Key Projects Handled:
 Design review Fakeeh East Jeddah hospital (250 bed)
 Design review Fakeeh North Jeddah hospital (220 bed)
 Design review Specialized Fakeeh Heal Center (180 bed) - JV DAR Engineering & HDR
 Design review Fakeeh Makkah hospital - MASSAR (250 bed) - JV DAR Engineering & HDR
 Design review Madinah hospital (16 story, 60 clinics, 200 beds - BAU 65000m2) - DAR Engineering
 Design review for surgical tower (13 story, 150 beds - BAU 42000m2) - ZFP
 Design & Engineering Management for Fakeeh Medical Center in Makkah (BAU 15000m2)
 Design & Engineering Management for Obhur Fakeeh Medical Center (BAU 12000m2)
 Design & Engineering Management for Medical Skills and Clinical lab Center (BAU 8000m2)
 Design & Site Supervision for Saudi Medical Service renovation day surgery, Radiology, ER & 60 clinics
 Technical evaluation for multiple existing buildings to be converted to hospital
 Design review for 3 state of art medical centers (BAU 9000m2) - Studio Altieri
 Design review and evaluation of Tier-2 data center - BTC
 Design Review, engineering for on-grid 650 KWp PV solar system
 Site supervision for fit out 2 medical centers each (BAU 6500m2)
 Site supervision for renovated fit out for OR, ER, day surgery, RDU, Physiotherapy, 350 inpatient and ICU bed & 120 clinics, etc.
 Site supervision of multi-story parking 750 lots
 Technical & site supervision for Smoke Management, chillers, PTS, automated pharmacy and main lab Projects
 Lead testing and commissioning phase for Diabetes & urgent care center (BAU 13500m2) & Fakeeh medical college
Key Responsibilities:
 Handling project portfolio consist of multiple project programs with estimated construction cost of (3.3B SR) either in-house or in coordination with top rated international and local consultants, the programs include
• Greenfield state of art hospitals and special hospitals • Greenfield high-end medical center • Retrofit and Fit-out non-medical building to hospitals and medical center • Renovation projects of the operated healthcare buildings • Restaurants and Retails for medical supplies, optics
 Create & develop Owner’s Project Requirements, design guidelines & specs, Basis of Design, SOW, RFP, RFQ
 Continues improvements and updates for Fakeeh MEP Manual based on latest technologies, standards, regulations considering energy efficiency, digitalization, AI, IoT, open integration platforms capabilities for systems and equipment.
 Creating bidders’ selection criteria to evaluate contenders’ both contractors & consultants
 Entrusted with overall responsibility of managing MEP department for design and construction healthcare projects from pre-concept till tender, design review; alignment with applicable codes accreditation bodies, deployment of sustainable and energy saving systems. Adhering to project management processes: initiating, planning, executing, controlling and closing a project
 Instrumental in project management and MAP design from conceptual design up to tender, bidding and selection; lead the technical review of system design and documentation, in compliance with codes
 Defining scheduling, budget and resource management activities for most complex projects; developing QA/QC plan, ITP, method of statement, checklist forms for all systems; testing & commissioning to ensure complying project quality & specifications
 Actively involving in all aspects of individual projects including resource coordination, schedule creation/tracking, monthly reporting and change and risk to management, stakeholder involvement

Electrical Design & Construction Manager في SIBCO, Pepsi Mega Plant Project
  • المملكة العربية السعودية - جدة
  • مايو 2014 إلى أغسطس 2017

Key Projects Handled:
SIBCO, Pepsi Mega Plant Project: 25 MVA - Land Area 310, 000 m2 - 125, 000 m2 BUA
Scope:
 Spearheaded a team of Multi-National & Western workforce for the Biggest Pepsi plant Worldwide achieving SILVER LEED certificate (2.4B SR), headed the process & production lines machinery, automated warehouses, monorails, LGVs, electrified FLT & all utilities such as 2 no. Tier-2 data center; compressor plant; 2 chiller plant each (4300TR); steam boiler plant; WTP (12000 m3/day); WWTP (5000 m3/day); CO2 plant and cold store
 Successfully executed 40 cubicle MV switchgears, 19 transformers, bus ducts, LV network cables, switchgears, MCC, PFC, 10 MVA backup generators, SCADA system
 Deliver fire alarm, Vesda, voice evacuation, integrated security system, BMS, lighting control, energy management & ICT systems
Key Responsibilities:
 Spearheaded projects and team, with comprehensive Project Management skills in detailed design, construction, QA/QC verification, testing & commissioning, start-up & handing over
 Checked documents for design; calculations; alignment with codes; Pepsi regulations and plant operability
 Directed all MEP services including construction and commissioning packs, scope of works, procedures, and documentations for all systems, sub-systems, etc.
 Reviewed and approved project construction & design documents to ensure they meet business requirements.
 Liaised with customer, management and procurement vendors for mobilizing resources in accordance with project phases
 Coordination with client, stakeholders and other professionals for seamless project execution.
 Facilitated safety process, conflict solutions to insure achievement of milestones and budget limitations
 Enforced strict mechanisms to achieve desired QA/QC plan by establishing ITP, method of statement, template, checklist forms for each system; ensured contractor maintains project quality and specifications
 Generated an array of technical and management reports; maintained accurate record and documents for projects handled and identified variation, suggested modifications
 Coordinated closely with the team, contractors/ sub-contractors to ensure quality and conformity with plans, specifications and timely handover of project; closed out all snag lists, document and deliver as-built & O&M manuals
 Managed training plan to end-user staff during the testing & commissioning to strengthen staff skills and capabilities

