Sr.project engineet
Jacobs zate
Total years of experience :19 years, 6 Months
Working at Sasref project
Working with SADARA project team as Lead Project Engineer responsible for the construction, pre-commissioning and turnover of 34.5KV & 4.16KV MCC/PIB buildings and one Truck Dispatch Building, In addition to ten buildings and five security gates at Sadara main site .My duties include the following:
a) Managing & monitoring contractor for design & construction activities
b) Reviewing contractor project schedule, material requisitions, TBE & design drawings.
c) Preparing weekly report, presentation to SADARA management, Change order SOW, Company estimate and negotiation strategy.
d) Handling Pre-commissioning & Energization activities.
e) Answering Contractor queries & responding to Contractor letters.
f) Coordinating notice of completion, walk down, following close-out of punch items and turnover process.
g) Acting as procurement manager and business administrator for the project
I am working as Sr.Electrical Engineer. My responsibility includes leading design project team, Reviewing detail design electrical packages & vendor drawings, written scope of work & specification for purchasing electrical equipment, calculations & Technical bid evaluation
Shaybah 115KV overhead transmission line project
I was Working with SAPMT as Electrical Engineer responsible for reviewing the drawing and design packages. Solving the technical query or design issue with coordination with different Saudi Aramco department
Saudi Aramco Riyadh Refinery (DHT Project)
I was working with Saudi Aramco Project Management Team (SAPMT)as Electrical Field Engineer, Site Superintendent responsible for the construction, pre-commissioning and mechanical completion of electrical activities; including cable routing & cable tray installation, grounding and the energization 13.8 KV switchgear, Plant lighting, HVAC system and motors.
Also I had worked for seven month as instrument lead engineer responsible for Loop, Field Testing and commissioning of Fire and Gas Protection System
Power Engineer Trainee in Distribution Unit as a part of COOP program. My project was to verify hands’ voltage drop calculation for electrical distribution using ETAP program
Graduated with B.S degree in Applied Electrical Engineering in August 22, 2004. Courses taken Include Power, Modern Control System and advanced Communication. Elective courses taken are Power System Analysis and Electrical Machines.