Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
TOMAN IBRAHIM, Testing and Commissioning Manager

TOMAN IBRAHIM

Testing and Commissioning Manager·Shaker Consultancy Group

Egypt

Master's degree,

Work experience

Total years of experience: 13 years, 4 months

Testing and Commissioning Manager

February 2013 - April 2014

Shaker Consultancy Group

Egypt

February 2013 - April 2014

Duration: (From: Feb.2013 To: April 2014)
Project: GIZA NORTH COMPINED CYCLE PROJECT
Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: Giza north combined cycle project 500 KV & 220 KV GIS (CP 104)
500 KV GIS, double bus bar, double breaker, 13 bays
220 KV GIS, double bus bar, single breaker, bus coupler, 9 bays
TIE transformers 500\220\11 KV, two transformers, each one 3 single phase transformer

Duties & Responsibilities: - Lead testing and commissioning team and schedule
-Testing and commissioning for: - GIS Equipment and LCC function test
- Control and Protection system
- DC and Batteries,

Company industry:
Business Consultancy Services
Job role:
Management

May 2012 - February 2013

TIE Transformer

May 2012 - February 2013

Faculty of engineering,
Major: (Electric Dept.)

-
Duration: (From: Feb.2013 To: April 2014)
Project: GIZA NORTH COMPINED CYCLE PROJECT

Job role:
Other

Testing and Commissioning\ Protection Engineer

October 2011 - January 2012

Universal Consulting Engineering

October 2011 - January 2012

Duration: (From: October 2011 to: marsh 2012)
Project: JAHLOUT Substation Project ( Oman)
Employer: Universal Consulting Engineering (UCE)
Position: Testing and Commissioning\ Protection Engineer

Project Description: 132\33 KV, Air Insulated Substation (AIS), Double Bus Bar with bus section and bus coupler, 12 bays, 10 feeders and 132\33 KV GIS substation, two 125 MVA Power Transformer with four OHL 33 KV & four cable feeders.

Duties & Responsibilities: -Review schematic drawing according to Oman Electric Company standard and requirement
-Prepare as built drawings for feeders and systems
-Supervise Testing and commissioning activities for the substation equipments and systems


Work experience (4): -

Company industry:
Business Consultancy Services
Job role:
Other

Assistant Project Manager

July 2007 - September 2011

Production Company

India

July 2007 - September 2011

Faculty of engineering,
Major: (Electric Dept.)

-
Duration: (From: Feb.2013 To: April 2014)
Project: GIZA NORTH COMPINED CYCLE PROJECT
Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: Giza north combined cycle project 500 KV & 220 KV GIS (CP 104)
500 KV GIS, double bus bar, double breaker, 13 bays
220 KV GIS, double bus bar, single breaker, bus coupler, 9 bays
TIE transformers 500\220\11 KV, two transformers, each one 3 single phase transformer

Duties & Responsibilities: - Lead testing and commissioning team and schedule
-Testing and commissioning for: - GIS Equipment and LCC function test
- Control and Protection system
- DC and Batteries,
- TIE Transformer
- Prepare as built drawings for systems

Work experience (2): -
Duration: (From: May 2012 to: Feb.2013)
Project: EL-MARG SUBSTATION PROJECT
Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: 66\11 KV, Gas Insulated Substation (GIS), Double Bus Bar with bus coupler, 11 bays, three 40 MVA Power Transformer, and MV SWGR (42 CELL)

Duties & Responsibilities: -Review schematic drawing
- lead testing and commissioning team and schedule
-Testing and commissioning activities for all the substation equipments and
systems (GIS, MV SWGR, DC and Batteries, Control and Protection systems and equipments)
-Prepare as built drawings for systems


Work experience (3): -
Duration: (From: October 2011 to: marsh 2012)
Project: JAHLOUT Substation Project ( Oman)
Employer: Universal Consulting Engineering (UCE)
Position: Testing and Commissioning\ Protection Engineer

Project Description: 132\33 KV, Air Insulated Substation (AIS), Double Bus Bar with bus section and bus coupler, 12 bays, 10 feeders and 132\33 KV GIS substation, two 125 MVA Power Transformer with four OHL 33 KV & four cable feeders.

