MEP Designer Engineer
BAHRAMEND Engineering Consultancy.
Total years of experience :20 years, 10 Months
1- Design & Inspector Electro-Mechanical (HVAC, plumping(Water Supply, Drainage)
2- Design Electrical work (low tension power(calculation loud, SLD), transformer )
3- Design firefighting system and firefighting Alarms and irrigation System.
For the following projects Surkolu Monument Project (Landscape), Commercial building, Water Treatment Plant / Sulaimany and Guly shar Complex Building,
• Put plan for each subcontractor and Follow up the telecom installation progress with them.
• Follow up the definition and the MUX plan for new sites project order to make E1 mapping and put the sites on air.
• Coordinate with Logistic Department and requested the Telecom (SMR) in order to provide the subcontractor with the necessary materials.
• Audit on the telecom equipment work
• Lead upgrade projects (DCS, SDH, congestion sites, 3G project) from rollout side.
• Follow up and put the forecast plan for new Project as below :
- Baghdad PH#01, Baghdad PH#02, CII PH#01, Dyala PH#01
• Oct. 2010- till now working with Korek telecom
My Title: BSS&TXN Supervisor / Rollout.
Location: Iraq / Baghdad.
My Task:
• Put plan for each subcontractor and Follow up the telecom installation progress with them.
• Follow up the definition and the MUX plan for new sites project order to make E1 mapping and put the sites on air.
• Coordinate with Logistic Department and requested the Telecom (SMR) in order to provide the subcontractor with the necessary materials.
• Audit on the telecom equipment work
• Lead upgrade projects (DCS, SDH, congestion sites, 3G project) from rollout side.
• Follow up and put the forecast plan for new Project as below: - Baghdad PH#01, Baghdad PH#02, CII PH#01, Dyala PH#01
• Oct. 2009 - till now working with BAHRAMEND Engineering Consultancy.
My Title: MEP Designer Engineer / Part time
Location: Iraq / Baghdad & Sulaimany.
My Task: 1- Design & Inspector Electro-Mechanical (HVAC, plumping (Water Supply, Drainage)
2- Design Electrical work (low tension power (calculation loud, SLD), transformer)
3- Design firefighting system and firefighting Alarms and irrigation System.
For the following projects Surkolu Monument Project (Landscape), Commercial building,
Water Treatment Plant / Sulaimany and Guly shar Complex Building,
Client: Farooq Mula Mustafa Building (B+G+11) & ASIACELL for Telecom) Building
\[DAIKIN AC\].
My Task: Supervise the installation AC \[VRV П\] System, Chilled Water, Fresh Air System\].
Installation and Maintenance Zain Sites (BSCs and BTS), experience in HW alarms
Clearance, Preventive maintenance (P.M.), C.M., Physical change, PH. Audit and
Acceptance new sites (ATP sites & FTK sites), immigration BSCs and normal sites (
Re-routing TRM plan).
• Aug. 2009 working with Zain -Iraq (SBK) Co.
My Title: BSS&TRM Engineer.
Location: Iraq / Baghdad.
My Task: Installation and Maintenance Zain Sites (BSCs and BTS), experience in HW alarms
Clearance, Preventive maintenance (P.M.), C.M., Physical change, PH. Audit and
Acceptance new sites (ATP sites & FTK sites), immigration BSCs and normal sites (
Re-routing TRM plan)
Design, checking & Inspector Electro-Mechanical (HVAC, plumping(Water Supply, Drainage), Electrical work, low tension power(calculation loud, SLD), transformer, swimming pool, firefighting system, irrigation System) for Villas, Resident Building, Trade Center, Salalah Methanol Project in Free Zone, (Technical College in Salalah), Iraqi Embassy-Muscat, Mosque and industrial factory
Supervise the installation AC \[VRV П\] System, Chilled Water, Fresh Air System\].
• May. 2008 working with Omani Engineering Consultancy Co.
My Title: Head of Electro-Mechanical Section - MEP Engineer.
Location: Salalah - Oman
My Task: Design, checking & Inspector Electro-Mechanical (HVAC, plumping (Water
Supply, Drainage), Electrical work, low tension power (calculation loud, SLD), transformer,
swimming pool, firefighting system, irrigation System) for Villas, Resident Building, Trade
Center, Salalah Methanol Project in Free Zone, (Technical College in Salalah), Iraqi
Embassy-Muscat, Mosque and industrial factory.
Worked as Inspector for Mechanical installations (HVAC, Water Supply, Drainage, Fire fighting, Transfer & fire pump).
•Aug. 2007 working with ITS (Iraqi Tech Support) Co.
My Title: HVAC Engineer
Location: Suleimanyah - North of Iraq
•Sept. 2006 working with Mousa Industrial Company (MINCO)
My Title: MEP Site Engineer
Location: Sharjah - U.A.E
Client: H.E Sheikh Faisal Bin Sultan Al Qasimi (Al Majaz Tower Sharjah)
My Task: Worked as Inspector for Mechanical installations (HVAC, Water Supply,
Drainage, Fire fighting, Transfer & fire pump)
installation & Maintenance the medical system and checking designs Electro-Mechanical Machines for Clinics project and hospitals rehabilitations and installation towers (6 -18) m in Arbil and Duhok for medical usage (medical wireless network database
Installation and Maintenance Generators (CAT, Perkins, Aksa), Transfer pumping, Chemical Pumps for factory and Water treatment.
• Aug. 2004 worked with Issam Bureau Group
My Title: Site Engineer
Location: Baghdad - Iraq
Client: Iraqi Government, Ministry of Health
My Task: installation & Maintenance the medical system and checking designs Electro-
Mechanical Machines for Clinics project and hospitals rehabilitations and installation towers
(6 -18) m in Arbil and Duhok for medical usage (medical wireless network database
• Sep. 2003 worked with AL-Rami group Companies (ALRAMI Eng. Contracting Co. Ltd)
My Title: Mechanical Engineer
Location: Baghdad - Iraq
Client: Iraqi Government, Ministry of industry and Ministry of Oil.
My Task: Installation and Maintenance Generators (CAT, Perkins, Aksa), Transfer pumping,
Chemical Pumps for factory and Water treatment.
B.Sc. degree in Mechanical engineering - University of Technology- Iraq - Baghdad 2003. Licenses and Registrations: