wael Raslan, Project Manager

wael Raslan

Project Manager

Al BAYAN Holding Group

Location
Egypt - Alexandria
Education
Bachelor's degree, FINE ARTS - INTERIOR DESIGN
Experience
17 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 0 Months

Project Manager at Al BAYAN Holding Group
  • Saudi Arabia - Riyadh
  • January 2016 to August 2018

- Ensure project requirements are met on time and within budgets.
- Develop project plans as needed, using effective change controls and quality control measures.
- Develop a schedule for project completion that effectively allocates the resources to the activities.
- Perform risk management to minimize project risks.
- Use appropriate verification techniques to manage changes in project scope, schedule and costs.
- Direct all field personnel to achieve completion of the project on schedule, within budget, with quality workmanship that conforms to original plans and specifications thus ensuring to meet the client’s expectations.
- Determine and monitor the resources (time, money, equipment) required to complete a project.
- Create and maintain comprehensive project documentation.
- Coordinate with clients, subcontractors, vendors for the flawless execution of projects.
- Utilize advanced critical thinking and problem-solving techniques in order to mitigate risks.
- Provide support to the project engineering organization to develop and implement new plant equipment commissioning requirements and ensure a smooth transition from installation to operation.
- Ensure proper project handover of all required documents (O&M Manuals and spare parts lists), maintain training records, performance tests and warranty certificates.
- Main Projects Handled: Supply and Installation of Furniture, Signage & Appliances for the building projects along the North-South Railway Project Saudi Arabia. Saudi Arabia Railway (SAR) https://goo.gl/qbt5d8

Project Control Manager at Al BAYAN Holding Group
  • Saudi Arabia - Riyadh
  • January 2014 to December 2015

- Gathering data and prepare information required to develop the project management plan, keep constantly updated project information to report about performance progress.
- Documented and prepared the procedures project management plan in collaborated with the whole team.
- Prepared and implement project cost plan and project schedule plans.
- Monitored the budget and expenditure of the project and the change orders associated with it and recommend resource reallocation to the management when required.
- Gathering data and generate information for weekly progress reports.
- invoice preparation based upon progress and scope validation.
- Assisted and monitored effective cost control and budget management practices
- Coordinated and integrate outsources plan with actual project management plan.
- Developed cost estimating templates and standard work scope documents
- Develop and execute measurement systems to process, analyze and identify project performance.
- Monitoring project plan implementation, goals and milestones by following PMI
- methodologies.
- Determine schedule, estimation and work scope to execute and complete deliverables within budget and schedule.
- Develop cost trend estimates and new techniques to support project cost trend programs.
- Verify scope and estimate costs by using contract terms.
- Main Projects Handled: Al-Imam Muhammad Ibn Saud Islamic University.

Senior Interior Designer & Project Controller at SAAD TRADING CONTRACTING & FINANCIAL SERVICES
  • Saudi Arabia - Khobar
  • November 2008 to December 2013

- Extensive knowledge of materials and FF&E products, manufacturers and suppliers.
- Coordinate the preliminary and final drawings in accordance with basic design.
- Determine schedule, estimation and work scope to execute and complete deliverables within budget and schedule.
- Adapt and modify design and operational methods to meet a variety of situations.
- Organizing the site to deliver programs requirements on a daily basis.
- Coordinating sub-contractors to ensure efficiency of work and deliverables flow.
- Monitor the quality of work carried out ensuring high standards are achieved and solve any issues with sub-contractors / suppliers.
- Ensuring all programs, plans, method statements are up to date, understood and adhered to by all the necessary people.
- Solving design and technical issues on site in cooperation with design office and workshops.
- Main Projects Handled: Outpatient Hospital SAAD Specialist (multi-specialized clinics), Private palaces for the company owner, luxury spa and health club, Private Residential luxury compound, Recreation Center, MAADEN project and Royal Commission for JUBAL and YANBU royal authority.

