عثمان  Ghauri, Implementation Manager

عثمان Ghauri

Implementation Manager

ACES

البلد
المملكة العربية السعودية - الرياض
التعليم
دبلوم, Diploma of Associate Engineering – DAE-Telecommunications
الخبرات
21 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 5 أشهر

Implementation Manager في ACES
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ فبراير 2024

OSP infrastructure for NEOM Project

TECHNICAL PROJECT MANAGER في Prime gate
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2018 إلى فبراير 2024

Supervise and enhance OSP assets for peak performance and unwavering reliability. Spearhead and complete complex OSP projects within time and budgetary constraints. Establish and uphold OSP standards and best practices, guaranteeing adherence to industry regulations. Collaborate with diverse teams, such as network engineers, project managers, and contractorsto ensure flawless OSP operations. Inspect and audit sites for assuring the excellence and safety of OSP installations. Cultivate robust vendor relationships, negotiating contracts to slash costs and secure a consistent supply of materials.
• Managed the complete lifecycle of outside plant projects, including planning, design, construction, and maintenance.
• Championed the creation of cutting-edge OSP design standards, maximising network reliability and scalability.
• Recognised for utilising GIS tools for OSP mapping and tracking, elevating project accuracy and speed to new levels.
• Led site surveys to assess optimal OSP configurations, leading to reduced latency and improved network performance.
• Installed network monitoring systems for instant performance analysis and swift issue resolution.
• Major Projects: FTTM, FTTH, MSAN, Key Account, and Relocation.

Technical Project Manager في Stc Solutions
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2013 إلى سبتمبر 2018

• Engaged in planning and prioritising optimisation processes in consultation with respective segments, striving for maximum throughput/efficiency and minimal costs. Compiled reports from various departments for the creation of a comprehensive report to present to C-level Management. Championed the project to garner support and commitment from executives. Offered the project plan and guidance to accurately discern the current and future relevance and value of the project.
● Directed a team of 6 PMs, 50+ engineers, supervisors, and technicians, and 20+ contractors to deliver projects on schedule.
● Strategized and executed the planning and rollout of more than 1K Km OFC for the FTTH network.
● Received recognition for strategically overseeing end-to-end project activities, including project planning, scheduling, monitoring, and controlling for fiber rollout, feasibility survey, and FTTH connectivity.
● Built and guided the project teams, defined project scopes, monitored contract administration, managed construction drivers, and handled sales and purchase orders to meet desired outcomes.
● Provided consultancy and supervision for OFC network planning, aligning with STC requirements while collaborating with vendors and the project team to closely monitor FTTH and Feeder roll-out.
● Major Projects: FTTx, MSAN, Key Account, Post Step, NBB Vision 2020, and Held Order.

Senior Network Design Engineer في OTC (Operation & Technology)
  • المملكة العربية السعودية - الرياض
  • فبراير 2013 إلى أكتوبر 2013

• Creating, Updating and Modifying the Network Engineer (Telcordia GIS)
• Data including Structures, Transmedia, Spans, Equipments.MH etc...
• Working with Floor Plans, Fiber Optical Cable and civil design in Network Engineer (Telcordia GIS)
• Working on asbuilt diagrams related FTTx Fiber, FTTx Civil
• Joint Survey to make sure about the connectivity & Cable Rout
• Coordination with all distrcirt to improve the work quilty

SITE ENGINEER في Silver Star General Contracting
  • المملكة العربية السعودية - الخرج
  • يناير 2011 إلى يناير 2012

Obtained field data related to fiber networks to facilitate the application of (MDT). Enforced a thorough verification process covering the entire fiber network for MDT implementation. Executed the fulfilment of STC Work Orders in strict adherence to STC OSP specifications. Created detailed and accurate flimsy and red-line diagrams for submission to STC. Ensured VDSL fiber laying and connectivity met and exceeded STC standards for optimal performance.
• Designed and implemented Fiber Connectivity strategies catering to FTTP, FTTN, FTTH, and FTTM architectures.
• Implemented MSAN installations, following the precise guidelines outlined in Huawei and Lucent specifications.
• Played a pivotal role in FTTH Project OSP, particularly in the realm of Fiber Distribution.

SUPERVISOR/INSPECTOR /TEAM LEADER في Detecon Al Saudia Co. Ltd.
  • المملكة العربية السعودية - الرياض
  • يناير 2007 إلى يناير 2011

Spearheaded and completed complex projects from initiation to completion within time, budget, and scope constraints.
Key Projects: Supervisor/Inspector - Mobily Project for ISP &OSP:
• Provided oversight and monitoring of cable works, including installation, termination, splicing, testing, and documentation while adhering to OSP specifications for Long Distance, Metro, and FTTB projects.
• Supervised the Preliminary Acceptance Test (PAT) process for OSP infrastructure projects, complying with OSP standards for cable duct systems, sub-ducting, man/hand-hole construction, and fiber optic cable installation and termination.
• Offered guidance to third parties to ensure the smooth execution of civil work near FO cable routes. Work Permit Receiver and Site Supervisor - Saudi ARAMCO Project:
• Operated in alignment with Aramco rules and specifications for consistent compliance.
• Served as an OSP Inspector in Aramco, ensuring adherence to quality and standards.
• Maintained the highest quality standards as mandated by Aramco specifications.
• Conducted Cable Splicing testing and troubleshooting for mitigating potential issues.

Site Supervisor في World Call
  • باكستان - لاهور
  • مارس 2003 إلى سبتمبر 2007

 Installation of (HFC) Fiber Optics Network in Lahore City.
 Designing of (Star and Ring Topology) Fiber Optics Routes.
 Installation and Maintenance of WISI Fiber Nodes.
 Installation and Maintenance of WISI Fiber Optic Transmitters.
 Installation and Maintenance of SA (Scientific Atlanta) Fiber Nodes.
 Installation and Maintenance of SA (Scientific Atlanta) Fiber Optics Transmitters, like Prisma II.
 Installation of Optical Distribution frame (ODF) for HFC.
 Testing and Trouble shooting of Optical Fiber Cable.
 Splicing of Optical Fiber Cable

Supervisor في Seimens
  • باكستان - لاهور
  • يناير 2002 إلى فبراير 2003

 Installation of IDF /MDF in Lahore Allama Iqbal International Air Port.
 Installation of Siemens Exchange.
 Installation of CCTV Cameras.
 Installation of Optical Distribution frame (ODF)
 Splicing of Optical Fiber Cable inside the area of Air port
• Major Projects/ Achievements
 Allama IQbal International Airport (Lahore, Pakistan)

الخلفية التعليمية

دبلوم, Diploma of Associate Engineering – DAE-Telecommunications
  • في Pak Institute of Technical
  • فبراير 2002

Specialties & Skills

Fiber Optics
Optic Fiber Planning & Deployment
Optical Engineering
Optical Transmission
Network Engineer Tool
INSTALLATION
CONSTRUCTION
SWIFT (PROGRAMMING LANGUAGE)
OUTSIDE PLANT
NETWORK MONITORING
RELIABILITY
MAPPING
MICROSOFT EXCEL
PERFORMANCE ANALYSIS
PLANNING
Optical Fiber Cable
micro station
auto cad
MS Office
PDF Editor
Teamwork

اللغات

العربية
متوسط
الانجليزية
متوسط
الأوردو
متمرّس

التدريب و الشهادات

FOC (الشهادة)
تاريخ الدورة:
June 2006

الهوايات

  • reading
  • searching and learning