civil inspector
Dewan Architects + Engineering
مجموع سنوات الخبرة :16 years, 5 أشهر
I am working in Dewan Architects+Engineering as a civil Inspector. My duty is to check the quality of work according to project specifications and drawings and ensure work should be done according to the projects specification and Drawings.
I am working in Arif&Bintoak as a civil Inspector. My duty is to check the quality of work according to project specifications and ensure work should be done according to the projects specification and Drawings.
Monitoring and administering the QA/QC Plan or Program and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.
Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
Assuring the acceptable quality of materials, processes, and workmanship in the project work.
Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.
Issue materials receiving report for the delivered materials.
Waterproofing checking underground level and in wet areas in the building.
Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test.
Finishing work checking in a presence of the Engineer or Consultant, block, plaster, painting, tiling, kitchen cabinets, wardrobes, ceiling and light fittings.
Maintain standards of safety and comply with Company’s Health, Safety and Environment Management System requirements.
Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.
Inspect the excavation work to meet require level for holding tanks and sewer line.
Monitor Compaction at base; inspect reinforcement, form works and cast-in-situ for holding tanks.
Inspect reinforcement, form works & proper covering before concrete pouring.
Inspect concrete (slump, temperature, work ability) before & during pouring.
Inspecting / checking Layout for sewer line, manholes etc.
Maintain all level from previous lines to holding tanks & also previous lateral/extended lines to manholes.
Also maintain the level from holding tank to new sewer line.
Monitor the jointing process (bell & spigot) to ensure that rubber seal lubricated properly and pipe should be in proper alignment to avoid and damage.
Monitor back filling process layer wise & back filling material must be free of big rocks to not damage the pipeline.
Making / updating daily reports.
Attested from the Embassy of UAE & Oman
Attested from the Embassy of UAE