

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

Jordan Engineering Association ( JEA )
  • Electrical Engineering
  • October 2003
Kuwait Society of Engineers (KSE)
  • Electrical Engineering
  • May 2017

التدريب و الشهادات

Project Management Professional (PMP) (الشهادة)
تاريخ الدورة:
December 2022
صالحة لغاية:
December 2025
Etap (الشهادة)
تاريخ الدورة:
November 2008
صالحة لغاية:
November 2008

الهوايات

  • Swimming, Reading Newspapers, Playing Football, Photography