Dy. Construction Manager
Chetak Enterprises Ltd.
Total years of experience :11 years, 11 Months
• Review engineering documentation prepared by external designer to ensure compliance with the contract.
• Heading a team of 7 Engineer/Sr Engineer working for technical support, billing and planning.
• Review technical submittal of vendors to ensure compliance with project requirement.
• Deeply Involved in strategic planning and feasibility of structure in hilly terrain bridges.
• Technical Co-ordination with Designers and Specialized sub-contractor for implementation.
• Productivity Monitoring, corrective action plan for improvement.
• Involved in Change of Scope submission of amount Rs. 750 Cr.
• Preparation and submission of technical submissions.
• Support construction activities by preparing shop drawings & resolving technical issues with the vendors/designer.
• Support commissioning activities - preparation of commissioning procedures & schedules.
• Scheduling/Monitoring of construction Program, Resource deployment schedule, Resource selection and Optimization.
• Preparation of construction Methodology & Time cycle Analysis.
• Checking of all documents and permits for critical activates like lifting, erection and excavation.
• Ensuring quality of the structure and safety of the work.
• Checking of casting in-situ span, continuous span and portal beam structure
• Checking of super structure Operation like erection of span (with Double box Launching girder) gluing, stressing, auto launching, grouting, bearing fixing (pot and elastomer) and alignment.
• Checking of super structure erection with balance cantilever method.
• Checking of super structure erection with Ground support and Sliding method.
• Making Daily report and update the progress.
• Checking and supervision of pier cap (precast) erection and construction at site.
• Checking of all structure members and related operation along with all quality criteria as per method statement (cast in situ pile, mono pile, pile load test, pile cap, pier, water proofing, witness for onsite offsite testing and mock up etc.)
• Finishing work for Metro Rail viaduct.
• Checking of LG (single box) fabrication and related structure.
• Preparation of Method Statements for LG erection and operation.
• Estimation of material and labour.
• Erection of temporary structure for LG.
• Erection of Launching girder and segments.
• Compliance of safety point regarding LG erection and operation.
• Checking drawing and design and coordinate with designer.
• Gluing, stressing, Load test, grouting, launching of SLG and other related operation.
• Fixing of bearing and alignment of span.
• Erection of parapet.
• Pre-stressing work
• Precast work for I - beam and box girder segments.
• Erection of I girder
• Estimation of material and labour work
• Erection of box girder under live railway line
• Checking of Quality of Material
• Handling finishing and road work
• Execution of all the structural elements like pile, pile cap, pier, pier cap, bearing and related item of super structure.
• Preparation of Concrete Mix Design & checking Quality of Concrete
• Solution of quality related issue & Documentation for same
• checking of temporary structure