waseem nasir, production operator(wellsites ,gas compression,gas sweetening plant)

waseem nasir

production operator(wellsites ,gas compression,gas sweetening plant)

omv pakistan exploration gmbh

Location
Pakistan - Faisalabad
Education
Master's degree, petroleum technology
Experience
24 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :24 years, 7 Months

production operator(wellsites ,gas compression,gas sweetening plant) at omv pakistan exploration gmbh
  • Pakistan - Karachi
  • My current job since January 2012

The responsibilities include

• Supervise the operations of oil/gas and water production including opening, closing, adjusting wells, carrying out well flow test utilizing test separators, operating wellhead equipment, controlling quantities of water injected, to ensure that the oil & gas production quantities as required target, reports the results to production Incharge.
• Executes and Implements Permit to Work System on the Well head sites as per HSSE regulations
• Prepares procedures and coordinates with the CCR Supervisor in implementing production campaigns undertaken regular as pigging of pipelines, , pressure testing of well flow lines, corrosion monitoring on the surface facilities in well head sites and modifications for the existing systems .
• Issue hot, cold and entry work permits for all routine /planned maintenance works to be carried out on all process & wellhead sites. Supervises the preparation of production facilities for required maintenance, turn around, work over and rig less activities, certifies safe handover to and from rig less operations and Maintenance personnel and personally accepts the repaired facilities after completion of maintenance, rig less operations and work over
• Prepare the plant for maintenance as per the established procedures when required, accompanies the Instrument/Mechanical/Electrical Technicians to explain defects/defaults ensuring safe preparation of equipment for routine planned maintenance, and test production equipment to ensure smooth efficient operation
• Perform a variety of process engineering duties in the plant. Includes monitoring performance of plants and facilities, preparing daily performance summary and recommending corrective actions to deal with abnormalities.
.

process technician(gas sweetening plant,gas compression) at PETRONAS CARIGALI PKISTAN
  • Pakistan - Islamabad
  • September 2008 to December 2011

The responsibilities include

• Supervise the operations of oil/gas and water production including opening, closing, adjusting wells, carrying out well flow test utilizing test separators, operating wellhead equipment, controlling quantities of water injected, to ensure that the oil & gas production quantities as required target, reports the results to production Incharge.
• Executes and Implements Permit to Work System on the Well head sites as per HSSE regulations
• Prepares procedures and coordinates with the CCR Supervisor in implementing production campaigns undertaken regular as pigging of pipelines, , pressure testing of well flow lines, corrosion monitoring on the surface facilities in well head sites and modifications for the existing systems .
• Issue hot, cold and entry work permits for all routine /planned maintenance works to be carried out on all process & wellhead sites. Supervises the preparation of production facilities for required maintenance, turn around, work over and rig less activities, certifies safe handover to and from rig less operations and Maintenance personnel and personally accepts the repaired facilities after completion of maintenance, rig less operations and work over
• Prepare the plant for maintenance as per the established procedures when required, accompanies the Instrument/Mechanical/Electrical Technicians to explain defects/defaults ensuring safe preparation of equipment for routine planned maintenance, and test production equipment to ensure smooth efficient operation
• Perform a variety of process engineering duties in the plant. Includes monitoring performance of plants and facilities, preparing daily performance summary and recommending corrective actions to deal with abnormalities.
.

process plant operator (LPG,GAS PROCESSING) at pakistan petroleum limited
  • Pakistan - Rawalpindi
  • November 2006 to September 2008