Duties & Responsibilities: -Review schematic drawing according to Oman Electric Company standard and requirement
-Prepare as built drawings for feeders and systems
-Supervise Testing and commissioning activities for the substation equipments and systems


Work experience (4): -
Duration: (From: July 2007 to: September 2011)
Project: Cairo West, Units (7&8) (2*350 Mw) Project
Employer: Cairo electricity Production Company

Company industry:
Industrial Production
Job role:
Management

Panels and fault recorder commissioning

January 2006 - July 2007

Emergency Diesel Generator

January 2006 - July 2007

Job role:
Other

Maintenance engineer

April 2003 - December 2005

Wadi-Hof Gas Station

Egypt

April 2003 - December 2005

Duration: (From: APRIL 2003 to: Dec. 2005)
Project: Wadi-Hof Gas Station
Employer: Cairo electricity Production Company
Position: Maintenance engineer
Project Description: Wadi-Hof power station is consists of three units (Gas Turbine) with static starter. Each unit 11 KV, 33 MW connected with two power transformer, three winding transformer, and tow units for one transformer and the third unit with the second one. Connected through medium voltage switchgear.

Duties & Responsibilities: - Work as operating engineer for one year
- Work as maintenance engineer for one year and half. During this period overhaul Maintenance was done for tow units by Switzerland engineers (BBC
Company)
- Protection relays testing for transformers, switchgears, generators, 33 Mw, static starter, motors and transducers.


Work experience (7): -

Job role:
Maintenance, Repair, and Technician

Site Engineer

October 2000 - April 2003

different

Bahrain

October 2000 - April 2003

Duration: (From: October 2000 to April 2003)
Project: different
Employer: different
Position: Site Engineer.
Project Description: different: Duties & Responsibilities: -Review and draw the as built drawings for the electric distribution systems and follow up the work in the site
-Maintenance for the emergency diesel generators
-Manage the production process and make the calibration for electric watt-hour meters
-Maintenance for the vegetables production lines


Special Training courses: 1- Fire fighting course- MINISTRY OF DEFENCE- El-Waily Fire fighting center: 2- Safety training course - PGESCO. Company: 3- Training skills and Human Development Courses (El-Nahda Center): - Communication Skills: (Interactive, Motivation, Personality types, Influence, Cooperation and Persuasion methods)
- Team Work Leadership
- Time Management and Planning

Job role:
Civil Engineering

Faculty of engineering

-

Electric Dept

-

Faculty of engineering,
Major: (Electric Dept.)

-

Company industry:
Construction & Building
Job role:
Teaching and Academics

Testing and Commissioning Manager

-

Shaker Consultancy Group

Egypt

-

Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: Giza north combined cycle project 500 KV & 220 KV GIS (CP 104)
500 KV GIS, double bus bar, double breaker, 13 bays
220 KV GIS, double bus bar, single breaker, bus coupler, 9 bays
TIE transformers 500\220\11 KV, two transformers, each one 3 single phase transformer

Duties & Responsibilities: - Lead testing and commissioning team and schedule
-Testing and commissioning for: - GIS Equipment and LCC function test
- Control and Protection system
- DC and Batteries,
- TIE Transformer
- Prepare as built drawings for systems

Work experience (2): -
Duration: (From: May 2012 to: Feb.2013)
Project: EL-MARG SUBSTATION PROJECT
Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: 66\11 KV, Gas Insulated Substation (GIS), Double Bus Bar with bus coupler, 11 bays, three 40 MVA Power Transformer, and MV SWGR (42 CELL)

Duties & Responsibilities: -Review schematic drawing
- lead testing and commissioning team and schedule
-Testing and commissioning activities for all the substation equipments and
systems (GIS, MV SWGR, DC and Batteries, Control and Protection systems and equipments)
-Prepare as built drawings for systems


