Vasile Alexandru, Maintenance Electrical Engineer

Vasile Alexandru

Maintenance Electrical Engineer

Dietsmann (for BP Iraq)

Location
Romania
Education
Bachelor's degree, Military Industrial Engineering
Experience
29 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 6 Months

Maintenance Electrical Engineer at Dietsmann (for BP Iraq)
  • Iraq - Basra
  • April 2015 to March 2016

Main Responsibilities:
-PM job plans for electrical equipment: brush type synchronous motors 6.6kV 4MW, 6.6kV air
insulated switchgear ABB with SF6 breakers and vacuum contactors, 6.6kV MCSet switchgear Merlin Gerin, Sepam 2000 and ABB REF 543 protection relay, ONAF power transformers, synchronous motors excitation systems with AVR DECS 300 Basler Electric and Allen Bradley MicroLogix 1500 PLC.
-Technical support and assistance to electrical operation
-Planning support
-Troubleshooting, RCA, failure reports
-Spare parts ordering
-Work packages and small projects

Achievements:
-PM plan creation and implementation for water injection stations and water treatment plant
-Water injection stations equipment availability enhancing from 60 to 90 percent with minimal
expenses

Maintenance Electrical Engineer at Dietsmann (for ENI Gas)
  • Libya
  • January 2014 to February 2015

-Main Responsibilities:
-Electrical Troubleshooting, RCA, electrical condition monitoring (vibration, thermography, partial discharge, motor’s rotor shaft voltage), Work Packages, Spare Parts Ordering and acceptance upon delivery, Job Tasks List for Preventive & Corrective Maintenance on Electrical Equipment: Power generation and distribution, Field electrical equipment
-Maximo CMMS
-Management of Change
-Electrical Operation support

Achievements:
-New electrical trace heating (design, material ordering, installation, testing) for
regeneration gas compressors surge drums drainage system
-Creation and implementation of greasing schedule based on running hours for electrical motors
-PM plan creation and implementation for photovoltaic systems of a 600km oil pipeline

Maintenance Electrical Supervisor at Agip KCO
  • Kazakhstan
  • October 2010 to December 2013

Main Responsibilities:
- Electrical Commissioning Engineering support for Plant Utilities Area (3 steam boilers 400t/h, Air Compression and Nitrogen Plant, Water Treatment, Fire Water pumping facilities - Chemical Storage facilities, Fuel Gas Unit - hazardous area hydrocarbons, Diesel Fuel Storage facilities, Stripper and Oily Water Plant, Waste Water Treatment - hazardous area H2S, Technical Water and Condensate Storage facilities, Mechanical Workshop, E&I Workshop, Central Control Room Building, Chemical Laboratory, Electrical Substation, SIS)
- Supervision of maintenance activity on electrical equipment
- Electrical Spare Parts ordering, inspection and acceptance upon Spare Parts delivery to
warehouse, Spare Parts list definition and SAP implementation
- Ensuring timely and safely execution of Preventive, Corrective and Condition Based Maintenance Work Orders, as per Company work procedures and policy (Safety Critical Elements, Inspection and Compliance, Operation Requests)
- Preventive and Corrective maintenance Work Orders releasing, closing out, hours and manpower confirmation, Fault Code Statistics records, measurement recording sheets and technical reports uploading into SAP PM
- Root-Cause Analysis and 5-Whys Reports
- Participating in bi-party punch list system walk down and producing of punch list items to be corrected prior to handover of facilities to Operation
- Management of Change, (PCN + Scope of Work + Method Statement preparation), working closely with Engineering Department and Technical Authority.

Achievements:
-Successful handover of Utility Plant on behalf of plant owner
-Smoothly start-up of Utility Plant
-Maintenance activity transfer from Commissioning team to Maintenance contractors

E&I and HVAC Supervisor (PMC) at Craddock (for ENI Oil)
  • Libya
  • October 2008 to September 2010

