Walid Zaroubi, Senior Construction Manager / SME – Offsite Fabrication & Modularization

Walid Zaroubi

Senior Construction Manager / SME – Offsite Fabrication & Modularization

Petrofac International

Location
United Arab Emirates
Education
Bachelor's degree, Mechanical Engineering
Experience
36 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :36 years, 1 Months

Senior Construction Manager / SME – Offsite Fabrication & Modularization at Petrofac International
  • United Arab Emirates - Sharjah
  • February 2015 to July 2020

Various roles including:

- SME - Offsite Fabrication & Modularization: Subject Matter Expert providing support to onshore / offshore projects in all matters of design and fabrication planning activities and subcontracting strategies during tendering and execution.
- Construction Manager (PMC): Project Management Consultancy (PMC) services for the Halfaya Contract Area (Halfaya) in southern Iraq. - Client: PetroChina International Iraq FZE

- Construction Manager: Rabab Harweel field development Project (RHIP) - Client: Petroleum Development Oman (PDO)
Delegated to and representing PDO as part of the construction team.
Main Contractor: Consolidated Contractors Co. (CCC)

- (Offshore Jacket) Fabrication Manager: Borwin3 Offshore Wind Project - Client: TenneT (National Electricity Transmission Systems Operator based in Netherlands). Responsible for the fabrication / construction of the Jacket build at Heerema Fabrication Group (HFG) in Vlissingen yard in Netherlands

- (Modular Construction) Fabrication Manager: UZ750 Offshore Oilfield Development Project EPC2 - Client: Zakum Development Company (ZADCO)
Managing through a team of 30 Petrofac personnel the fabrication and construction of 33 process modules at Larsen & Tubro Modular Fabrication Yard in Sohar, Oman.

PMC Construction Manager at ZADCO
  • United Arab Emirates - Abu Dhabi
  • December 2013 to December 2014

UZ750 Project EPC1 - Client: Zakum Development Company (ZADCO)

Responsible for the on-island construction works on 4 artificial islands.
Integrate team efforts to resolve engineering and construction engineering problems expeditiously to meet specified targets. Ensure all complicated modularized equipment installation plans and procedures are reviewed and closed on time by all disciplines and stakeholders. Ensure all systems are mechanically completed and seamlessly handed over to Commissioning / Operations.

Works involve Civil / Mechanical / Electrical / Instrumentation installation and commissioning work for EPC1 phase. EPC1 is the contract awarded to NPCC / Technip consortium for affecting Initial Production (IP) from the first number of drilled wells on the-islands.

Project Value: 800 million US$

Construction Manager / Deputy Project Director at CH2MHILL
  • United Arab Emirates - Abu Dhabi
  • October 2012 to December 2013

Shah Gas Development (SGD) Project - Client: Al Hosn Gas
Delegated to and representing Al Hosn Gas as part of the PMC team.
Responsible for all construction works and deputizing the PMC Project Manager.
Ensure all Contractor construction engineering deliverables and construction works are delivered and carried out as planned. Resolve all construction issues expeditiously. Ensure all works are carried out safely and to the requisite quality in full compliance with Company specifications.

Products Pipelines comprising a 127km 36" Gas Pipeline from Shah to Habshan, a 66km 16" NGL Pipeline and a 66km 16" Condensate Pipeline inclusive of:
• Six Gas Actuated Mainline Block Valve (MLBV) sites with solar power and Remote Instrument Enclosures.
• A common launcher station at the Shah gas plant complete with substation for electrical distribution inclusive of transformers, switchgear, AC/DC UPS and HVAC.
• Hot Tap of 36” on 42” Gas line and Hot Tap of 16” on 18” Condensate line at Asab Tie-in.
• Leak detection systems for pipelines

Construction Manager at CH2MHILL
  • United Arab Emirates - Abu Dhabi
  • May 2009 to October 2012

ASAB Full Field Development (FFD) Project - Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)
Delegated to and representing ADCO as part of the PMC team.
Reporting to the ADCO CM; responsible for all brownfield construction works being carried out by the EPC Contractor (Petrofac International Ltd.) The project scope include additional wells, flow lines, transfer lines, replacement and modification of existing facilities (Remote Degassing Stations) and building new surface facilities (Central Degassing Station).

Project value: 2.45 billion $US
Project completion: 4th Quarter 2012
Main EPC Contractor: Petrofac International Ltd.

Project Manager at Nesma & Partners Contracting Co. Ltd. AlKhobar - KSA
  • Saudi Arabia
  • February 2008 to March 2009

Overall Construction subcontractor to Samsung Engineering Co. Ltd.

Ras Tanura Refinery - Diesel Hydrotreater (DHT) Project. Client: Saudi Aramco
Comprising the construction of a Diesel Hydrotreater Facility (105, 000 BPD), Sulfur Recovery Unit Facility (200 TPD), Off-site flare stack and piping and various in-plant additions, modifications and tie-ins (120 million $US).
Preparation of the Project and Construction Execution Plans and Project Schedule. Manage, supervise and coach the Project Delivery Team in detailed engineering, procurement and construction. Evaluate and award subcontractors for the supply of services, bulk materials and equipment resources.

