  • My current job since July 2010

Cost Analysis & Estimation of Telco and Power Projects.
Responsible for the Initiating, planning, executing, monitoring and controlling 2G, 3G RAN & BSS, Swap, Rollout, re-location and expansion projects.
Responsible for execution of different phases of project i.e. Surveys, installation & commissioning, cutover and acceptances.
To achieve the project goals with respect to functions, time, and budget constraint.
Managing Telecom implementation Team of more than 100 employees (Project Coordinators, Engineers, Technicians & Riggers)
Implementation and negotiation service level agreements (SLA) with clients/vendors.
Develop, execute method of procedures (MOPs), & assigned tasks to project execution team.
Managing multivendor telecomm transmission, BSS network infrastructure based on RAN, Microwave, BTS, Optical Fiber, Router & Switches etc.
Conduct quality assurance using defined testing protocols on project deliverables.
Support, create and execute customer acceptance test procedures (ATP’s).
Analyze and approve changes to computing infrastructures.
Adhere to security and QHSE regulations and rules.
Meeting with telecom vendors and operators for Implementation of project.
Supervise Installation and commissioning of HUAWEI RTN 980/950/905 and HUAWEI BTS 3900/3900A.
Supervise Installation and commissioning of Ericsson RBS 6000 Family (6101, 6201, 6301, and 6102) BTS and Minilink (CN210, AMM2pB, AMM6pC, AMM20pB).
Supervise Installation and commissioning of 1+0, 1+1, XPIC 2+0 links of size (0.3m, 0.6m, 0.9m. 1.2m, 1.8m)

Asst. Project Leader at Mobiserve
  • Pakistan
  • January 2009 to June 2010

Manage and Supervised LOS surveys and Implementation of NEC and NSN MW Flexi Hopper (BB & Access Links) links all over the Pakistan with Telenor
ZTE solar systems installation /Commissioning/testing of solar equipment including Civil Work.
ZTE 40 sites BTS relocation AJK Project
ZTE 50 EVDO sites Project for Installation & Commission
Manage & Supervise 3 x HiT 7070 Surveying, I&C and ATPs
Manage 10 x Cisco Routers/Switches/Firewall Surveying, I & C and ATPs
Manage, I & C of MCPAs of PowerWave Equipment on 45 Cell sites in Pak.

Senior Telecom Engineer at Mobiserve Pakistan
  • Pakistan - Lahore
  • January 2008 to May 2008

SWAP sites from Nortel to Huawei BTS 3900/3900A Equipment.
Hand on experience on BTS 3900/3900A Equipment
Hand on experience on RTN 600 & RTN 900 Family (MW of Huawei)
Supervising Installation of HUAWEI BTS 3900, Andrew 7/8” feeder cables, internal and external feeder jumpers
Supervising the site surveys of NORTEL sites for swap installation of HUAWEI BTS3900.
Creating technical drawings after survey for swap and permanent installation.
Performing cutover activities and giving technical support to the teams on site.
Resolving technical issues like E1 patching, sector swap, distortion and call connectivity issues.
Power measurement of HUAWEI BTS using power sensor
Resolving issues related to VSWR using Bird site master.
Assisting the RF drive test teams in Optimization issues like call drops, sector swap, antenna tilt etc.
ATP on behalf of HUAWEI, verifying software, hardware and environmental alarms.
Operation & maintenance of Tellabs DXX 8100 series and Basic nodes (Basic-16/Basic-3)
Installation and Configure the Workstation, DXX server and Sybase Database of Tellabs 8100 NMS.

Telecom Engineer at Mobiserve Pakistan
  • Pakistan
  • January 2006 to December 2007

Deployment of PMCL (Mobilink) - WIMAX (DRAGONWAVE) network in Pakistan in north, central region.
Performing assignments pertaining to implementation of transmission planning
Integration, commissioning, troubleshooting and testing of DRAGONWAVE IP radio backhaul solution for Mobilink WIMAX network
Conduct transmission equipment acceptance testing and site integration in coordination with vendors’ and O&M teams
Coordination of SITE SURVEYS and Profile studies for WIMAX and GSM sites
Installation and Commissioning of DRAGONWAVE Microwave links which included 1+0, SPACE DIVERSITY and DPRM (Dual Polarity radio mount) links.
Configuration of TELCO switches
Troubleshooting issues related to media clearance, Link alignments, RSL fading, ODU/IDU troubleshooting and rectifier troubleshooting, traffic shifting and alarm testing
Documentation: Preparing of ATP (Acceptance Test Performa) forms and performing PAT/FAT with vendors and operators
Supervise and implementation of IBS sites including Cabling, Antennas, and Splitters.
Installation & Commissioning of DiTech QVP Shelves and cards for Voice Quality

Network Engineer at MultiTech Systems
  • Pakistan
  • December 2004 to December 2005

Maintenance and up-gradation of network equipment
Expansion of Tellabs DXX in PTCL at Central region.
Paktel Drive Test Project in Central Region by using TEMS Investigation 6.1 & Map Info.
Make Log files and prepare the report in Map Info.
Installation & configuration of (HDSL) equipment of Tellabs.
Desktop Research for PAKSAT-1R with DETECON.
Responsible for smooth functioning of network
Configuration of ADSL Modems/Routers

Education

Master's degree, Total Quality Management
  • at Punjab University
  • August 2009
Bachelor's degree, Computer Sciences
  • at Superior University
  • March 2005

My CGPA is 2.9, I got the award of excellance from our university and i did internship in MultiTech Systems.

Specialties & Skills

Horizon
Integration
Installation
Commissioning
Expertise in working on Tellabs 8150 equipment
Exposure to Linux, Installation of Servers (Samba, Squid)
Expertise in working on Dragonwave (Horizon Compact) equipment.
Exposure to ADSL/HDSL, Routers/ Modems

Languages

English
Intermediate
Urdu
Expert

Training and Certifications

Project Management (Training)
Training Institute:
PMI Chapter Lahore
Date Attended:
March 2012
IAS implementation & commissioing tranining (Training)
Training Institute:
Tekelec Mulhouse France
Date Attended:
April 2008
VSAT Training on Memotech (Training)
Training Institute:
Telecom Egypt Cario
Date Attended:
February 2007