Main Responsibilities:
- Reviewing and monitoring of project electrical & HVAC engineering deliveries, vendors data and design changes
- Monitoring of contractors performance on Electrical, Instrumentation and HVAC equipment installation
- Witness for onsite acceptance tests of equipment
- Verifying the implementation of Permit to Work system, LOTO and other safety procedures
- Monitoring contractors'/vendors' pre-commissioning and commissioning activity to be done according to project documentation (procedures, manufacturers’ instruction, logic diagrams), and acceptance of work on behalf of ENI Oil
- Walkdown, punch list and punch list items closing out
- Technical support and advice to E&I construction/commissioning activities
- Ensuring that all relevant As-Built Drawings / Documents are marked up by Electrical commissioning team as defined in project As-Built Procedure
- Ensuring that contractors handed over the files of commissioned facilities to Project Management Team, including all documents, such as: Operation and Maintenance Manuals, Engineering Mechanical Catalogues, Vendors’ Manuals

Achievements:
-Installation, commissioning, start up and handover to Operations the new DCS, Technical building and new produced water reinjection plant on time and within budget

Maintenance Electrical Engineer at Dietsmann (for ENI gas)
  • Libya
  • July 2006 to October 2008

Main Responsibilities:
- Writing of Standard Preventive Maintenance Job Task Lists for electrical equipment according to equipment maintenance manuals, ENI maintenance policy and Oil & Gas industry standards (ATEX, IEC, IEEE, ANSI, NEMA, NEC)
- Elaboration of Failure Reports for damaged equipment and ordering of spare parts from
manufacturers and suppliers
- Work instruction preparation for corrective maintenance activity and technical support for
fault finding and restoration of running condition of faulty electrical equipment
- Preventive and Corrective Maintenance work orders’ management through Maximo
- E&I Warehouse (50, 000 items stored) Inventory and material data (material short description 40 characters length, purchase order text, part number of material checked in Warehouse and against manufacturers’ catalogues, coordination of spare parts available in Warehouse with equipment tag number) uploading into Maintenance Software - Maximo
- Inputs into main electronic inventory file.
- Electrical, instrumentation and mechanical engineering support for client’s inventory team.

Achievements:
-PM plan creation and implementation on all electrical equipment of the plant
-Electrical items inventory in Warehouse, short description (40 characters), long description (purchase order text according to manufacturers’ catalogues) and Maximo implementation

E&I Engineering Supervisor (PMC) at Techint (for Shell Nigeria)
  • Nigeria
  • February 2001 to June 2006

Main Responsibilities:
- Electrical and instrumentation engineering support for construction and commissioning
department
- Elaboration of Construction/Commissioning Technical Query (CTQ) and documentation for
Site Engineering Instruction (SEI) in compliance with Shell Design Engineering Practices,
Project Specifications and Manufacturers’- Vendors’ instructions
- Elaboration of Electrical and Instrumentation Circuit Folders - Ready For Start
Up, according to client (Shell Nigeria) requirements
- As-built marking-up of Project and Vendors/Manufacturers documentation

Achievements:
-Construction, Pre-commissioning, Commissioning and start-up of 4 LNG trains

Chief Engineer at Mecanex
  • Romania
  • December 1991 to February 2001

- Management of Mechanical and Electrical Workshops (manpower skills assessment,
elaboration of method statements for complex equipment repairing or refurbishment)
- AC & DC electrical Ex motors overhauling
- Installation, commissioning and start-up of Industrial security systems manufactured by DSC, Esser, Siemens, Sielte, for Companies operating within Oil & Gas sector

Instrument & Automation Technician at Brazi Petrochemical Complex - Cumene, Phenol-Acetone Plant
  • Romania
  • June 1983 to August 1988

- Installation, calibration, and maintenance of pneumatic (0.2 - 1) bar and electrical (4 - 20) mA
output signal transmitters: flow, pressure (absolute and gauge), temperature, and level transmitters - manufactured by Foxboro, Masoneilan; recording devices (with graph paper, recording pen and chart drive - manufactured by Taylor), PID regulator blocks pneumatic and electronic, control valves pneumatically actuated, pneumatic operated valves, positioners, I/P converters
- Instruments’ loop checking
- Implementation of control logic diagrams (start, stop, alarm and tripping thresholds, interlocks)
for compressors
- Precommissioning, Commissioning and Start-up of DCS - Honeywell TDC 2000

Education

Bachelor's degree, Military Industrial Engineering
  • at Technical Military Academy
  • July 1991
High school or equivalent, Electrical Engineering for Oil & Gas
  • at College of Petrochemistry
  • June 1983

Specialties & Skills

Electrical Maintenance
Switchgear
Electrical Engineering
Installation
Electrical Maintenance
Electrical PMC
Electrical Engineering (PMC and Maintenance)

Languages

English
Expert