Senior Electrical Engineer في Zuhair Fayez Partnership Consultants
  • المملكة العربية السعودية - جدة
  • يوليو 2008 إلى مارس 2014

Key Projects Handled:
1. King Abdul-Aziz University (KAU) projects (4.2B SR) - (site supervision, design review, design, technical office):
Site supervision & Engineering
 Portfolio of different faculties, offices and labs buildings and infrastructure consist of 26 building in Jeddah campus 332200m2, 24 buildings in Rabigh campus 90000m2, 26 buildings in North Jeddah campus 77000m2, 12 buildings Kholays & Kamal Campus
 Jeddah female campus infrastructure (22 MVA)
 Female housing renovation: 8 buildings (240 flats) and chiller plant
Design review
 Rabigh educational hospital (400 beds) /One day care center surgery (60 bed) + outpatient clinics
 Faculty of medicine for male & female
 Preparation year building/Society college and Rescue building
Design
 Male housing renovation: 120 buildings/ Infrastructure for Jeddah male campus (15 MVA)
 4 no. proto-type Tier 2 data center
 power station plant (16 MVA - 16 Diesel generators), step up transformers, synchronization panels, distribution network, MV/LV switchgears, protection relays for North Jeddah University
 Rabigh campus infrastructure 102400m2 land area, 90700m2 BUA & 16 MVA, street lighting & telecom networks
2. Taiba Hotel (Madinah) - (Design)
 Plots no. 163, 164&125 - 16 story (600 key) including 4 parking basements, food court & roof
3. Endowment of Ali Ibrahim El-Mahlawy Hotel (Makkah) - (Design)
 20 story (500 key) including 2 parking basements, food court & roof
4. Development of Jeddah 2nd industrial city “6 Km2, 50 km of roads” - (Site Supervision); Client: MODON
 Administrated the installation of infrastructure including laying, splice & termination of 78Km MV cables, RMUs, unit substations, lighting panels, 2200 street lighting pole, 42 high masts, 91Km of LV distribution network
5. King Abdullah Economic City (KAEC) - (Site Supervision): Client: EMAAR; Project Manager: Turner
 Bay La Sun (RSV-V01-A1) - 8 high rise residential commercial towers - 13 floors, 190357m2, 12MVA
 Street of Dreams (SOD) - 7 luxury high end mockup villas
6. Al-Thuraya Colleges “Waad Academy” - (Design Review)
 7 buildings (educational, offices, workshops, labs, housing, sports hall, football court and landscaping)
Key Responsibilities:
 Seamlessly implemented-project rollouts (Scope, planning & sequencing)/project meetings, reviewing designs; selecting material; review drawings and managing site activities
 Supervised progress at various stages to assure completion within time/cost constraints, while complying with established quality standards, O&M manuals and as-built drawings
 Optimized resources and improved productivity in the face of budgetary restrictions. Checked for project variations, timely vendor payments to ascertain project closure in time without delays
 Ascertained resource allocation estimates; created charts and schedules; identified risks and monitored project progress and informed the same to team, clients, and project managers to enable proactive service.