Work experience (3): -

Company industry:
Business Consultancy Services
Job role:
Management

Assistant Project Manager

-

HV and Partial Discharge

-

Position: Assistant Project Manager

Project Description: Cairo West Project is a new project for adding a new two units to the Existing units. A new two units are 350 MW each, 19 KV connected through step-up transformer (460 MVA, 19/500 KV) to the 500Kv grid, in addition to its auxiliaries (MV and LV switchgears and distribution panels)

Duties & Responsibilities: Engineering Phase (Tendering and Design);
* Tenders review for all electrical systems and equipments in the station (Generator and its auxiliaries, Power transformer, MV & LV switchgear and GIS)
* Offers technical evaluations for each contract
* Design Review for all electrical systems and equipments (submittals and drawings)
- Protection system design and setting review
- Generator and its auxiliaries
- Power Transformers and Iso-phase bus
- Gas Insulated Substation (GIS - 500 KV)
- MV& LV Switchgears
Construction Phase;
Site preparation, and equipments construction, assembly and inspections for: - Power Transformers (HYOSUNG)
- GIS (500 KV) (AREVA)
- Generator and its Auxiliaries (MITSUBISHI)
- MV switchgear and LV distribution panels (EGEMAC)
Start-up, Testing and Commissioning Phase;
Testing, Start up, and Commissioning, for: - Protection Relays setting review, Testing and commissioning for all electric equipment (Generator, GIS, Transformer, MV, and LV SWGR)
Protection relays Types (Beckwith M3425 & M3310, MICOM, VAMP, ABB, Siemens 7SJ600 and SEPAM)
- Power Transformers testing (Turns Ratio, Winding resistance, Tan delta and control panel and Interlock)
- MV Switchgear and LV distribution panels (HV, Meggar, Function and Interlock.)
- GIS 500 KV (HV and Partial Discharge, Function and Interlock local & remote

Job role:
Management

Maintenance Engineer

-

Production Company

India

-

Faculty of engineering,
Major: (Electric Dept.)

-
Duration: (From: Feb.2013 To: April 2014)
Project: GIZA NORTH COMPINED CYCLE PROJECT
Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: Giza north combined cycle project 500 KV & 220 KV GIS (CP 104)
500 KV GIS, double bus bar, double breaker, 13 bays
220 KV GIS, double bus bar, single breaker, bus coupler, 9 bays
TIE transformers 500\220\11 KV, two transformers, each one 3 single phase transformer

Duties & Responsibilities: - Lead testing and commissioning team and schedule
-Testing and commissioning for: - GIS Equipment and LCC function test
- Control and Protection system
- DC and Batteries,
- TIE Transformer
- Prepare as built drawings for systems

Work experience (2): -
Duration: (From: May 2012 to: Feb.2013)
Project: EL-MARG SUBSTATION PROJECT
Employer: Shaker Consultancy Group
Position: Testing and Commissioning Manager

Project Description: 66\11 KV, Gas Insulated Substation (GIS), Double Bus Bar with bus coupler, 11 bays, three 40 MVA Power Transformer, and MV SWGR (42 CELL)

Duties & Responsibilities: -Review schematic drawing
- lead testing and commissioning team and schedule
-Testing and commissioning activities for all the substation equipments and
systems (GIS, MV SWGR, DC and Batteries, Control and Protection systems and equipments)
-Prepare as built drawings for systems


Work experience (3): -
Duration: (From: October 2011 to: marsh 2012)
Project: JAHLOUT Substation Project ( Oman)
Employer: Universal Consulting Engineering (UCE)
Position: Testing and Commissioning\ Protection Engineer

Project Description: 132\33 KV, Air Insulated Substation (AIS), Double Bus Bar with bus section and bus coupler, 12 bays, 10 feeders and 132\33 KV GIS substation, two 125 MVA Power Transformer with four OHL 33 KV & four cable feeders.

