tawfeeq Al Sadoon, HSE Manager

tawfeeq Al Sadoon

HSE Manager

BAWABT AL KHAEER (Main contractor for ENI)

Location
Iraq - Erbil
Education
Bachelor's degree, Electrical Engineering
Experience
14 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 1 Months

HSE Manager at BAWABT AL KHAEER (Main contractor for ENI)
  • Iraq - Basra
  • March 2017 to September 2018

• Establishment of HSE Management system for company.
• Prepare HSE plan for project which include but not limited to ( Well pad rehabilitation, Piping works, Electrical works, mechanical works, construction works, maintenance works) according to Eni standards
• Prepare and follow up the implementation of the main action plan aimed to:
 Enhance leading indicators.
 Competency Matrices & Training
 Risk Assessment
 Reporting
 HSE meeting

 PPE management
 Housekeeping and Welfare Improvement
 Safety Induction
• Coordinate and manage the reporting and meeting issues with Eni side .
• Coordinate and manage the training courses for the team in Eni training Centre .

HSE Manager at Lafarge for construction Contracting & General Trading Company Ltd.
  • Iraq - Erbil
  • June 2014 to August 2016

• Manage All H&S issues for Lafarge plants in KRG (Kurdistan).
• Preparing of annual action plans, and follow up the implementation of their elements.
• Development of training programs for staff, such as plant managers, drivers, operators, maintenance staff…etc.
• Assessment and follow up leading and lagging KPIs
• Establishment of communication and reporting system.

HSE Engineer at HABBOUSH GROUP (Main Contractor for Halliburton )
  • Iraq - Basra
  • March 2012 to February 2014

• Preparing of all documents associated with our executed projects such as risk assessment, job safety analysis, and monthly, weekly and daily reports
• Preparing of all our hse instructions and requirements and inform it for all our employees including sub- contractors.
• Executed some of training courses for our staff including subcontractors.
• Prepare a plan to monitoring and inspection to insure of the completely commitment for all’s with hse instructions.
• Prepare a plan to enforcement our hse instructions in all our work sites which include but not limited (zb 185, zb77, zb190, zb 57, zb90, zb 113, zb97, zb112, etc.).

HSE Manager at - Fayha group companies
  • Iraq - Basra
  • January 2009 to November 2011

• Preparation of safety plans for all professional group companies.
• Preparation and implementation for plan and reports associated with eni company work which Include:
 Safety requirements for three rented warehouse by eni.
 Handling and storage for chemical materials.

 Handling and storage for electrical and mechanical equipments.
 Handling and storage for oil pipe in the yards.
• Preparation and implementation of employees training plan which is includes :
 Types of Training such as (Classroom instruction, Job-site safety meetings, On-the-job training written instruction or training materials.

 Specialized Hazard Control Training which is include instruction related to biosafety, chemical hygiene, radiation safety, use and care of respiratory protection, asbestos awareness, etc.
 General Safety Training which is includes office safety, fire safety, and general hazard awareness.
 Training by Supervisors who responsible for developing and presenting job-specific safety training sessions dealing with an employee's unique job assignment.
 Frequency of Training employees shall be provided with safety-related instructions.
• Professional development of safety plans and monitoring their implementation.
• Preparation of all plans and reports for Iraq Crude Oil Export Expansion Project such as( hse plan, emergency plan, job safety analysis, risk assessment, daily and weekly and monthly reports … etc
• Implementation Of Toolbox Talk and daily hse inspection and equipments inspection and new employments induction for Iraq crude oil export expansion project.
• Monitoring to insure that all hse procedure and all main contractor requires are applied in site of project.

Senior Engineer at National Contracting company
  • Iraq - Basra
  • June 2003 to September 2008

Design, planning and implementation of all electrical works for the rehabilitation of the residential village at Basra International Airport, which is included the following:
• Install 11kv overhead for a distance of 3 km and linking it to the high tension circuit breakers system.
• Rehabilitation of two transformers with 1000 KVA for each one.
• Lay of 500 M underground low voltage cables with all preparation and joints works.
• Supply and install all needed low voltage circuit breakers.
• Design and execution all control panels for sewage system.
Rehabilitation of cooling tower for Abulkhaseeb fertilizer factory. Which included the following?
• Supply and install 220 KW motors and connect them with 6.6 KV.
• Supply and install different types of exhaust fans.
• Execution of all wiring works.
Rehabilitation of 33/11 KV kur al zubair distribution substation. Rehabilitation of 33/11 artawy distribution substation.
Al Janoob iron pipe factory.
• Elaboration of studies on the possibility of the installation and operation of the plant producing iron pipes.
• Study the Schemes of the plant in detail.
• Execution all the electrical work to supply the power for the plant.
• Completion of more than 60% of the operating plant. Then completed the work in collaboration with the Germans advisers.

Education

Bachelor's degree, Electrical Engineering
  • at Technology UniversityAl Basra University
  • January 1989

courses: Professional Development and Training: Certificate. Nebosh IGC (International General Certificate) RRC International. Cross culture management centre Erbil

Specialties & Skills

Instructions
Weapons
Operation
Public Policy
REPORTS
RISK ASSESSMENT
MICROSOFT OFFICE
DRIVERS

Languages

Arabic
Expert
English
Expert