Total Years of Experience: 14 Years, 8 Months
March 2013
To Present
Electrical Engineer
at Taisei Vinaconex Joint Venture
Location :
Vietnam
March 2013 - Present
Taisei - Vinaconex Joint Venture (TVJV) is the Main Contractor at Noi Bai International Airport Terminal 2 Construction Project. I am working at MEP Section - Terminal Equipment Division, which handles equipment dedicated for Airport Terminal like Baggage Handling System, Airport Security System, Passenger Boarding Bridges, Airport Information System and Docking Guidance System. Since I joined TVJV, my responsibility is:
1. Engineering:
- Terminal Equipment Divison has 4 Sub-Contractors:
+ Vanderlande Industries: Provide Baggage Handling System
+ ShinMaywa Industries: Provide Passenger Boarding Bridges
+ Jalux Inc.: Provide Airport Security System
+ Arinc Incorporated: Provide Airport Information System and Docking Guidance System
I control Sub-Contractors’ submissions and fabrication progress.
- Check all submissions from Sub-Contractors such as material approval, shop drawing, method statement and make sure they are fully complied with Tender Specifications and Tender Drawings. Then submit them to Consultant to get approval.
- Issue Request for Information and Letter to Consultant and Owner.
- Coordinate with other Section (MEP and Building) in order to control Sub-Contractors working properly and finish on time.
- Check as built drawings from Sub-Contractor and hand-over systems to Owner.
2. Site work:
- Monitor and supervise Sub-Contractor working daily on site.
- Collect report from Sub-Contractor regarding progress, working coordination, safety and report to Section Manager.
- Notice to Sub-Contractor when they have any non-conformance issue on site. Make sure Sub-Contractors implement systems on site with good quality and safety.
- Arrange internal inspection with Sub-Contractors and inspection with Consultant until Consultant approves all items.
Besides, I also join other electrical works such as:
- Check Shop Drawings according to Project Specification and site conditions.
- Check Manufacturer and Material Approval document.
- Check Method Statement to implement and install system.
- Check Interface Control Document in order to get proper interoperation between all systems.
- Monitor the system installation works base on Overall Schedule, Sub-Contractors’ Schedule, Weekly Schedule and Monthly Schedule.
- Control quality of work.
- Coordinate with other teams (Building, Mechanical teams…) to avoid and resolve all unnecessary clashing.
- Testing and commissioning.
- Carry out inspection.
3. Defect Notification Period:
- Review the system maintenance schedules and monitor the Sub-Contractor’s maintenance activities on site.
- Coordinate between Airports Corporation of Viet Nam, Noi Bai Terminal Operation Centre, Project Management Unit Terminal 2, Japan Airport Consultant and Sub-Contractors to maintain systems running properly.
- Check, evaluate and propose method to resolve all the troubles happen during operation.
- Make monthly reports and distribute to all related parties.
Taisei - Vinaconex Joint Venture (TVJV) is the Main Contractor at Noi Bai International Airport Terminal 2 Construction Project. I am working at MEP Section - Terminal Equipment Division, which handles equipment dedicated for Airport Terminal like Baggage Handling System, Airport Security System, Passenger Boarding Bridges, Airport Information System and Docking Guidance System. Since I joined TVJV, my responsibility is:
1. Engineering:
- Terminal Equipment Divison has 4 Sub-Contractors:
+ Vanderlande Industries: Provide Baggage Handling System
+ ShinMaywa Industries: Provide Passenger Boarding Bridges
+ Jalux Inc.: Provide Airport Security System
+ Arinc Incorporated: Provide Airport Information System and Docking Guidance System
I control Sub-Contractors’ submissions and fabrication progress.
- Check all submissions from Sub-Contractors such as material approval, shop drawing, method statement and make sure they are fully complied with Tender Specifications and Tender Drawings. Then submit them to Consultant to get approval.
- Issue Request for Information and Letter to Consultant and Owner.
- Coordinate with other Section (MEP and Building) in order to control Sub-Contractors working properly and finish on time.
- Check as built drawings from Sub-Contractor and hand-over systems to Owner.
2. Site work:
- Monitor and supervise Sub-Contractor working daily on site.
- Collect report from Sub-Contractor regarding progress, working coordination, safety and report to Section Manager.
- Notice to Sub-Contractor when they have any non-conformance issue on site. Make sure Sub-Contractors implement systems on site with good quality and safety.
- Arrange internal inspection with Sub-Contractors and inspection with Consultant until Consultant approves all items.
Besides, I also join other electrical works such as:
- Check Shop Drawings according to Project Specification and site conditions.
- Check Manufacturer and Material Approval document.
- Check Method Statement to implement and install system.
- Check Interface Control Document in order to get proper interoperation between all systems.
