وسام غنيم, Lead  Electrical Commissioning Engineer

وسام غنيم

Lead Electrical Commissioning Engineer

Alghanim International

البلد
الكويت
التعليم
بكالوريوس, commissioning engineer
الخبرات
13 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 4 أشهر

Lead Electrical Commissioning Engineer في Alghanim International
  • الكويت - الكويت
  • أشغل هذه الوظيفة منذ أغسطس 2014

• Subiya Power Plant, 2*250 MW simple cycle

activities:-
- Testing Plant Generators 2* 300 MW SIEMENS Production.
- Testing Main and Aux. XFMRs for the CTG units HYOSUNG Production.
- Testing isolated phase bus (IPB) for CTG units.
- Testing generator circuit breakers (GCB) for CTG units.
- Testing MV SWGR ABB production
• Make function test of all incoming and outgoing cells.
• Make primary injection test for CT, VT and BB protection.
• Make secondary injection to test protection relays
- Testing DC system \{Battery, battery charger, inverter & UPS (125 KVA)\} EMERSON production.
- Testing Black Start Diesel Generator 11KV, 6*1.5 MW.
- Testing protection of Generators, Main and Aux transformers.
- Testing lube oil skid, seal oil skid, hydraulic skid, HCO skid and CCW for lube oil and H2.
- Testing Emergency MCC, Gas compressor MCC and, Auxiliary MCC
- Make interconnection signals, and interlocks tests for the two units between \{XFMRs - TPP - GCB - MV SWGR - GPP -SWYD - FIRE\}.

Sr. Electrical Commissioning Engineer في Power System projects
  • مصر - القاهرة
  • يناير 2011 إلى أغسطس 2014

From: October 2013 Till: NOW

BANHA Power Plant 750MW combined cycle

- Testing Power Transformers for the STG Unit, TBEA Production.
- Testing Isolated Phase Bus (IPB) for STG Units.
- Make loop check activities for all systems.
- Make interconnection signals, and interlocks tests for the STG unit
between \{XFMR - TPP - MCC - GPP -SWYD - FIRE\}.


From: February 2013 To: November 2013

Giza North Power Plant (2*750 MW) // Combined Cycle

- Testing Power Transformers for All CTG and STG Units TBEA Production.
- Testing Transformers Protection Relays GE Production Differential and OC \{T35-T60-GE 350\} for All Units.
- Testing DC System\{Batteries, Batteries’ Chargers, Inverter, UPS, and Distribution Panels\}
- Testing Isolated Phase Bus (IPB) for All Units.
- Testing Generator Circuit Breakers (GCB) for All Units.



From: September 2012 To: January 2013

• El-Ein El-Sokhna Thermal Power Plant (2*650 MW

- Testing all power Transformers for the 2 units HYOSUNG production.
- Testing transformers protection relays GE Production Diff and OC \{T35-T60-350\}for 2 units
- Testing isolated phase bus (IPB) for 2 units.
- Testing generator circuit breakers (GCB) for 2 units.
- Make interconnection signals, and interlocks tests for the 1st unit between \{Transformers - TPP - GCB - MV SWGR - GPP -SWYD - FIRE\}.
- Attendance gas dissolved analyser and partial discharge monitoring testing.



From: July 2012 To: August 2012

• Suez Steel Co. substation (220 MW) // 220/33/6.6 KV


- Test 33KV SWGR, 3 SWGR 6.6KV ABB Productions.
- Make function test of all incoming and outgoing cells.
- Make primary injection test for CT’s and VT’s.
- Make secondary injection to test protection relays for feeder protection (REF 610, 615), and motor protection (REM 610), and differential protection (RET 541).
- Make stability test for power transformers.
- Make B.B test for all SWGR’s.
- Test all power and distribution transformers (15 Transformers).
- Testing medium voltage cables.




From: May 2012 To : June 2012

• West Damietta Power Plant subsidiary KHARAFI NATIONAL (4*125MW) // Simple Cycle

- Make interconnection signals, and interlocks tests for all the units between \{XFMRs - TPP - GCB - MV SWGR - GPP -SWYD - FIRE\}.
- Make stability test for main and aux. transformers for all units.




From May 2011 To : June 2011


• EL SHABAB Power Plant subsidiary KHARAFI NATIONAL (8*125MW) // Simple Cycle
- Make interconnection signals, and interlocks tests for all the units between \{XFMRs - TPP - GCB - MV SWGR - GPP -SWYD - FIRE\}.
- Make stability test for main and aux. transformers for all units.





From January 2011 To : May 2012

• ABU QIR Thermal Power Plant (2*650 MW)


- Testing all power XFMRs for the 2 units ABB Production.
- Testing transformers protection relays GE Production Diff and OC \{T35-T60-Miff ll\} for 2 units.
- Make stability test for main and aux. transformers for 2 units.
- Testing DC system\{Batteries, batteries ‘chargers, inverter, UPS, and distribution panels\}
- Testing isolated phase bus (IPB) for 2 units.
- Testing generator circuit breakers (GCB) for 2 units.
- Testing MV SWGR (function test) and MCC (functional test - setting).
- Testing medium and low voltage cables.
- Make loop check test for all systems.
- Make interconnection signals, and interlocks tests for the two units between \{XFMRs - TPP - GCB - MV SWGR - GPP -SWYD - FIRE\}.
- Attendance gas dissolved analyzer and partial discharge monitoring testing.




From July 2009 To : October 2009

• NUBARIA lll Power station 750MW combined cycle
(training)

- Testing Medium and low voltage cables.
- Make loop check test for some systems.

الخلفية التعليمية

بكالوريوس, commissioning engineer
  • في Faculity of Engineering, Electrical Power and Machining Department, Tanta University
  • أغسطس 2010

Specialties & Skills

Protection
محطات توليد الطاقة
محولات
Electrical Testing
time management
communication skills
اختبارات المحولات و وقايتها
commissioning inter connection signals for power plant
testing MV SWGRS

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

Egyptian Syndicate of Professional Engineers
  • Member
  • December 2010

التدريب و الشهادات

no certificate (الشهادة)
تاريخ الدورة:
July 2009
صالحة لغاية:
October 2009

الهوايات

  • Good public relation, Scientific Research, and Running