Senior Interior Designer at The AYA GROUP OF COMPANIES
  • Uganda
  • May 2012 to November 2012

- Control, Prepare & Check shop Drawings
- Co-ordinate with the engineering and the estimation team to prepare detailed technical offers and submit for the client’s approval.
- Co-coordinating Day today Site Reports and Check Sub Contractors shop drawings and get Approval from Consultant.
- Site supervision of the project
- Main Project Handled: HILTON KAMPALA - UGANDA

Director of Technical Office and Assistant Chairman at Egyptian European Co. (EEC.)
  • Egypt - Alexandria
  • January 2007 to October 2008

- Prepare designs, calculations, sketches, diagrams, schematic and design development drawings, final working drawings and technical specifications.
- Make FF&E selections and prepare FF&E documentation.
- Develop furniture, finish, and color concepts.
- Discuss the client on different designs for furniture, methods of finishing, quality of fabric, the type of packaging, Freight companies and delivery time.
- Coordinate all aspects of submittals, review and approvals according to contract Requirements and when applicable report and advice on deviations from the same.
- Arranging exhibitions in Egypt and abroad in France, Italy and Germany.

Director of Technical Office at PACT BOND EGYPT
  • Egypt - Alexandria
  • April 2004 to December 2006

- Producing all Technical Office Work & time schedules& project studies.
- Finishing wood work & Interior design for HILTON GREEN PLAZA Alexandria, Egypt.
- Interior Design and Finishing for PHAROS UNIVERSTY Alexandria, Egypt.

Technical Office Engineer at BELLA CASA (ELSHEROK Co.)
  • Egypt - Alexandria
  • September 2001 to March 2004

- Prepares final working drawings, technical specifications.
- Involved in all stages of the design process from project concept, sourcing products, preparing samples boards and producing specifications, budgets and schedules.
- Prepare cutting lists, bills of quantities and schedules
- Coordinate the preliminary and final drawings in accordance with the basic design.
- Participate in the exhibitions arranged in Egypt and abroad.

Education

Bachelor's degree, FINE ARTS - INTERIOR DESIGN
  • at ALEXANDRIA UNIVERSITY
  • May 2001

This course promotes a dynamic and speculative approach to the design of interior spatial environments and values research that seeks to challenge traditional methodologies. It gives you the opportunity to pursue your particular issues of interest in interior design or specialist areas of three-dimensional design, through concise and focused studies. We cover a range of issues, both theoretical and practical. Design modules deal with contemporary issues in a variety of interior design typologies, including retail, exhibition, gallery, performance and speculative efforts broadly described as installation. Careful studies are made in the pursuit of a fresh approach to their design resolution, through analogous and figurative studies, as well as comparison using suitable contemporary exemplars. The thesis can be undertaken as a design project, a dissertation or a piece of research – effectively a hybrid, both a project and a written summary or theoretical proposition.

Specialties & Skills

Microsoft Office
AutoCAD
Adobe Photoshop
microsoft project
Negotiation
Behavior Management
Communication
Strategic Planning
Corrective and Preventive Action (CAPA)
Leadership

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Languages

Arabic
Expert
English
Expert

Memberships

Project Management Institute
  • ID:4743399
  • August 2017
International Association of Art
  • Fine Arts
  • July 2002

Training and Certifications

Noise emitted by machinery and equipment (ISO12001) (Certificate)
Date Attended:
June 2008
Strategic Environmental Management (ISO14001) (Certificate)
Date Attended:
March 2008
Certificate of Quality System (ISO9001) (Certificate)
Date Attended:
January 2008
ITALIAN FURNITURE DESIGN (Training)
Training Institute:
The Industrial Modernization Center (IMC)
Date Attended:
January 2007
Duration:
180 hours
Project Management Professional (PMP) (Certificate)
Date Attended:
December 2017
Valid Until:
December 2020
Master Microsoft Project 2016 (Training)
Training Institute:
Joseph Phillips
Date Attended:
July 2016
Duration:
35 hours