WALID ABDEL WAGED MOHAMED, HEAD OF ROAD AND INFRASTRUCTURE

WALID ABDEL WAGED MOHAMED

HEAD OF ROAD AND INFRASTRUCTURE

PACE

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, civil Engineering
Experience
25 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 4 Months

HEAD OF ROAD AND INFRASTRUCTURE at PACE
  • Saudi Arabia - Riyadh
  • My current job since August 1999
Site Engineer at NAB
  • Australia
  • August 2002 to January 2002

CONTRACT Co. Construction of Faculty of Tourism and
Hotels, 6th
October University
* managing parts of construction projects
* overseeing building work
FORMAT 3B
Name/Firm: WALID ABDELWAGED MOHAMED/Pace
EMPLOYEES

Project
  • January 2001 to August 2001

To
gas stations, public parks, governmental
buildings, police stations, and etc.
The city is fully designed and planned to
accommodate all of its resident’s needs.
An Axial Service Center, at the city’s
center is centrally located in close
proximity to the neighbourhoods to
service their needs. It includes all the
commercial, educational, entertainment,
health and financial facilities, various
governmental buildings, offices and
public service buildings, in addition to
the Islamic Center, the city’s landmark.
The city is complete with an investment
residential area, an industrial area,
entertainment area, and various type
service buildings.
* Service roads: 25 m wide, and of 320
km length (including all infra-structure)
* 45 schools for all stages (Kindergarten,
Primary, Junior, Senior)
* 68 mosques (local, main, grand
mosque)
* 6 Medical clinics (public, private)
* 6 neighbourhood centers. (including;
markets, shops, shopping malls, public
libraries, social centers, gas outlets,
police station)
* Telephone Exchange Center, Post
office and Fire Station
* The Islamic Center: more than 100, 000
m2
*
* Surrounding the whole city is a green
built and Ring Road with a total length
of 25 km and a width of 100m.

  • January 1999 to January 2001
Planning at 3202 Prince Muhammad Bin
  • Saudi Arabia
  • to
project
  • United Arab Emirates
  • to

line 3 package 2
which will form part of the six-line mega
project that will run for a total length of
176Km across the city.
Line 3 runs from West (near the Jeddah
Expressway) to East (near the Khashm
El Aam National Guard Camp).
The line consists of:
25.8Km elevated section (viaducts) with
10 elevated stations (including the
iconic Western Station),
11 Km underground section with 8
underground stations (including the
iconic Downtown Station which serves
two lines),
4.8Km at-grade section with 4 shallow-
underground stations (including a
transfer station).
• Developing design strategies
• Managing projects
• Collaborating with team members
• Meeting customers.
• Delegating tasks
• Mentoring team members
• Attending meetings
• Conducting presentation.
• Evaluating performance.
 Review project documents to assure
that Department Managers and design
leads are informed and copied on all
design specifics and necessary project
related information (i.e. scope,
schedule, budget, specifications)..
Business unit estimating support. Work
with the design leads to assure the
integrity of project documents is
maintained. Communicate with design
lead engineers and project
management to insure changes in
scope are carried out. Cooperate with
engineers and design leads to insure
FORMAT 3B
Name/Firm: WALID ABDELWAGED MOHAMED/Pace
EMPLOYEES

Project at Beiru
  • to

To
verbally received information is
documented and distributed to the
appropriate design team members.
Implement a checking and inter&
discipline checking procedure on all
project deliverables. Technical audits
for accuracy and consistency of design
documents. Interface with project
management, discipline engineers and
other design coordinators to assure
consistency and quality of work.
Determine projects staff requirements
and assignments. Evaluating personnel
as required.
1th April
2011
1th
Januar
y 2015
Senior
Highway and
Utility
Engineer
Pace architecture
engineering +planning
|Nogra North Complex,
Block C, Hawalli,

