MEP Manager
Fakeeh Care Corporate
مجموع سنوات الخبرة :23 years, 8 أشهر
Key Projects Handled:
Design review Fakeeh East Jeddah hospital (250 bed)
Design review Fakeeh North Jeddah hospital (220 bed)
Design review Specialized Fakeeh Heal Center (180 bed) - JV DAR Engineering & HDR
Design review Fakeeh Makkah hospital - MASSAR (250 bed) - JV DAR Engineering & HDR
Design review Madinah hospital (16 story, 60 clinics, 200 beds - BAU 65000m2) - DAR Engineering
Design review for surgical tower (13 story, 150 beds - BAU 42000m2) - ZFP
Design & Engineering Management for Fakeeh Medical Center in Makkah (BAU 15000m2)
Design & Engineering Management for Obhur Fakeeh Medical Center (BAU 12000m2)
Design & Engineering Management for Medical Skills and Clinical lab Center (BAU 8000m2)
Design & Site Supervision for Saudi Medical Service renovation day surgery, Radiology, ER & 60 clinics
Technical evaluation for multiple existing buildings to be converted to hospital
Design review for 3 state of art medical centers (BAU 9000m2) - Studio Altieri
Design review and evaluation of Tier-2 data center - BTC
Design Review, engineering for on-grid 650 KWp PV solar system
Site supervision for fit out 2 medical centers each (BAU 6500m2)
Site supervision for renovated fit out for OR, ER, day surgery, RDU, Physiotherapy, 350 inpatient and ICU bed & 120 clinics, etc.
Site supervision of multi-story parking 750 lots
Technical & site supervision for Smoke Management, chillers, PTS, automated pharmacy and main lab Projects
Lead testing and commissioning phase for Diabetes & urgent care center (BAU 13500m2) & Fakeeh medical college
Key Responsibilities:
Handling project portfolio consist of multiple project programs with estimated construction cost of (3.3B SR) either in-house or in coordination with top rated international and local consultants, the programs include
• Greenfield state of art hospitals and special hospitals • Greenfield high-end medical center • Retrofit and Fit-out non-medical building to hospitals and medical center • Renovation projects of the operated healthcare buildings • Restaurants and Retails for medical supplies, optics
Create & develop Owner’s Project Requirements, design guidelines & specs, Basis of Design, SOW, RFP, RFQ
Continues improvements and updates for Fakeeh MEP Manual based on latest technologies, standards, regulations considering energy efficiency, digitalization, AI, IoT, open integration platforms capabilities for systems and equipment.
Creating bidders’ selection criteria to evaluate contenders’ both contractors & consultants
Entrusted with overall responsibility of managing MEP department for design and construction healthcare projects from pre-concept till tender, design review; alignment with applicable codes accreditation bodies, deployment of sustainable and energy saving systems. Adhering to project management processes: initiating, planning, executing, controlling and closing a project
Instrumental in project management and MAP design from conceptual design up to tender, bidding and selection; lead the technical review of system design and documentation, in compliance with codes
Defining scheduling, budget and resource management activities for most complex projects; developing QA/QC plan, ITP, method of statement, checklist forms for all systems; testing & commissioning to ensure complying project quality & specifications
Actively involving in all aspects of individual projects including resource coordination, schedule creation/tracking, monthly reporting and change and risk to management, stakeholder involvement
Key Projects Handled:
SIBCO, Pepsi Mega Plant Project: 25 MVA - Land Area 310, 000 m2 - 125, 000 m2 BUA
Scope:
Spearheaded a team of Multi-National & Western workforce for the Biggest Pepsi plant Worldwide achieving SILVER LEED certificate (2.4B SR), headed the process & production lines machinery, automated warehouses, monorails, LGVs, electrified FLT & all utilities such as 2 no. Tier-2 data center; compressor plant; 2 chiller plant each (4300TR); steam boiler plant; WTP (12000 m3/day); WWTP (5000 m3/day); CO2 plant and cold store
Successfully executed 40 cubicle MV switchgears, 19 transformers, bus ducts, LV network cables, switchgears, MCC, PFC, 10 MVA backup generators, SCADA system
Deliver fire alarm, Vesda, voice evacuation, integrated security system, BMS, lighting control, energy management & ICT systems
Key Responsibilities:
Spearheaded projects and team, with comprehensive Project Management skills in detailed design, construction, QA/QC verification, testing & commissioning, start-up & handing over
Checked documents for design; calculations; alignment with codes; Pepsi regulations and plant operability
Directed all MEP services including construction and commissioning packs, scope of works, procedures, and documentations for all systems, sub-systems, etc.
Reviewed and approved project construction & design documents to ensure they meet business requirements.
Liaised with customer, management and procurement vendors for mobilizing resources in accordance with project phases
Coordination with client, stakeholders and other professionals for seamless project execution.