Construction Manager at Al Jaber Energy Services (AJES)
  • United Arab Emirates - Abu Dhabi
  • May 2005 to February 2008

July 2006 to February 2008
Common Sulphur Project (400 million $US), Ras Laffan, Qatar. Client: Qatar Gas II.
Joint Venture Partner: Washington Group International.
EPC of a 12, 000 TPD Molten Sulphur Collection and Handling Facility. Includes 42km of heat traced and insulated pipelines, granulators, stacker-reclaimer units, ship loaders etc.
Review and provide input to the PEP. Prepare the Construction Execution Plan and the Construction Schedule. Work closely with engineering manager to resolve construction engineering issues.

May 2005 to July 2006
Taweelah Gas Receiving Facilities - Abu Dhabi, UAE. Client: Dolphin Energy Limited
The project was awarded toTechnip (Abu Dhabi) & Al Jaber Energy Services Consortium and comprised the engineering, procurement and construction works for the onshore gas receiving facility at Taweelah for Dolphin Energy’s gas export pipeline from Qatar to the UAE. Includes:
• 10 Kilometer 48” extension pipeline from Facility to Gasco’ pipeline tie-in point and 750 m 36” off-take pipeline from Facility to existing Taweelah Gas Receipt Station.
• 48” Hot Tap on 48” gas pipeline at tie-in.
• 36” Hot Tap on 36” gas piping tie-in point at existing facility.
• Heaters (3x), Launchers / Receivers, Control Room Building.

Senior Construction Engineer at Weir Techna Middle East
  • United Arab Emirates - Dubai
  • June 2004 to May 2005

Weir Techna (Middle East), part of the Weir Group www.weir.co.uk is a multinational company engaged in the water treatment business.

Monitor and direct the construction of a Sulphate Removal Package (SRP) module of 800 ton Gross Weight, sized for 250K BWPD for the Buzzard Field development in the North Sea for Nexen Inc.

Senior Project Engineer at National Petroleum Construction Company (NPCC)
  • United Arab Emirates
  • March 2003 to May 2004

30% owned by Consolidated Contractors Co. (CCC), NPCC provides EPC and Offshore Installation services in the development of offshore and onshore oil, gas and petrochemical fields.

EPCI of offshore Jacket (BH-N09), Topside and related pipelines for Qatar Petroleum Co.

 Responsible for overall activities within the PMT to ensure engineering, procurement and construction project goals and relevant client specifications are met on the project.
 Ensure all engineering design is completed and material requisitions and orders are placed as planned and expedited.
 Monitor and coordinate fabrication and construction efforts to completion.

Projects Manager at Consolidated Contractors Comapny (CCC) / NSF Egypt
  • Egypt
  • July 2001 to February 2003

Seconded to National Steel Fabrication co. (NSF) www.nsfegypt.com. NSF is joint venture between CCC www.ccc.gr and ORASCOM Group www.orascom.com providing a complete range of steel fabrication services for customers in the oil and gas, petrochemical, cement, and construction industries. NSF is ISO 9002 certified and ASME certified for pressure vessels (U, U2).

JOB RESPONSIBILITIES:
§ Directed individual project / construction managers and reported to the General Manager.
§ Ensured project engineering activities were executed according to specification, within budget and contract scope of work and according to schedule.
§ Reviewed engineering and contractual documentation from the estimation stage through the end of project.
§ Scheduled and planned all projects and monitored construction progress and quality.
§ Oversaw project schedules, budgets and resources within allocated cost and time parameters.

KEY ACHIEVEMENTS:
Supervised the management of the following projects:
§ Structural steel fabrication and site installation of a piperack (1700 tons) for Burullus Gas Co. in Alexandria, Egypt for the Scarab / Saffron project. Contract awarded through the Bechtel - Intec consortium.
§ Design, fabrication and supply of 79 pressure vessels of various sizes and thickness to Snamprogetti for the Dukhan Gas lift Project in Qatar for Qatar Petroleum.
§ Fabrication and supply of (4200 tons - includes site construction) structural steel and platework for Amreya Cement factory in Egypt; (3, 000 tons) for Krupp Uhde’s Qafco-4 expansion project for Qatar Fertilizer Co.; (5500 tons) for Algeria Cement Company; (3200 tons - includes site construction) for the new Fayed military airbase under the auspices of the US Army Corps of Engineers; (1400 tons) for Qatar Petroleum on the Ras Laffan Common Cooling Water project.
§Fabrication and site erection of mechanical bridges for 12 clarifier tanks for the sewage treatment plant in Gabal al-Asfar, Cairo, for Degremont Co.

Operations Manager / Deputy GM, Oman Division at Maritime Industrial Services Co. Ltd. (MIS)
  • United Arab Emirates
  • May 1984 to June 2001

MIS is an EPC contracting company based in the United Arab Emirates. MIS provides engineering, procurement, fabrication, construction as well as drilling rigs / marine vessel repair and modification services to the Oil and Gas, petrochemical, power generation, marine and heavy industries in the Middle East.

