Transmission Planning Eng
Umniah
Total years of experience :16 years, 7 Months
Planning:
Site Survey for new LOS.
Design SDH, PDH MW links, Ring.
Tracking for umniah Equipment.
Rollout in ellipse installation and used it to make design.
Used pathloss to make new design and LOS, interference test.
Rollout in umniah phase 4A, 4B…8B Design.
Provide Solution to solve Problem comes with 1m antenna installation that appears in phase 6A.
Installation for new Equipment at tools.
Wi-Max_E: Put full plan for Wi Max sites (68) and its Backhauling and backbone nodes for those sites to figure out needed MW, NEW or upgraded links.
Phase 7A, 140 new sites from dismantled MW: Getting output from (Swap & protect, Nodes, Wi-Max_E) phases to serve; phases: maintenance, MDS, Wi-Max Arispan and urgent needs.
Tracing for dismantled equipment per usage, i.e. Some equipment have LAN card and need to be installed without LAN interface that to use LAN instantly in deferent positions.
Tracking for MW links that assign as Spear part, that to not send teams to wrong side.
Put plans to tack advantages of RTN900 MW links from applying Ring topology.
Aircom preparation plans for 3G:
Give necessary data from network (Map files, GR4 file, lp4 files).
Complete map from BSS to have sites that have 2nd cabinets
Compression and matching O&M site name & code with RF site name & code.
Get data from FR division to decide where new sites, to plan capacity wise.
Study outcomes data from Aircom in several meeting with Co-workers at department.
Completing with Huawei with required needs.
3G Planning.
TRC:
Application form’s for New MW Link’s.
Type Approval’s for New Equipment RTN, NEC NEO Compact.
Manage for TRC on dates & Ref. No. of Cover Letter & links.
Prepare Renewal List for MW links per year.
Prepare Activation list for approved site.
Planning Tool’s :
Pathloss, Mentum ellipse, MapInfo.
Mentum Ellipse :
Make upgrade to 6.9 on server PC.
Import Equipment, map... And MW link.
Installing new version of ellipse8.0.0.
Upgrading ellipse to 8.1.
Survey for new buildings so that it would meet the specifications of the JEA