May 2009 - Present: Mechanical Design Manager
Nesma & Parterns, Al Khobar - KSA
Projects Worked On:
Umm Wu’al FSA & Decant Water Treatment
April 2017- Up to Date
To build a water treatment process to control of the fluosilicic acid level in the decant water associated with gypsum wet disposal system.
Fadhili Bachelor Camp-Saudi Aramco
August 2016- Up to Date
To build 13 Multi-storey residential buildings, recreation facilities and support facilities.
National Guard Health Affairs Specialized Hospitals
December 2013-July 2016
To build 5 hospitals for the Saudi Arabian National Guard in 4 separate cities across the Kingdom. This 450, 000 square meter, 1400 bed project is underway on track, working closely with Jacobs as a team to ensure project success.
KAUST New Student Housing, Thuwal
January 2014- October 2014
Design, development and construction of:
Twenty-two (22) identical four (4) story buildings based upon a modified version of Building Type 20, on the KAUST campus, to accommodate a minimum of 700 students, Electrical substation, External chiller plant Hard and soft landscape works Ground works Access roads (including intersections with the existing road network), pedestrian and cycle paths Shaded car parking
All necessary connecting utilities
Riyadh Metro
September 2013-June 2014
The Riyadh metro is a proposed rapid transit system in Riyadh, Saudi Arabia. It is planned as the backbone of the city’s public transport system. The Metro Project comprises six (6) Lines covering the Capital. Task was the design review for the mechanical systems that serve the above ground, elevated and underground stations serving the Metro and Rail lines. An extensive review with all other disciplines took place during to ensure an integrated design.
Sadara, DOW/Aramco
September 2012-November 2013
JODP, Mecca
December 2010 - August 2012
The Jabal Omar Development Project is a unique urban regeneration scheme aimed at providing hotel accommodation, commercial/retail spaces, car parking, public spaces, and public amenities to support religious, social and commercial activities to Hajj and Umrah pilgrims.The project is located in Makkah Al-Mukarramah west of the Grand Mosque.
Rabigh Cable Factory, Jeddah
May 2009 - January 2010
Olaya Twin Towers, Riyadh
June 2009 - March 2011
The GOSI Olaya Towers Project with a total built-up area of approximately 250, 000 m2. Tower "A" consists of thirty six (36) floors and Tower "B" consists of thirty four (34) floors
Responsibilities:
• Direct and manage projects development and progress.
• Coordinate technical issues with other disciplines on projects including constructability requirements and reviews.
• Preparation of standard discipline deliverables, using company standard work processes and tools.
• Review of contract requirements and scope as they related to various work disciplines.
• Lead technical discussions with subcontractors and specialized suppliers.
• Review of technical Submittals to meet the specified requirements.
• Prepare and present reports for formal studies.
• Responsible for monitoring, updating, and planning of schedules.
• Co-ordinate with the project consultants on design development and construction.
• Provide technical direction for specific tasks and assign work to subordinate engineers, designers, drafters or project sub-groups.
• Exhibit good verbal and written communication skills; communicates clearly on technical matters.
• Mentor team members
• Report to Engineering Manager on technical and staffing matters.