TARUN BEHL, Asst Project Manager

TARUN BEHL

Asst Project Manager

Probus

Location
India - Delhi
Education
High school or equivalent, Mechanical Engineering
Experience
15 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 0 Months

Asst Project Manager at Probus
  • United Arab Emirates - Abu Dhabi
  • My current job since April 2023

Responsible as Project Manager for multi-disciplinary projects for major O&G and
Industrial clients;Responsible for PMC and Engineering for multi-disciplinary projects for
major clients;
• Organize scope clarification meetings, co-ordinate with multi disciplines concerned
including the level of detail and number of deliverables, estimate man-hours (CTR/Norm
based) for the scope of work established, prepare and submit technical and commercial
proposals against the RFQ;
• Lead the team of multi discipline engineers, coordinate for timely submission of
design deliverables, and ensure Internal Discipline Checks as per approved Design
Quality Assurance Plan.

Asssistant Manager at Coperion ideal
  • India - New Delhi
  • September 2021 to April 2023

handling project and coordinate with client for Site work .

Astt. Manager at M/s Multitex Filteration Engineers Limited
  • India - New Delhi
  • June 2018 to September 2021
Project Engineer at M/s Nasser Al-Baddah Tradding and Construction Co
  • Kuwait
  • November 2015 to May 2018
  • December 2014 to November 2015

Responsibility
•Performed a number of control tasks as a key member of a multi-projects task force.
•Developed and maintained scheduling controls system utilizing Primavera software resulting in accurate and
timely project tracking for local and international projects.Set up and updated project review graphics utilizing Harvard
Graphics, provided graphics design resulting in effective visualization of complex issues.

Project Co-ordinator at M/s Multitex Filteration Engineers Limited
  • India
  • April 2012 to October 2015
at Hyundai Engineering & Construction Co. Ltd
  • United Arab Emirates
  • February 2014 to January 2015

South Korea
Project - Mirfa IWPP 1400 MW Combined Cycle Power Plant

at Saudi Aramco Overseas B.V
  • May 2012 to January 2014

Project- Jet A-1 Fuel Shipping Pump at North Jeddah Bulk Plant .
Responsibility
•Coordinating between project discipline leads to support project-wide deliverables within the appropriate project schedule.
•Capturing and communicating major point to client and coordinate with concen deptt
•Ensuring constructability plans are in place and are being implemented
•Coordinate with Construction and Engineering sections on matters that need clarification
•Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
•Maintaing Weekly Quality report / Monthly Progress report for the project
•Maintain and update daily welding ( Inch per Dia) and Target achive data .
•Planning/Scheduling of minor and major modifications of Process area including Crude Distillation Unit, Vacume Distillation Unit, Visbreaking Unit, Gas Con. Unit, DieselMax Unit, NHT unit, CCR unit, Sulfur Recovery unit, Sulfur Solidification Unit.
• To review/issue daily schedules and verify work orders received in Maximo from different areas and checking their scheduling view of priority and resource availability.
•Coordination with Engineering, Technical Services and the Operations department in planning and execution of maintenance works but not limited to minor/major overhauls, modification works of plants/equipment, pipelines and other installations in the assigned areas.
•To generate, issue and follow up of Preventive Maintenance Plans (Monthly, Six Monthly and Yearly) consisting of approximately 300 work orders per month for plant maintenance, and issuance of their respective PM Reports.
•Follow up and monitoring of preventive and planned maintenance/modification schedules to avoid any plant/ equipment outage and keep the plant running in a safe manner.
•Planning, preparation of work packages, time schedules, and monitoring of shutdown jobs and assist maintenance team in emergency shutdown for availability of material, spares.
• Preparation of lubrication schedule comprising of oil makeup, replacement etc.
•Preparation of cost estimation/back charge reports including manpower/spares/ equipment costs for modification and major shutdown jobs including repairing of exchangers, mechanical seals damages of pumps.
•Preparation of monthly progress reports with graphical representation for management revie reflecting planed and actual man-hours comparison, job history of critical equipments and failure reports.

Gradute engineer training at M/s Indcon Projects Equipment and Limited
  • India - Delhi
  • May 2009 to April 2012

Education

High school or equivalent, Mechanical Engineering
  • at IASE
  • June 2019

courses: Got Appreciation letter from Maddeen Phoshate Company ,Saudi Arabia. •Having Premevera P6 & MSP Certifcation . • Having following ASNT Level – II Certification from American Society of Non Destructive Testing. Radiographic Testing (RT), Ultrasonic Testing (UT), Magnetic Particle Testing (MT), Liquid Penetrate Testing (LPT) AND Visual Testing (VT).

Bachelor's degree, Mechanical
  • at Guru Gobind Singh Indraprastha University
  • June 2009

Specialties & Skills

Engineering
Project Coordination
Project Management
Pressure Vessels
CUSTOMER RELATIONS
MECHANICAL
MICROSOFT WORKS
OIL PAINTING
PROGRESS
SCHEDULING

Languages

English
Expert
Hindi
Expert
Punjabi
Expert

Training and Certifications

PMP (Certificate)
Date Attended:
November 2020

Hobbies

  • playing cricket