Civil & Structural Engineer (PMC)
PENSPEN INTERNATIONAL LTD, KUWAIT
مجموع سنوات الخبرة :17 years, 10 أشهر
Project Coordination and Review of EPC Civil Engineering Design documents and Drawings, 3D model reviews, site visit, review/resolve technical site issues, Red line Mark-up review, coordination between MEW and Contractor, involved in drafting technical letters and memo’s related to project issues, site supervision. Reviewing Vendor Pre-Qualification (PQ) Documents. Review Feasibility and FEED documents and ITB document for EPC for future projects, Costing & Estimation, overall conceptual layout for site roads, overall plot plans, review soil investigation and topographic survey report, design basis using Structural Software’s STAAD-PRO, MS OFFICE and AUTOCAD for drawings etc., analyzed with Dead load, Live load, Wind load, Seismic loads etc. using American and KOC (Kuwait Oil Company) Standards and project specifications. The project involves;
Metering Skid Foundations for Boilers and Gas Turbine area
Gas Scrubber Foundations for Boilers Fuel Gas Supply System
Gas Oil Drain Transfer Pump Foundation
Gas Filter Foundation for Boilers Fuel Gas Supply System
Gas Filter Coalescer Foundation for Boilers Fuel Gas Supply System
Pressure Reduction Skid Foundation for Boilers Fuel Gas Supply System.
Cold Vent Stack Foundations for Boilers & Gas Turbine Fuel Gas Supply System
Drain Vessel Pit for Boilers & Gas Turbine Area
Deluge Skid Foundation for Boilers area
Pipe Supports and Foundation
Pipe Bridges and Foundation
Concrete Trenches I Protection Slab
Monitor Room
Gas Chromatograph Foundation
Kiosk Covering Structure
Miscellaneous Foundations & Pits
Cross-over platforms and Foundations
Valve Pits
New Fence and Foundation
Extension of Control Room Building
Project 1: Engineering, Procurement, Construction, Pre-Commissioning and Assistance during Commissioning/ Start-up/ Performance Testing of Clean Fuels Project-Mina Abdulla EPC, PACKAGE#1
PMC: Amec Foster Wheeler Energy Ltd (Wood)
EPC: Petrofac International Ltd, Samsung Engineering Co. Ltd, CB&I Netherland B. V. Joint Venture
Project Coordination and Review of EPC Civil Engineering Design documents and Drawings, 3D model reviews, Technical Queries, Change Requests, resolving interface issues between various Contractors, progress update, space reservation request (SRR) coordination, coordination between Refinery, PMC and Contractor along with all disciplines, involved in drafting technical letters and memo’s related to project issues, site supervision. Reviewing Vendor Pre-Qualification (PQ) Documents. Review Feasibility and FEED documents and ITB document for EPC for future projects, Costing & Estimation, overall conceptual layout for site roads, overall plot plans, review soil investigation and topographic survey report, design basis along with Structural Software’s using STAAD-PRO, MS OFFICE and AUTOCAD for drawings etc., analyzed with Dead load, Live load, Wind load, Earth Quake loads etc. using SHELL DEP, American and KNPC (Kuwait National Petroleum Company) Standards and project specifications. The project involves;
U/G Facilities, Road grading layout and details, signage, Pavement parking lots and finishing, Composite sewer systems (AOC, DS, ODS), Cooling water line, Firewater system, pits, sumps, catch basins, manholes
Cable trenches, Culverts, Road crossing duct banks, Valve pits, platforms, Walkways, Ladders, Pipe support, pipe Racks, pipe bridge, Inter Refinery Transfer Pipe rack, sleepers
Static (Heat exchanger, Pressure Vessels) and dynamic foundation (pumps, Compressors), Technological structure foundation, Heater foundation, injection skids, storage water tank
Substations, Control Room Buildings, FAR Buildings, SIH buildings, Analyser House, Maintenance & Operation buildings
Retaining wall, Bund wall, Piling design and layout, Shoring piles
Pump Shelters with EOT crane
Fencing and Gates
Fabrication drawings
Base plate, Anchor bolt design, Connection design
Revamp units includes demolition, removal, relocation, installation and modification of equipments
Cable Ladder support, Miscellaneous electrical and instrumentation support
Fireproofing
Structural integrity check for Shuaiba Oil Piers
Please refer attached CV for more Project details...
Complete Detailed Civil Structural Analysis and Design in below Projects:
Project 1 : Expansion of Liquid Handling Facility at Wadi Latham
Client : Occidental of Oman INC
Sun Shed for recovered Oil Pumps.
