land surveyor
Larsen & Toubro
Total years of experience :19 years, 7 Months
Responsible of all survey works on these buildings Ultra-Facilities Building (UFB), MCC
Room-3, Disc Filter Tank, Chlorine Contact Tank (CCT) Building, TSE Pumping Station, TSE Lagoon and
Sludge Drying Bed (SDB), Sludge Cake Storage(SCS-1 & 2).
Making control points for the project.
Responsible for all survey work in project.
Prepares or supervises preparation of all data, records, and documents related to surveys.
Develops survey data for as-built drawings and perform.
Project:-
Lahore to Sialkot Motor Way
Downloading of Field survey details from total station instrument into computer.
Import & Export in DXF and DGN format in CAD design.
Calculation of area & quantities.
Responsible for overall Co-ordinate and supervision of all Survey works and projects involving
utility construction.
Infrastructure works like water supply and sewerage, Open Drains, Closed Drains, and storm
water drainage pipe line topological survey, counter survey and profile design and pipe line
vertical and horizontal alignment control and supervision of all kind of activities.
Attending Meeting with client and contractor.
Preparation of Weekly, Monthly, daily Progress Reports.
Preparation AS Built Drawings.
Networking and coordination with all stakeholders.
Project:- King Abdullah Financial Districk City(KAFD)
Setting out coordinates of buildings, columns, walls, slabs, foundation
• Detail study of drawing for avoiding any mistake during work
Checking and preparing all required drawings Making shop drawings cross sections
• Making control points for the project
• Making Calculations for all buildings Setting out
• Responsible for all survey work in project Making monitoring Building, Topography elevations plotting and fixing levels for construction works,
Project:-
Turrbah Interchange Bridge Project
Thamalah Interchange Bridge Project (Taif to Albaha Road)
Responsibilities detail:-
Layout of road according to curve and slopes and setting out of street lights.
Establish control points with reference to bench mark & control levels
All types of setting, horizontal, vertical, alignment control & irregular shaped of building layout.
Observation of X-section and Longitudinal Survey Earthwork volume.
Field Survey data from GPS & total Station to the computer for reference such as topographic, relocation and others.
Project:- Residential Villas(34 Villas)
Use Leica Surveys Construction Stakeouts Settlement monitoring
Record and Easement Plats, and coordinating survey-calculating points.
Control for Civil Land Surveying layouts for building and construction
• Head of Land Surveying department, preparing surveying data coordinates, drawing for layout.
Setting out plans Road center line & Profiles & Cross sections and horizontal & vertical curves. Setting out coordinates of buildings, columns, walls, slabs,
• Making control points for the project
• Making Calculations for all buildings Setting out
• Handling the survey works setting out & level making Traverse control points.
• Responsible for all survey work in project Making monitoring Building, Topography elevations plotting and fixing levels for construction works.
Project:- Wadi Hanifah Restoration Project
As built elevations, lines, angles, areas, and contours. Earthworks volumes
Laying out roads and improvements. Cross section Topographic survey
Topographic bridges Pipelines and experience in Roads & Infrastructures services
• Setting out of Pipe Line survey calculating surveying data. Preparing surveying inspections.
• Detail study of drawing for avoiding any mistake during work
• Checking and preparing all required drawings Making shop drawings cross sections calculate-cut and fill- volumes by surveying methods
• Topography contour map supervision & management of site
• Making control points for the project
• Handling the survey works setting out & level making Traverse control points.
• Responsible for all survey work in project Making monitoring Building, Topography elevations plotting and fixing levels for construction works,
Project:- Water Treatment Plant
AL-RASHID & MANGOUR CONTRACTING COMPANY
Use Leica Surveys Construction Stakeouts Settlement monitoring
Record and Easement Plats, and coordinating survey-calculating points.
Laying out roads and improvements. Cross section Topographic survey
Control for Civil Land Surveying layouts for building and construction
• Setting out coordinates of buildings, columns, walls, slabs, foundation slabs mechanical
• Setting out of Pipe Line survey calculating surveying data. Preparing surveying inspections.
• Making control points for the project
• Making Calculations for all buildings Setting out
• Handling the survey works setting out & level making Traverse control points.
• Responsible for all survey work in project Making monitoring Building, Topography elevations plotting and fixing levels for construction works,
Uploading and downloading data (from & to) Total Station