- Monitor the system installation works base on Overall Schedule, Sub-Contractors’ Schedule, Weekly Schedule and Monthly Schedule.
- Control quality of work.
- Coordinate with other teams (Building, Mechanical teams…) to avoid and resolve all unnecessary clashing.
- Testing and commissioning.
- Carry out inspection.
3. Defect Notification Period:
- Review the system maintenance schedules and monitor the Sub-Contractor’s maintenance activities on site.
- Coordinate between Airports Corporation of Viet Nam, Noi Bai Terminal Operation Centre, Project Management Unit Terminal 2, Japan Airport Consultant and Sub-Contractors to maintain systems running properly.
- Check, evaluate and propose method to resolve all the troubles happen during operation.
- Make monthly reports and distribute to all related parties.
September 2010
To March 2013
Site Manager
at Niem Tin Co., Ltd
Location :
Vietnam
Niem Tin Co., Ltd (NTC, 6&8FL, 142 Doi Can, Ba Dinh, Ha Noi). I'm a member of Technical Implementation Department (TID), my responsibility is:
1. Engineering:
- Check Tender Specification and Tender Drawing and propose Building Management System (BMS) solution.
- Prepare shop drawings and equipment schedule used for BMS construction work.
- Coordinate with Purchasing Department to order and delivery equipment to construction site.
2. Site work:
- Do site survey and implement BMS installation, testing and commissioning.
- Setup control software, configure controller, design graphic and code automation control program.
- Meeting with Owner, Consultant and solve all requirements.
- Manage Site Engineers and workers during construction period.
- Collect report from Site Engineer, analyse and coordinate with other Contractors on site in order to implement BMS properly.
- Prepare weekly report to Directors and Managers about progress on site.
- Inspect material, installation work, system integration with Owner and Consultant.
- Training and Hand over system.
I joined some projects, such as:
September 2011 - 2013: Implement and T&C BMS for Indochina Plaza Hanoi Project (239 Xuan Thuy - Cau Giay - Hanoi): On-Site Manager.
April 2011 - September 2011: Implement and T&C BMS for VTV project: On-Site Engineer
November 2010 - April 2011: T&C BMS, CCTV System for Crowne Plaza Complex Project: On-Site Engineer.
September 2010 - November 2010: T&C BMS and CCTV system for Grand Hanoi Plaza Project: On-Site Engineer.
1. Engineering:
- Check Tender Specification and Tender Drawing and propose Building Management System (BMS) solution.
- Prepare shop drawings and equipment schedule used for BMS construction work.
- Coordinate with Purchasing Department to order and delivery equipment to construction site.
2. Site work:
- Do site survey and implement BMS installation, testing and commissioning.
- Setup control software, configure controller, design graphic and code automation control program.
- Meeting with Owner, Consultant and solve all requirements.
- Manage Site Engineers and workers during construction period.
- Collect report from Site Engineer, analyse and coordinate with other Contractors on site in order to implement BMS properly.
- Prepare weekly report to Directors and Managers about progress on site.
- Inspect material, installation work, system integration with Owner and Consultant.
- Training and Hand over system.
I joined some projects, such as:
September 2011 - 2013: Implement and T&C BMS for Indochina Plaza Hanoi Project (239 Xuan Thuy - Cau Giay - Hanoi): On-Site Manager.
April 2011 - September 2011: Implement and T&C BMS for VTV project: On-Site Engineer
November 2010 - April 2011: T&C BMS, CCTV System for Crowne Plaza Complex Project: On-Site Engineer.
September 2010 - November 2010: T&C BMS and CCTV system for Grand Hanoi Plaza Project: On-Site Engineer.
July 2009
To September 2010
Internet Service Core System Infrastructure Engineer
at FPT Telecom
Location :
Vietnam
FPT Telecom is an Internet Service Provider. My responsibility is:
1. Planning:
- Schedule development plan and maintenance plan for Internet Service Core System Infrastructure.
- Report to Managers and Directors about development progress.
2. Engineering:
- Assembly hardware, setup and configure core equipment for Internet Service Provider.
- Manage equipment storage used for Internet Infrastructure development and maintenance.
- Overcome, repair errors for Fibre Optical Transmission System Internet Distribution System.
3. Customer Care:
- Setup service for the new Internet Subscriber.
- Maintenance errors and support for subscribers.
1. Planning:
- Schedule development plan and maintenance plan for Internet Service Core System Infrastructure.
- Report to Managers and Directors about development progress.
2. Engineering:
- Assembly hardware, setup and configure core equipment for Internet Service Provider.
- Manage equipment storage used for Internet Infrastructure development and maintenance.
- Overcome, repair errors for Fibre Optical Transmission System Internet Distribution System.
3. Customer Care:
- Setup service for the new Internet Subscriber.
- Maintenance errors and support for subscribers.