Crude Oil & Transfer Water Pumps Shed.
Crude Oil & Transfer Water Pumps Shed at Wadi Latham Facility.
Pipe Racks, Valve Access Platforms, Pipe supports.
Project 2 : Mangalore-Hassan-Bangalore-Mysore LPG Pipeline Project.
Client : Hindustan Petroleum Corporation Ltd, Mumbai
Scope : Laying of Pipeline, 397 km long from Mangalore LPG Dispatch to Mysore receiving stations via intermediate stations Neriya, Hassan and Yediyuru for transportation of LPG.
Valve operating Platforms & Crossover.
Pipe & Valve Support Foundation.
Foundation of Skids & Pumps with RCC Pavement
Shelter for Skids
Cable trenches
Pipe Bridge
Control Room Building Design
Sub-Station Design
Project 3 : Construction of 132 / 33 kV Grid Substation at Amrat and Mabella-2 and Installation of required 132 / 33 kV OHL / UG Cables in Muscat Governorate
Client : Oman Electricity Transmission Company SAOC
132 / 33 kV Grid Substation at Amrat, includes design of Footing, Retaining wall, Columns, Beam, Slab with Water Proofing.
Project 4 : Expansion of Crude Oil Handling System at Safah Facility
Client : Occidental of Oman INC
Crude Oil & Transfer Water Pumps Shed at Safah Facility
Pipe Racks, Platform, Valve Pits, Pipe Bridge and Pipe supports
Road grading layouts, Pavement, U/G Facilities
Project 5 : EPC for Ras Issa Oil Terminal Project
Client : Safer E&P Operations Company (SAFER)
PMC : Mott MacDonald India PVT LTD
EPC : Chemie-Tech LLC-IOT-AEC
Engineering : SNC Lavalin Engineering India PVT LTD (SLEI)
Crude Oil & Transfer Water Pumps Shed at Safah Facility.
Pipe Racks, Platform, Valve Pits, Pipe Bridge and Pipe supports.
Substation Building
Control Building
Residential Building for staff
Pipe sleepers
Pipe Racks
Platform & Pits
Pipe Bridge
Steel supported RCC Watch Tower
Concrete Cable trenches, Firewater system, Cooling water system, Drainage system
Project 1 : Upgrade of Chemical Injection & Monitoring Capability at West Kuwait (WK) Facilities
Client : KOC (Kuwait Oil Company)
Detailed Engineering in Civil Structural Analysis and Design for extension of substation and Control building, Light poles, Siren Poles, UG Tanks, Temporary and Permanent Shelters, Steel structures and foundation for elevated Pressed Water Tank, Pipe Supports, Pipe Racks, Septic Tank, Culverts, Retaining wall, Block Foundation, Pressed Water Tank Foundation at ground level, pump foundation, ACCU foundation and different type of foundations (Raft, Isolated Footings, Combined Footings) for various structures, Base plate, Anchor bolt design, Connection design, Cable Duct bank, Staircase design, Access Platforms and Valve Pits manually along with Structural Softwares using STAAD-PRO, ETABS and SAFE.
Crude Corrosion & Gas Corrosion Inhibitor Shelter and foundation in GC-17
Bulk Storage Skid Shelter and foundation at GC-27 & GC-28
Corrosion Inhibitor & Gas Corrosion Inhibitor Skid Shelter and foundation at GC-27 & GC-28
Gas Inhibitor Skid Shelter and foundation at BS-170
Scale Inhibitor Skid Shelter and foundation at GC-27 & GC-28
New Day Tank Skid Shelter and foundation at GC-17
Pipe Supports and sleepers -16 different types in all the above GC’s
Corrosion Coupon & Corrosion Monitoring Pits & access Platforms
Extension of sub-station at GC-27, which includes design of footing, columns, beam, slab with water proofing for battery and UPS room connecting new building columns to existing columns.
Extension of Control Room building at GC-27 with retaining wall all round the building consisting of pipe sleeves for penetration of instrument cables inside the building used for new control panels supported on steel I-beams covered with chequered plate. The building is designed for new foundation, columns, beam, slab with water proofing.
Foundation for Air conditioning condensing units at GC-27
Foundation for Auto stroke pumps at BS-170, GC-17, GC-27 & GC-28
Modification of existing steel base frames for foundation of New Auto stroke pumps at BS-170, GC-17, GC-27 & GC-28.
