Mechanical Engineer
KLING CONSULT
Total years of experience :12 years, 7 Months
Develop new tooling concepts and techniques to maximise efficiency by supervising complete mechanical services according to contract requirements. Conduct build-versus-buy analysis for new equipment for approval of mechanical material. Organise design documentation, utilising detailed technical drawings and engineering specifications for inspection purpose. Perform installation checks prior to pre-commissioning activities, as well as generated inspection reports. Follow-up and monitor corrective and preventive action plans of the contractor. Analysed equipment performance and identified inefficiencies by carrying out an on-site investigation of reported faults and operating deficiencies.
Key Projects:
Jewel of the Creek Development - Five Stars Hotel Construction with four hotel apartment buildings (Package 8).
Client: Dubai International Real Estate
AMZ Valentina Lounge and Restaurant - VIP Lounge and Restaurant at Jumeirah Beach.
Client: Abdul-Munim Qais Al-Zawawi
Dubai Design District - Business Bay Project- Core Buildings (2B+5+5), North & South Extensions (2B+6+13)
Client: Tamdeen
ADAC Commercial Building - Commercial Building at T3 Business Park (14, 685 SQM)
Client: Abu Dhabi Airports Company
•Supported in answering the technical query raised by contractors (RFI) in a timely manner, and coordinated with civil, architectural, structural drawings and other MEP services
•Ensured the health and safety compliance by identifying potential safety concerns and informed the contractors regarding emerging risks.
•Reviewed and approved of mechanical materials submittals, Mechanical Shop Drawings and Coordination Drawings.
•Coordinated with a client for inspection activities for witness/hold point in an efficient manner.
•Observed all mechanical engineering aspects during project execution in accordance with agreed contract documents and processes.Identify non-conforming work or materials, notify contractor and keep a record. Follow up and review corrective and preventive measure taken by the Contractor
•Supervised project from inception to completion while preserving a complete record of project execution.
•Resolved all queries of the commissioning team by communicating directly with the main contractor.
Delivered engineering services in all aspects of the project while leading mechanical and electrical teams. Planned the rations for machinery according to maintenance schedule and erection requirements. Directed all the subcontractors at the site to ensure the completion of work in accordance with required quality, delivery time, and cost. Designed the coordination drawings and revised it according to the site needs.
Key Projects:
T3 Inspection Facility.
•Delivered engineering support to install various systems, such as firefighting and fire alarm, drainage and stormwater, water supply and irrigation, low current, HVAC, and electrical and power systems.
•Ensured that the highest quality of MEP construction work, in accordance with project specific cost and scheduled requirements.
Produced and implemented designs and test procedures, which included the piping design of the headers for the chillers and pump room according to the site requirements.
Key Projects:
Port Rashid New Cruise Terminal.
•Supervised the installation the equipment and Piping works of numerous systems, containing drainage and stormwater systems and water supply system, while ensuring safety, reliability, and efficiency.
•Oversaw the functioning of HVAC System (Chilled Water System- FAHU-AHU-FCU) with all related ducting and piping mechanism.
Saipem/UCECC, Berkine basin
Identified and finalised problems to deliver solutions while operating with the modifications and the technical queries. Structured and monitored the daily fabrication and erection activities by positioning teams. Oversaw the pipefitter’s performance according to the Isometrics and piping arrangement. Enhanced the skills of welders by describing the Welding Procedure Specification (WPS).
Key Projects:
MLE Pipeline and Gathering System.
•Generated the daily progress report and collaborated with the project manager and concerned department.
Additional Experience:
Technical Office Engineer,
Machineries Training
in