PAKISTAN PETROLEUM LIMITED (PPL)
(Oct 2006 to Sep 2008)
ADHI Gas Field, distt Rawalpindi (PAKISTAN)
The responsibilities include
• Checks, operates, monitors and observes all activities/situations on LPG/NGL plant equipment within the defined area of duty.
• Logs and records all plant running parameters and reports back giving detailed information of any abnormalities and defects.
• Carries out operational preparation of equipment prior to release for maintenance and ensures proper implementation of Permit to Work instructions.
• Tours the Gas Treatment Plant (LPG & NGL), separation plant, monitor performance and ensure efficient operation according to prescribed conditions
• Records in a log sheet operating data production as: Flow rates, pressure temperature and levels… etc. of each module including separators, scrubbers, gas header ad risers. Reports to Production Supervisor abnormal readings recommending appropriate remedial action. Implements approved ones immediately
• Maintains a high standard of HSE and demonstration acceptable level of risk perception.

process plant operator(urea plant 2000 series infi90 bailey) at fauji fertilizers company bin qasim karachi
  • Pakistan - Karachi
  • October 1999 to October 2006

• The responsibilities include
• Operates including shutting-down/starting up the UREA 2000 series(STAMICARBON, Netherland), Mixed chemicals, prepares the plant for routine/planned maintenance and carries our fist line maintenance.
• DCS (bailey infi 90)urea 2000 series operation and monitoring.
• Operation of plant according to established procedures, including starting-up/shutting-down the plant and adjusting associate gauges to maintain the required levels, flow rates, pressure and temperature.
• Carries out safety inspections of equipment and site activities to ensure adherence to safety procedures
• CO2 compressor and high pressure ammonia feed pumps
• Ensures work sites are properly prepared for all activities under the Permit to Work System.

Education

Master's degree, petroleum technology
  • at university of karachi
  • November 2002

the course comprises *petroleum geology,drilling and workover,reservoir engineering, *production operation & testing,pipeline engineering, *hydrocarbon processing and refining, *petrochemical plant operation( ammonia, urea,gas sweetening) *Fundamentals of Petroleum Engineering, *Petroleum Geology & *Geophysical Exploration *Petroleum Production Engineering-I *Environment and Safety Management *Well Testing *Petroleum Economics *Petroleum Refinery Engineering

Bachelor's degree, physics math geography
  • at government college university
  • May 1997

Mechanics Waves, Oscillations and Optics 3 Frictional forces : microscopic basis of this force Conical pendulum: The rotor circular and the banked curve. Equations of motion Deriving kinetic equations x(t). v(t) using integrations. Constant and non-constant forces and special examples Time-dependent forces Obtain x(t). v(t) for this case using integration method. Effect of drag forces on motion Apply Newton's Laws to obtain v(t) for the case of motion with time dependent drag (viscous Thermodynamics and Kinetic theory of gases Physical & Human Geography ,The Earth and its Origin: Atmosphere:Lithosphere: Internal Structure of the Earth

Specialties & Skills

Workplace Safety
Hazard Analysis
Natural Gas
Onshore
oil gas
Interpersonal effectiveness
Computer/technical literacy
Leadership/management
Communication
Personal management
teamwork

Languages

English
Expert
Urdu
Native Speaker
Arabic
Beginner
Hindi
Beginner
Punjabi
Native Speaker

Training and Certifications

iso quality management systems (Training)
Training Institute:
quality concerns limited
Date Attended:
October 2001
Duration:
36 hours
PCSB ptw (confined space entry procedure& JHA (Training)
Training Institute:
PETRONAS CARIGALI SDN BHD malaysia
Date Attended:
August 2009
Duration:
30 hours
fire fighting and rescue (Training)
Training Institute:
CAA training institute
Date Attended:
April 2009
Duration:
48 hours
industrial safety technology (Training)
Training Institute:
university of karachi
Date Attended:
April 2000
Duration:
36 hours
management of change & HAZID (Training)
Training Institute:
PETRONAS CARIGALI sdn bhd malaysia
Date Attended:
July 2010
Duration:
30 hours
routine and advanced rock properties (Training)
Training Institute:
core labs pakistan
Date Attended:
March 2001
Duration:
24 hours

Hobbies

  • reading books
    travelling,religions,knowledge,cultures
  • family time
    to spend time with family,