Duties & Responsibilities: -Review schematic drawing according to Oman Electric Company standard and requirement
-Prepare as built drawings for feeders and systems
-Supervise Testing and commissioning activities for the substation equipments and systems


Work experience (4): -
Duration: (From: July 2007 to: September 2011)
Project: Cairo West, Units (7&8) (2*350 Mw) Project
Employer: Cairo electricity Production Company

Company industry:
Industrial Production
Job role:
Maintenance, Repair, and Technician

Assistant Project Manager

-

Cairo West Plant

-

Position: Assistant Project Manager

Project Description: Cairo West Project is a new project for adding a new two units to the Existing units. A new two units are 350 MW each, 19 KV connected through step-up transformer (460 MVA, 19/500 KV) to the 500Kv grid, in addition to its auxiliaries (MV and LV switchgears and distribution panels)

Duties & Responsibilities: Engineering Phase (Tendering and Design);
* Tenders review for all electrical systems and equipments in the station (Generator and its auxiliaries, Power transformer, MV & LV switchgear and GIS)
* Offers technical evaluations for each contract
* Design Review for all electrical systems and equipments (submittals and drawings)
- Protection system design and setting review
- Generator and its auxiliaries
- Power Transformers and Iso-phase bus
- Gas Insulated Substation (GIS - 500 KV)
- MV& LV Switchgears
Construction Phase;
Site preparation, and equipments construction, assembly and inspections for: - Power Transformers (HYOSUNG)
- GIS (500 KV) (AREVA)
- Generator and its Auxiliaries (MITSUBISHI)
- MV switchgear and LV distribution panels (EGEMAC)
Start-up, Testing and Commissioning Phase;
Testing, Start up, and Commissioning, for: - Protection Relays setting review, Testing and commissioning for all electric equipment (Generator, GIS, Transformer, MV, and LV SWGR)
Protection relays Types (Beckwith M3425 & M3310, MICOM, VAMP, ABB, Siemens 7SJ600 and SEPAM)
- Power Transformers testing (Turns Ratio, Winding resistance, Tan delta and control panel and Interlock)
- MV Switchgear and LV distribution panels (HV, Meggar, Function and Interlock.)
- GIS 500 KV (HV and Partial Discharge, Function and Interlock local & remote
Panels and fault recorder commissioning)
- Emergency Diesel Generator commissioning and start up protection & control

Work experience (5): -
Duration: (From: Jan 2006 to: July 2007)
Project: Cairo West Power Plant Units (5&6) (2*350 Mw)
Employer: Cairo electricity Production Company
Position: Maintenance Engineer
Project Description: Cairo West Plant is a steam power station consists of four old units (70 MW each) and two units 350 MW, 21 KV connected through step-up transformer (21/500 KV) to the 500Kv grid.
Duties & Responsibilities: - Protection relays testing and setting review
For the power transformers, GIS 500kv, Transmission lines and generators.
- Power Transformers maintenance and testing
- GIS 500 KV maintenance and testing.
- Work as a Training instructor.


Work experience (6): -

Job role:
Management

Education

January 2008

January 2008

Master's degree

Master degree (2008) Master subject: Protection of Synchronous Generator Using Multifunction Digital Relay

CAIRO UNIVERESITY

January 2000

January 2000

Master's degree, MS

Egypt

GPA (percentage): 74.13%

GPA (percentage): 74.13%

Bachelor degree-year Good (74.13%) - (2000) Senior project: Excellent Senior project title: (DRIVE). Design the control system for milling station using PLC and SCADA system Total experiences\ qualifications overall description:

Cairo University

High school or equivalent

University: Cairo University

Master's degree, engineering

* Graduation degree 2000 and master degree in electric science 2008 * Different type of experience (engineering, construction, testing and commissioning ) * Working and have good experience in Different type of stations (Gas and steam power station - GIS and AIS Substations) * Very good experience in protection system (relays) * Very good experience in schematic drawing design, review and modification * Tenders and contracts review * Design review for different electrical systems * Testing and commissioning for different electrical systems and equipments * Planning, time scheduling and team work qualifications * Very good relationship with the others friends, mangers and employers

Skills

CALIBRATION

Expert

ENGINEER

GAS TURBINE

Expert

GENERATORS

Intermediate

MAINTENANCE

MEDIUM VOLTAGE

Expert

TESTING

Expert

TRAINING

Expert

TRANSDUCERS

Expert

TURBINE

Expert