Specialist
Adma Opco Das Island
مجموع سنوات الخبرة :22 years, 11 أشهر
as Lifting
Rigging Superintendant
Handling Total Turnaround Jobs with 120 Riggers and 25 Supervisors.
Preparing Lifting Plans and Rigging studies.
Controlling all the Logistic support for movement related to turn around.
Jobs included Removal of Tube bundle, Valves, Erection of pipes, Covers for the heavy
equipment.
HSE related to Engineering,
Procurement, Fabrication, Assembly and Testing.
* Assist in preparing HSE Risk Assessment.
* Ensure all Shell GTL and contractors lifting equipment is registered and inspected and
certified in line with the regulation.
* Complete all other tasks as requested by Management.
Details of
Gas industry. As Lifting Engineer Gathered Experience in critical and non-critical lifting
Plans, Drawings, lifting Procedures and Risk Assessment’s, Tandem lifting, Compliance
Verification, Safety Analysis, Frequent Inspection, Periodic Inspection, Load Testing,
Certification of Cranes and other Lifting equipment, Risk Based Inspection of Integrity
Management, Tool box Talks and Permit to Work System.
Functional Competencies:
Proficiency in preparing critical lift plans as per Regulations and Standard.
QP approved Lifting Supervisor from GL.
Preparation of Method statement, Lifting procedures, Risk Assessment’s, Drawings and
also review of lifting Plans from Contractors /Sub contractors.
Advice on Crane selection, Positioning and Configuration.
Possess Proficiency in British/API/ASME Standard for Inspection and Certification of
Lifting/Hoisting Equipment’s.
Familiar with LEEA”s code of Practice for the safe use of lifting equipment.
Proven Expertise in Developing, Updating and Maintaining Operating Procedures for
Lifting/Hoisting equipment Inspection, Crane Operator’s assessment etc. as per ASME
V/VIII/IX, ASME 30.5, US FED SPEC RRC 271, LEEA, ASTM E 709, API RP 9B, BS
My duties were associated with NGL Gas Operation plant located in
Mesaieed consisting 4 nos. of NGL plants and Gas Distribution Station as well as in Tank farm
and Terminal operations.
* Outlined rigging studies, method statement and risk evaluation. Formulated schedules
and erection schemes.
* To review and approve all lifting operations, lifting plans and risk assessments.
* Execute logistic movement of crane and heavy vehicle in compliance with
Workdescription
Dabholbesix India ToconductliftingactivityinMarineonshoreoperationwith300tcraneforunloadingandloadingofSpuds, barges, generatorforDabholpowerproject
QGPCQatar To carry out all the shut down Rigging activity with 400 t crane including exchanger pulling, cover installation, valve removal.
GPICBahrain For methanol project Erection activity involves installation of 90 m stack, conveyor gallery, Rafter erection and 64 m chute erection.
GPICBahrain For ammonia plant shutdown Rigging activity involves Reactor capsule removal and installation with 400 t cranes.
courses: ISO 7500 and Other International Standards. Examination and Certification of Loose Lifting Gears and manual Lifting Machines. Load test, Inspection, Static and Dynamic load test. Integrity Assurance of Pneumatic and Electric Hoists/Winches. Ability to use SAP software. Technical Qualification:HND in Plant operation Professional certification LEEA- Entry part 1Lifting equipment engineers association passed in April 2008 LEEA- part 2 Lifting gear general passed in April 2012 LEEA part 3 Lifting machines manual passed in September 2012 LEEA certified engineer professional membership no- 007712