Tochukwu Uzoho, Electrical Engineer II

Tochukwu Uzoho

Electrical Engineer II

DeltaTek Energy GE

Location
Nigeria
Education
Bachelor's degree, Electrical/Electronics Engineering
Experience
15 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 10 Months

Electrical Engineer II at DeltaTek Energy GE
  • Equatorial Guinea
  • My current job since July 2013

- Preparation of design calculation sheets e.g. cable sizing calculations, motor starting calculations, equipment sizing calculations, cathodic protection calculations, lighting calculations, equipment datasheets, project MTOs (Material Take-off),
- Preparation of Requisitions, Work packs, Electrical Tie-in schedules, cable schedules, equipment specifications
- Preparation of mark-ups for hazardous area classification details and drawings, cable tray and routing layouts, one line diagrams, grounding layouts to be implemented by a CAD designer.
- Preparation of Cable schedules, load lists, tie-in schedules and specifications.
- Preparation of Panel board and load schedules
- Conduction quality checks on documentation to ensure adherence to company's processes
- Participation and coordination of Health, Safety and Environment talks and looking out for potential hazards so as to correct them or report to the appropriate departments for further action.
- Performing any other engineering job that requires application of knowledge gained over 5years class work in a university.

Also, I do have a knowledge industry wide standards which include API, IEC, IEEE, DNV, e.t.c.
Proficiency in the use of AutoCAD design software, LUXICON lighting software, Microsoft Excel and a basic working knowledge of ETAP.

Electrical Engineer I at DeltaAfrik Engineering Limited ( A DeltaTek and WorleyParsons Company)
  • Nigeria
  • July 2011 to June 2013

I have over 5 years working experience in the design engineering environment covering Conceptual Designs, Front End Engineering Designs, Conceptual Designs working on projects for ExxonMobil, Chevron and Total. Some of these projects include: the Pigging Facilities Upgrade Phase 6 project (Mobil), the Escravos Diesel Storage Terminal project (Chevron), Yoho Gas pipelilne Brownfield verification phase 2 project (Mobil), Yoho YP Brownfield Upgrade project (Mobil), Ikike Field Development Project (Total), Okpohuru Phase 2 Design project (Seplat). Some of the activities carried out on these projects include but not limited to:

- Preparation of design calculation sheets e.g. cable sizing calculations, motor starting calculations, equipment sizing calculations, cathodic protection calculations, lighting calculations, equipment datasheets, project MTOs (Material Take-off),
- Preparation of mark-ups for hazardous area classification details and drawings, cable tray and routing layouts, one line diagrams, grounding layouts to be implemented by a CAD designer.
- Preparation of Cable schedules, load lists, tie-in schedules and specifications.
- Preparation of Panel board and load schedules
- Conduction quality checks on documentation to ensure adherence to company's processes
- Participation and coordination of Health, Safety and Environment talks and looking out for potential hazards so as to correct them or report to the appropriate departments for further action.
- Performing any other engineering job that requires application of knowledge gained over 5years class work in a university.

Also, I do have a knowledge industry wide standards which include API, IEC, IEEE, DNV, e.t.c.
Proficiency in the use of AutoCAD design software, LUXICON lighting software, Microsoft Excel and a basic working knowledge of ETAP.

Associate Electrical Engineer at DeltaAfrik Engineering (A WorleyParsons & DeltaTek Company)
  • Nigeria
  • July 2008 to June 2011

I have over 5 years working experience in the design engineering environment covering Conceptual Designs, Front End Engineering Designs, Conceptual Designs working on projects for ExxonMobil, Chevron and Total. Some of these projects include: the Pigging Facilities Upgrade Phase 6 project (Mobil), the Escravos Diesel Storage Terminal project (Chevron), Yoho Gas pipelilne Brownfield verification phase 2 project (Mobil), Yoho YP Brownfield Upgrade project (Mobil), Ikike Field Development Project (Total), Okpohuru Phase 2 Design project (Seplat). Some of the activities carried out on these projects include but not limited to:

- Preparation of design calculation sheets e.g. cable sizing calculations, motor starting calculations, equipment sizing calculations, cathodic protection calculations, lighting calculations, equipment datasheets, project MTOs (Material Take-off),
- Preparation of mark-ups for hazardous area classification details and drawings, cable tray and routing layouts, one line diagrams, grounding layouts to be implemented by a CAD designer.
- Preparation of Cable schedules, load lists, tie-in schedules and specifications.
- Preparation of Panel board and load schedules
- Conduction quality checks on documentation to ensure adherence to company's processes
- Participation and coordination of Health, Safety and Environment talks and looking out for potential hazards so as to correct them or report to the appropriate departments for further action.
- Performing any other engineering job that requires application of knowledge gained over 5years class work in a university.

Also, I do have a knowledge industry wide standards which include API, IEC, IEEE, DNV, e.t.c.
Proficiency in the use of AutoCAD design software, LUXICON lighting software, Microsoft Excel and a basic working knowledge of ETAP.

Education

Bachelor's degree, Electrical/Electronics Engineering
  • at Federal University of Technology, Owerri
  • December 2006

I bagged a Bachelor's degress (Second Class Upper, Honours) in Electrical/Electronics Engineering from the Federal University of Technology in Owerri.

Specialties & Skills

Teamwork
Electrical Engineering
Electrical Maintenance
Project Collaboration
Microsoft Office
AutoCAD
Electrical Engineering Design
Microsoft Office Tools

Languages

English
Expert
French
Beginner

Memberships

IEEE
  • Graduate Membership
  • December 2004
Nigerian Society of Engineers (NSE)
  • Corporate Member
  • October 2012
Council for Regulation of Engineering in Nigeria (COREN)
  • Registered Electrical Engineer
  • July 2013

Training and Certifications

Certificate of Proficiency (Certificate)
Date Attended:
October 2011
Valid Until:
October 2011
Certificate of Proficiency (Certificate)
Date Attended:
February 2002
Valid Until:
June 2002
Certificate of Training (Certificate)
Date Attended:
March 2009
Valid Until:
March 2009

Hobbies

  • Reading, Board games, soccer, travelling