production operator
ongc
Total years of experience :12 years, 4 Months
Production oPERATions, forbes bumiarmada offshore limited
(FPSO - ARMADA STERLING 1) \[D1 fields of
(P), gujarat state petroleum corporation (
, GMR Energy limited (220MW Barge Mounted CC power plant)
Aware of 5S system and responsible for Analysis of routine and non-routine samples of Water, Steam, Lube & transformer oil, gas turbine water wash samples, Calibration of laboratory instruments, maintenance of Fine and Bulk chemical inventory, preparation of daily & monthly performance reports, and operation and maintenance of Water treatment plant which includes raw water treatment, cyclone separators, ACTIFLO lamella clarifiers, Pressure sand filters Demineralization plant, Effluent Treatment, Brackish water RO, Ultrafiltration, Heat Recovery Steam Generation (HRSG system), Once Through Steam generation (OTSG) as well through PLC SCADA, DCS (Rockwell, & MAX DNA platforms).
in