January 2000 to June 2001 Operations Manager / Deputy GM, OMAN

JOB RESPONSIBILITIES:
§ Responsible for all management aspects of the division’s projects.
§ Managed and improved overall efficient performance of the fabrication facilities.
§ Defined and implemented operational procedures of the division.
§ Assisted in developing and implemented the marketing strategy of the division’s fabrication and other services.

KEY ACHIEVEMENTS:
§ Pursued and successfully secured several contracts in Oman for Weir Westgarth Co. (total value $3.4 million) for the supply of large diameter carbon steel, CuNi clad steel, S.S. and Duplex S.S. piping for the Ghubrah power plant in Oman.
§ Managed a pioneer project which included design, procurement and fabrication of a 10, 000 psi design pressure wellhead sand-catcher pressure vessel (four additional vessels subsequently ordered). Materials Cr-Mo steel.
§ Successfully secured additional orders of $1.65 million for high-pressure wellhead filter vessels.

Senior Project Manager at Maritime Industrial Services Co. Ltd. (MIS)
  • United Arab Emirates
  • May 1995 to January 2000

May 1995 - January 2000 Senior Project Manager, Sharjah

JOB RESPONSIBILITIES:

• Responsible to the Vice President of Projects and Engineering for management of various projects with an emphasis on specialized pressure vessels, marine works, Single Point Mooring systems and packaging of process skids.
• Managed detailed engineering, procurement, planning, cost control, fabrication and construction activities including claims and closeout.

KEY ACHIEVEMENTS:
Successfully managed the following projects:
• Construction of two (ABS Classed - A1 Gas Carrier) marine vessels for the transportation of Liquefied Ammonia Gas (LAG).
• Fabrication and structural steel conversion of a Marine Cargo Vessel of 1410 tons lightship weight into a four-legged jack-up support and accommodation rig of 4400 tons lightship weight. Client: Mansal Offshore W.L.L.
• Supply of a ready-built Gas Train for Petroleum Development Oman (PDO), which included a Hydrocarbon Dewpointing and H2S removal skid units. Client: Stork Engineers & Contractors.
• Supply of Pressure Vessels to Petrofac for Total Yemen; Gas Scrubbers to National Iranian Oil Company (NIOC); Deethanizer Vessels to Saudi Aramco, etc.
• The supply of various Chemical Injection Skids for McDermott, several vessels and process skids to Petrofac for Bangladesh Gas Fields Company, Desalters for Occidental of Oman etc.

Operations Engineer at Maritime Industrial Services (MIS)
  • United Arab Emirates
  • May 1993 to May 1995

1993 - 1995 Operations Engineer, Sharjah

JOB RESPONSIBILITIES:
§ Supervision of yard operations (600-800 workforce) and workshop production engineers (4-8).
§ Pressure vessel mechanical design review.
§ Cost estimation as well as project management of SPM buoys manufacture / overhaul.
§ Develop fabrication procedures / standards.
§ Scheduling, planning and work packages review and preparation for production.

KEY ACHIEVEMENTS:
§ Held the position of Project Manager on several projects including the offshore disassembly, modification, refurbishment, overhaul and offshore reinstatement of an SPM system for RAKGAS in Ras Al Khaimah. The project involved the retrieval of the buoy, subsea hoses and PLEM. The manufacture of new PLEM, procurement of subsea hoses, fenders and turntable equipment (including PDU bearings and seal rings).
§ Introduced twin arc submerged arc welding process, GMAW welding processes for S.S. and Aluminum and expanded on the FCAW process units extensively to improve welding productivity.

.Head QA-QC / Project Supervisor / Design Engineer at Maritime Industrial Services (MIS)
  • United Arab Emirates
  • May 1984 to May 1993

As Head of the QA/QC division, was responsible for all quality related matters, welding engineering and fabrication procedures. Additionally was responsible for the mechanical design of pressure vessels and supervision of related project activities, process skids, and client coordination as well as cost estimation of special projects, and technical troubleshooting.

KEY ACHIEVEMENTS:
 Held the lead role, directed and coordinated the acquisition by MIS of the ASME / National Board Certifications for the manufacture, repair, alteration, and stamping of pressure vessels and power piping (U, U2, PP and R) stamps.
 Supervised the manufacture and complete assembly, including third party certification by Lloyds Register of Shipping, of a SPM buoy for Crescent Petroleum Company.
 Supervised and coordinated works for several oilfield-related projects including support fabrication (PLEMs, gravity anchors for a 42” subsea pipeline) and services (Chain handling and linking, floating and subsea hose inspection, assembly, testing and launching) for SMIT TAK’s C.A.L.M. installations in Iran.
 Assigned as the project engineer during the construction and complete outfitting of an 80-man offshore living quarters module that included a helideck for Dubai Gas Co. (DUGAS).

Education

Bachelor's degree, Mechanical Engineering
  • at University of Texas at Arlington
  • May 1982
High school or equivalent,
  • at American Community School
  • May 1977

Specialties & Skills

Construction Management
Project Management
Fabrication
Multi-discipline projects management
Fabrication management
Effective interpersonal and verbal and written communication skills.
Conflict management and problem solving skills.
Sound technical and business knowledge.

Languages

Arabic
Expert
English
Expert
French
Intermediate