Waseem Khan, Instrument  Engineer

Waseem Khan

Instrument Engineer

SADARA Chemical Company

Location
Saudi Arabia - Eastern Province
Education
Master's degree, Power Plant Engineering
Experience
27 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 8 Months

Instrument Engineer at SADARA Chemical Company
  • Saudi Arabia - Jubail
  • My current job since April 2014

Presently, working as I& (SME) at M&E (TSD, Specialty). Job responsibility involves;
Handling instrument related RFC/RFV.
Responsible to prepare instrument related deliverables for in house projects as per DOW GPM guidelines. Presently, handling EO/PO pipeline from SADARA to Value Park and Fluxoil pipeline from SATORP to SADARA.
Review/Prepare CDP & FEEP documents at different stages of Project as per GPM. (FEL1/FEL2/FEL3 deliverables)
Management of Change (MOC) studies at instrument end.
Walk downs for quality check as per SADARA program.
Ensure the compliance of DOW/ARAMCO standards during the project phase.
Got training as SIS Coach.
Participate in RCA & HAZOP studies.
Review of engineering documents during detail engineering of project phase.

Instrument Engineer at SAFCO - SABIC
  • Saudi Arabia - Jubail
  • January 2008 to March 2014

• Responsible for various aspects of Minor/ major projects right from Technical study, Conceptual design to detailing & completion through EPC or In-House Maintenance WO.
• To review & provide the solution for Revamping /up gradation of obsolete control system & modification in Plant thro’ Management of Change (MOC) studies.
• Provide technical support to maintenance department to investigate the problem & suggest counter-measures to avoid recurrence.
• Review the complete Technical package for MOC. Includes conceptual schematic diagram for control change Philosophies, modification in P&ID & Interlocks, Instrument Datasheets for procurement, Instrument Loop Diagrams, ESD and Control Systems Logic Modifications.
• Basic Engineering: P&ID review, Control System Specifications, Safety Instrumentation System Specification, Cause & Effect Drawings.
• Detail Engineering: Instrument specifications and datasheets, control valve and flow element sizing, Instrument Layout and Cable Routing, Hookup and Installation Drawings, Logic Drawings, Loop Drawings, Termination Drawings, Control room Layout and Arrangement Drawings, Panel Specifications and Arrangement Drawings, Instrument Power Distribution Network and UPS Drawings.
• Provide services and support for pre-Commissioning/Commissioning and startup.
• Member of SABIC total reliability program (STRP) team, to assess & validate the required SIL level of various instrumented control system using Meridium software
• Review of CDP & FEEP documents at different stages.
• Review of design package for execution of Instrument related projects.
• Raised/Review punch list during project execution, T/A and short shutdown.
• Participate in PHA & PSSR for modification as per MOC.
• Participate in RCA & HAZOP studies.
• Follow up all critical issues that need to be taken during Studies/projects executions.
• During T/A, Coordinate with planning on the control system T/A related studies

Project Manager at Access Automation
  • Pakistan - Karachi
  • September 2006 to September 2007

• Kick-off meetings with client and Management to ensure the client requirements, Status
 updates & schedule for smooth execution of project.
 To ensure the setup of Engineering software “INTOOLS” for instruments profiles, Instrument index, Specifications / Datasheets, Instrument loop & Wiring diagrams, I/O list for DCS and PLC and Instrument sizing calculations.
 Review of Specifications & Sizing Calculation for valves and Datasheets for various instruments.
 Review Technical and the Commercial Quotations
 Review & Prepare control Logic scheme for client approval
 P&ID review for Control loops philosophy and Instrumentation Control system.
 To insure the implementation of NPIC (Notifications for P&ID change) in design documents.
• Coordination/Correspondence with Client & Sub-Vendors for Technical Clarifications
• Ensure the pre-commissioning & commissioning of project.
• Installation & commissioning of KOYO PLC on unit# 1 diesel generator of KESC at BQPS.
• Replaced & commissioned
 Complete relay based control systems with FATEK PLC of Balochistan Laminates.
 Complete Relay based control system of IA compressor with SIEMENS PLC.
 Relay based control panel with PLC control of plywood sheet preparation system.
 Mitsubishi F1 series PLC with New FX1N series on unit# 2 diesel generator of KESC.
 Old Telemecanique PLC with Siemens S7-200 PLC on controlling turbine hydraulic control system of KESC at BQPS.
 Old telemecanique PLC with Siemens S7-200 PLC of injection filling machine in B&H pharmaceutical company.
• Installation & commissioning of
 Pakistan first Sea Water RO Desalination at GPA Gawader with M/s IEC (Pvt) Ltd.
 Mitsubishi PLC with HMI on Deep Bed Filter at Sindh Abadgar Sugar Mill.
 FATEK & OMRON PLC’s on various elevator control application.
 PLC based SCADA systems on different capacity of RO desalination plants

Instrument Engineer at KANUPP Power Plant
  • Pakistan - Karachi
  • August 1998 to September 2006

• Provides support for instrument engineering activities throughout the plant.
• Develops and manages plant instrumentation projects including scope definition, economic analysis, engineering design, field execution, project startup (per-commissioning & commissioning), and documentations (Data Sheets, ILD, Interlock Scheme, P&ID etc).
• Planning and execution of Turnaround instrument activities.
• Leads root cause failure investigations for instrument equipment related incidents.
• Reviews engineering projects and improvements to ensure compliance with plant standards and good engineering practice.
• Support of plant Operations and Optimization engineers in identifying strategic instrumentation and control opportunities that have high potential to improve operating efficiency and availability or to reduce maintenance costs.
• Development of safety protective process logic system requirements and logic implementation.
• Responsible to Supervise & execute the Management of Change on any plant safety & safety related systems
• Keep the entire instrument and Control Loops of the plant in satisfactory and smooth running state by preventive and corrective maintenance.
• Evaluate requirement of spare parts for smooth running of instruments and initiate indent as per instrument specification.
• Supervised calibration of process Instrumentation of Electronic and Pneumatic transmitters, gauges, indicator, recorders of various vendors like
• Having hands on experience on ladder logic of following PLC software’s,
• Allen Bradley (RS Logix 500, RS View 32 )
• SEIMENS (STEP 5, STEP 7, LogoSoft)
• MITSUBISHI (GPPW) • OMRON (SYSWIN)
• GE Fanuc (Logic Master)
• Automation Direct/KOYO

Operation Engineer at KANUPP Power Plant
  • Pakistan - Karachi
  • June 1996 to August 1998

• Prepared & executed Isolation and De-isolation of Equipments or Systems (Process or Electrical side) before and after maintenance.
• Supervised and performed routine and comprehensive Tests on Major Plant control and protective Systems and Equipment’s.
• Turbine Rolling and synchronizing the Turbo Generator.
• Performed duties as a Shutdown coordinator in S/D status of plant.

Education

Master's degree, Power Plant Engineering
  • at NED University of Engineering & Technology
  • May 1996
Bachelor's degree, Electronics
  • at NED University Karachi
  • December 1993

Specialties & Skills

Ms Visio
Intools
• HAZOP & SIL assessment.
• Plant Modification (PMP/MOC) studies (CDP/FEED)
• Project Co-ordination and Management.
• Pre-Commissioning/Commissioning of DCS, ESD, PLC’s, VMS, F&G and field instrumentation
• Troubleshooting & maintenance of I&C Systems.Review design documents & technical proposal

Languages

English
Expert
Urdu
Expert