Project
  • to

To
international standards and will be
standing for the next 100 years to
accommodate 50 years of future traffic
flow by providing a series of complex
bridges and elevated highways along
the length of the project and at
intersections. The upgrade will therefore
secure smoother and more efficient
traffic flow as well as providing easier
access to universities, hospitals and
other main government buildings along
Jamal Abdul Nasser Street. The Project
also includes the diversion and
upgrading of a number of utilities'
networks including electrical and
communications cabling, sewerage and
storm water drainage.
and works to ensure compliance with
specifications and giving immediate
notice to the Contractor in the event that
such materials and works fail to comply
with the specifications.
 Recommend Client of the rates for any
unscheduled items of work that may
arise.
 Certify work volume and process interim
and final payments of the Contractors.
 Establish efficient procedures for
verifying Contractor performance and
reporting progress and problems in a
timely manner, including quality control
reports, quantity survey records,
requests for variation or change orders,
requests for time extension, and
Contractor’s claims and invoices.
 Ensure project financial management
procedures are in place and are strictly
followed, specifically relating to
payments, financial accounting,
financial reporting and record keeping.
 Check “as built” drawing prepared by the
Contractors. Keep and record a
complete set of as built drawings in
paper and electronic formats for
archiving in the Employers repository.
FORMAT 3B
Name/Firm: WALID ABDELWAGED MOHAMED/Pace
EMPLOYEES

Project at infrastructure for Jaber Al Ahmed City
  • to

To
 Assist Client for provisional and final
hand over by the contractors.
 Prepare a project completion report.
23
Septem
ber 2007
1th
April
2011
Senior
Highway
design
Engineer and
Utility
coordinator
Pace architecture
engineering +planning
|Nogra North Complex,
Block C, Hawalli, Beirut
Street, Kuwait
Preparing Master plan, main roads, and

Project at Electrical works
  • United Arab Emirates
  • to

To
plots, with each apartment being at
least 400m² in area.
3. High density housing consisting of
investment apartment buildings
designed to a built-up area of 250%
with units areas within the range of
100 to 150m².
4. A mega-mall or an anchor shopping
district.
5. Services and investment districts.
 Trench excavation for 150mm dia. pipe
to 1000mm dia 67, 000m
 sleeves for future irrigation lines
2, 500m
 Sluice Valves Dia. 150mm to 1000mm
215nos.

Junior at ber
  • to
Engineer at Dar Al-Dowailah Engineering Consultants
  • to

Construction Managers
Sabah Al Ahmed City has a total area of
35, 000, 000 m2 in addition to a
surrounding green belt and a ring road
of 500 hectares. Sabah Al Ahmed City
has 5 residential neighbourhoods
(A, B, C, D, and E) with an area ranging
between 300-450 hectares each. The
city includes and is not limited to 9, 600
Housing plots (600 m2 each), public
buildings such as schools, mosques,
medical clinics, shopping malls,
markets, youth centers, sporting clubs,
* Prepare complete design for all
components. The scope also included
all road works, infrastructure works,
public buildings, service buildings,
residential villas prototypes, covering
the following scale:
* Main Roads: 50 to 100 m wide, and of
61 km length (including all
infrastructure)
* Major roads: 36 m wide, and of 92.7
km length (including all infra-structure)
FORMAT 3B
Name/Firm: WALID ABDELWAGED MOHAMED/Pace
EMPLOYEES

Project
  • to

To
October 6 University (O6U) is the first
private university in Egypt.
O6U is in the 6th of October City, 32 km
from downtown Cairo. The campus
consists of four education buildings, the
teaching hospital, and the hostel for
female students, while the central library
and male students hostel are 150
meters from the campus.
* undertaking surveys
* setting out sites and organising
facilities
* checking technical designs and
drawings to ensure that they are
followed correctly
* supervising contracted staff
* ensuring projects meet agreed
specifications, budgets or timescales
* liaising with clients, subcontractors and
other professional staff, especially
quantity surveyors and the overall
project manager
* providing technical advice and solving
problems on site
* preparing site reports and filling in other
paperwork
* liaising with quantity surveyors about
the ordering and negotiating the price
of materials
* ensuring that health and safety and
sustainability policies and legislation
are adhered to

Manager
  • to

Education

Bachelor's degree, civil Engineering
  • at Zagazig University
  • May 1999

Specialties & Skills

Stormwater Management
CABLING
CONCEPT DEVELOPMENT
BRIDGES
MANAGEMENT
AUTOCAD
BUDGETING
COMMUNICATION SKILLS

Languages

Arabic
Expert
English
Expert