Project 2 : First Potable Water Pipeline Network for West Kuwait (WK) Facilities
Client : KOC (Kuwait Oil Company)
Pump Shelter and foundation with grade slab with 2 monorail cranes at Abdulliyah Pump Station and South Tank Farm
Pump Foundations at South Tank Farm and Abdulliyah Pump Station.
Surge Arrestor Tank Shelter and foundation.
RCC foundation for Pressed Water Tanks resting on Ground at Gas Management office at GC-27 and Police station
Steel Structure and foundation for Elevated Pressed Water Tanks at MWIP(12m x 16m x 10m Ht.), Pressed Water Tanks supported on concrete beams at grade level for BS-170, and GC-17
Modification of existing concrete roof slab for foundation of pressed water tank upon Control room at GC-27 & GC-28, Maintenance Building at GC-27 & GC-28, Check Post near GC-17 and MWIP with stability check of existing building foundation.
Steel Pipe supports, pipe racks, RCC sleepers and access valve pit and platforms at all above GC’s
Light Poles 8m, 10m and 12 m high for all above GC’s.
Project 3 : Up-gradation of Obsolete Fire Detection, Alarm and Suppression System at KNPC Sites Including the Phase-Out of Halon System
Client : KNPC (Kuwait National Petroleum Company)
Design of Siren Poles 14 m height with foundation onshore on existing concrete deck slab and offshore on existing steel structure with local modifications.
Complete Detailed Civil Structural Analysis and Design in below Projects:
Experience in design of R.C.C Highrise Buildings (Residential and Commercial) upto 45 Floors including 3 Basement Floors with Retaining wall + 5 Podium + 18 Floor Commercial + Girder Floor + 22 Floor Residential with Structural Softwares using ETABS, SAFE and STAAD-PRO with manual checks, design of low rise buildings upto 15 floors, schools, shopping malls, hospitals. Projects involved;
Project 1 : August Kranti Building
Floor : 3 Basement + 5 Podium + 18 Commercial + Girder + 22 Residential floors
Location : Building no. 1, 2, 35, 6 & 9 Bearing C S No.4/519 To 8/519 & 10/519 at Papanas
Wadi, Nana Chowk, Malabar Hill Division, August Kranti Marg, Mumbai-400 007
Project 2 : Kalapataru Mall
Floor : Ground + 9 Floors & Ground + 4 Floors
Location : Shopping Mall & Multiplex on property bearing Plot No. f.p.25 & 31 at
Panchpakhadi, Thane
Project 3 : Office Building at kalian for K Raheja Corp
Floor : Ground + 10 Floors
Location : Office Building on property bearing C T S No.5435 of Village-Kole Kalyan at Kalina,
Santacruz (E), Mumbai
Project 4 : Remedia School at Haji ali
Floor : Ground + 07 Floors
Location : Children's Orthopedic Hospital at Haji ali, plot bearing C T S No.5/47, Plot No.10 at
Haji ali
Project 5 : Lodha Excelus
Floor : 2 Basement + Ground + 4 Floors
Location : C T S No.67, S No. 59 of Village Mulgaon, Andheri (E), Mumbai
Project 6 : Shrikant Studio
Floor : 2 Basement + Ground + 12 Floors
Location : C T S No.669A/1, 669A/2, 669A/3, of borla Village, Chembur
Project 7 : Mahendra City
Floor : Ground + 10 Floors
Location : Chennai
Project 8 : Infosys Hyderabad
Floor : Ground + 05 Floors
Location : Survey No.45, 48, 49, 50, 51 &54 at Pocharam Village, Ghatkesar
Mandal, R.R. District, Hyderabad
Project 9 : Infosys Mangalore
Floor : Ground + 07 Floors
Location : Mangalore
Project 10 : Infosys -SDB5
Floor : Ground + 04 Floors
Location : SDB-5 at Mysore
Project Site visits to check steel reinforcement, formwork, dimensions, shuttering, cover to reinforcement, alignments etc.
Worked as a Trainee Civil Design Engineer for 6 months in RCC High-rise Buildings of 7 to 25 floors.
Project 1 : Study on flexure Behavior of Steel Fibre Reinforced Self Compacted Concrete Beam using Fly Ash. Project 2 : Analysis and Design of G+10 Multistoried Concrete Structure using STAAD PRO. Project 3 : Performance of Multistoried Building Structures situated on curved slope Ground (Comparison of Behaviour of building in earthquake) using ETABS.
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.