Electrical Site Engineer في Ministry of Defense & Aviation (MODA)
  • المملكة العربية السعودية - الرياض
  • مايو 2006 إلى مايو 2008

Key Projects Handled:
 Staff accommodation - Administration office - Surveying lab building
 5000 m3/day Water Treatment Plant
 Infrastructure projects including MV cables, RMU, substation, LV cables and street lighting
 Renovation of 187 villas, office & educational Buildings
Kay Responsibilities:
 Instrumental in project management and electric design engineering for electrical systems including MV & LV cables network, Distribution transformers, RMU, Packaged substation, 4.16 & 13.8KV MV switchgear, MDB, panel boards, lighting and power final circuits .
 Planned, scheduled and coordinated detailed phases of engineering work, demonstrated comprehensive understanding of electrical works for buildings and supervised technicians, electricians and labors

Electrical Engineer (Design – Site Supervision) في Magdy Mostafa Elattar Consultant Office
  • مصر - الإسكندرية
  • يوليو 2004 إلى مايو 2006

Key Projects Handled:
 Wadi El-Natroun General Hospital 300 bed
 Directorate of health affairs building - 12 story
 Alexandria Royal 4 stars hotel - 13 story
 Mixed use tower, 22 story (parking, mall, offices, residential)
 Miroza residential compound: 200 deluxe villas including infrastructure
 Delta Sharm resort extension villas & MV & LV infrastructure
 Touristic Resort, 150 villas, chalet and landscape
 Commercial residential complex 4 podium & 6 towers each 16 story
 Commercial residential complex 3 podium & 5 towers each 14 story
Key Responsibilities:
 Coordinated with the client and contractors, prepared electrical design drawing (grounding, light, power, distribution, all related low current systems) based on codes, standards and client requirements
 Ensured all technical aspects of the projects are strictly complied with and in conformity with conditions of contract, particular specifications and contract drawings & BOQ for tendering
 Provided guidance, managerial, technical support to complete project team, analyzing drawings, specifications and statements of work for project resource planning and scheduling
 Established and monitored program and project controls and KPI's, issued final payments certificates and participated with staff in reviewing the close out report prior to submission to client

SCADA Control Center Operation Engineer في Egyptian Electricity Transmission Company (EETC)
  • مصر - الإسكندرية
  • نوفمبر 2001 إلى يوليو 2004

 Responsibilities & Duties:
• Monitored and operated securely and economically of Alexandria and northern coast power system 66 KV network and 220/66/11 KV substation using SCADA System
• Assured continuous running and fault free operation of substations and equipment by kept proper maintenance schedules
• Monitored and analyzed the electrical system parameters, make accurate and timely decisions and to help prevent incidents that might occur all with the help of the SCADA system

Electrical Engineer (Site – Technical Office) في Falcon Power Systems
  • مصر - الإسكندرية
  • يوليو 2000 إلى نوفمبر 2001

 Responsibilities & Duties:
Electrical installations - Pre-bidding and tenders studies and pricing - Quotations preparation - Electrical materials technical submittals - Quantity surveying, Procurement, materials inspection - Shop drawing and As-built drawing - Execution at site - Material control
 Projects Handled:
 Electrical Installations for Misr Petroleum warehouse in Aswan
 Electrical Installations for McDonald's branches (5 branches)
 Electrical Installations for Steel factory, Alexandria, Borg El-Arab
 Technical office activities for different projects such as banks, residential buildings, Malls and pumping stations

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Alexandria University
  • يونيو 2000

Specialties & Skills

Electrical Engineering
Building Commissioning
Project Management
Electrical Design
Construction Projects
Resource Management
BMS & Integrated Security
Technical Understanding
Engineering Design
Electrical Engineering
Quality Assurance/Control
Cost, time & Budget Management
Group Dynamics, Leadership
Project Management
Access Control Systems
Technical Reports Writing
Highly Productive/ Resourceful
High Security Installations
MV/ LV Automation
AutoCAD, MS Office
ICT/IP Based Systems Data Center
Testing & Commissioning
Project Delivery
Materials Management
Load Calculations/ LEED
Communication/Presentation/ Reporting & Analytical Skills
Electrical Software/Codes
SCADA & Control Center

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

Egyptian Engineers Syndicate
  • Member
  • October 2000
Saudi Council of Engineers
  • Professional Engineer PE
  • January 2011

التدريب و الشهادات

Electrical Engineering and Power Distribution (تدريب)
معهد التدريب:
2001
ABB on Load Tap Changer (تدريب)
معهد التدريب:
2002
Schneider Electric software (Ecodial 3.36) (تدريب)
معهد التدريب:
2005
Lighting design software (DIALux 4.07) (تدريب)
معهد التدريب:
2010
Cummins Power Generation (تدريب)
معهد التدريب:
2010
Safety Design in Building (تدريب)
معهد التدريب:
2015
Handling Difficult People (تدريب)
معهد التدريب:
2015
Time Management (تدريب)
معهد التدريب:
2016
Schneider Electric software (Ecodial AC 4.4 SA) (تدريب)
معهد التدريب:
2016
Technical Report Writing (تدريب)
معهد التدريب:
2017