Facilitated safety process, conflict solutions to insure achievement of milestones and budget limitations
Enforced strict mechanisms to achieve desired QA/QC plan by establishing ITP, method of statement, template, checklist forms for each system; ensured contractor maintains project quality and specifications
Generated an array of technical and management reports; maintained accurate record and documents for projects handled and identified variation, suggested modifications
Coordinated closely with the team, contractors/ sub-contractors to ensure quality and conformity with plans, specifications and timely handover of project; closed out all snag lists, document and deliver as-built & O&M manuals
Managed training plan to end-user staff during the testing & commissioning to strengthen staff skills and capabilities
Key Projects Handled:
1. King Abdul-Aziz University (KAU) projects (4.2B SR) - (site supervision, design review, design, technical office):
Site supervision & Engineering
Portfolio of different faculties, offices and labs buildings and infrastructure consist of 26 building in Jeddah campus 332200m2, 24 buildings in Rabigh campus 90000m2, 26 buildings in North Jeddah campus 77000m2, 12 buildings Kholays & Kamal Campus
Jeddah female campus infrastructure (22 MVA)
Female housing renovation: 8 buildings (240 flats) and chiller plant
Design review
Rabigh educational hospital (400 beds) /One day care center surgery (60 bed) + outpatient clinics
Faculty of medicine for male & female
Preparation year building/Society college and Rescue building
Design
Male housing renovation: 120 buildings/ Infrastructure for Jeddah male campus (15 MVA)
4 no. proto-type Tier 2 data center
power station plant (16 MVA - 16 Diesel generators), step up transformers, synchronization panels, distribution network, MV/LV switchgears, protection relays for North Jeddah University
Rabigh campus infrastructure 102400m2 land area, 90700m2 BUA & 16 MVA, street lighting & telecom networks
2. Taiba Hotel (Madinah) - (Design)
Plots no. 163, 164&125 - 16 story (600 key) including 4 parking basements, food court & roof
3. Endowment of Ali Ibrahim El-Mahlawy Hotel (Makkah) - (Design)
20 story (500 key) including 2 parking basements, food court & roof
4. Development of Jeddah 2nd industrial city “6 Km2, 50 km of roads” - (Site Supervision); Client: MODON
Administrated the installation of infrastructure including laying, splice & termination of 78Km MV cables, RMUs, unit substations, lighting panels, 2200 street lighting pole, 42 high masts, 91Km of LV distribution network
5. King Abdullah Economic City (KAEC) - (Site Supervision): Client: EMAAR; Project Manager: Turner
Bay La Sun (RSV-V01-A1) - 8 high rise residential commercial towers - 13 floors, 190357m2, 12MVA
Street of Dreams (SOD) - 7 luxury high end mockup villas
6. Al-Thuraya Colleges “Waad Academy” - (Design Review)
7 buildings (educational, offices, workshops, labs, housing, sports hall, football court and landscaping)
Key Responsibilities:
Seamlessly implemented-project rollouts (Scope, planning & sequencing)/project meetings, reviewing designs; selecting material; review drawings and managing site activities
Supervised progress at various stages to assure completion within time/cost constraints, while complying with established quality standards, O&M manuals and as-built drawings
Optimized resources and improved productivity in the face of budgetary restrictions. Checked for project variations, timely vendor payments to ascertain project closure in time without delays
Ascertained resource allocation estimates; created charts and schedules; identified risks and monitored project progress and informed the same to team, clients, and project managers to enable proactive service.
Key Projects Handled:
Staff accommodation - Administration office - Surveying lab building
5000 m3/day Water Treatment Plant
Infrastructure projects including MV cables, RMU, substation, LV cables and street lighting
Renovation of 187 villas, office & educational Buildings
Kay Responsibilities:
Instrumental in project management and electric design engineering for electrical systems including MV & LV cables network, Distribution transformers, RMU, Packaged substation, 4.16 & 13.8KV MV switchgear, MDB, panel boards, lighting and power final circuits .
Planned, scheduled and coordinated detailed phases of engineering work, demonstrated comprehensive understanding of electrical works for buildings and supervised technicians, electricians and labors
Key Projects Handled:
Wadi El-Natroun General Hospital 300 bed
Directorate of health affairs building - 12 story
Alexandria Royal 4 stars hotel - 13 story
Mixed use tower, 22 story (parking, mall, offices, residential)
Miroza residential compound: 200 deluxe villas including infrastructure
Delta Sharm resort extension villas & MV & LV infrastructure
Touristic Resort, 150 villas, chalet and landscape
Commercial residential complex 4 podium & 6 towers each 16 story
Commercial residential complex 3 podium & 5 towers each 14 story
Key Responsibilities:
Coordinated with the client and contractors, prepared electrical design drawing (grounding, light, power, distribution, all related low current systems) based on codes, standards and client requirements
Ensured all technical aspects of the projects are strictly complied with and in conformity with conditions of contract, particular specifications and contract drawings & BOQ for tendering
Provided guidance, managerial, technical support to complete project team, analyzing drawings, specifications and statements of work for project resource planning and scheduling
Established and monitored program and project controls and KPI's, issued final payments certificates and participated with staff in reviewing the close out report prior to submission to client
Responsibilities & Duties:
• Monitored and operated securely and economically of Alexandria and northern coast power system 66 KV network and 220/66/11 KV substation using SCADA System
• Assured continuous running and fault free operation of substations and equipment by kept proper maintenance schedules
• Monitored and analyzed the electrical system parameters, make accurate and timely decisions and to help prevent incidents that might occur all with the help of the SCADA system
Responsibilities & Duties:
Electrical installations - Pre-bidding and tenders studies and pricing - Quotations preparation - Electrical materials technical submittals - Quantity surveying, Procurement, materials inspection - Shop drawing and As-built drawing - Execution at site - Material control
Projects Handled:
Electrical Installations for Misr Petroleum warehouse in Aswan
Electrical Installations for McDonald's branches (5 branches)
Electrical Installations for Steel factory, Alexandria, Borg El-Arab
Technical office activities for different projects such as banks, residential buildings, Malls and pumping stations