Heavy Civil, Industrial & Infrastructure | $950M+ Combined Portfolio
• Progressed through increasingly senior project leadership roles contributing to delivery of $950M+ in heavy civil, industrial, mining, marine, and infrastructure projects across Western Canada.
• Achieved sustained commercial performance with 14%+ average project margins through disciplined execution planning, subcontractor strategy, cost forecasting, and proactive risk mitigation across complex site environments.
• Led structured change management frameworks recovering 10%-40% of contract value on projects impacted by evolving design maturity and unforeseen site conditions, protecting profitability and contractual position.
• Served as primary client interface with owners, engineering consultants, and regulatory authorities including Ministries of Transportation, strengthening alignment on permitting, compliance, and execution strategy.
• Directed multidisciplinary scopes including large-scale earthworks, dams, haul roads, tunneling, marine dredging, piling, structural concrete, steel erection, underground utilities, mechanical systems, and electrical installations under remote and operationally constrained environments.
• Supported pre-construction strategy and estimating efforts contributing to a 30%+ bid win rate across infrastructure and industrial pursuits exceeding $1B in aggregate value.
Neptune Terminal Expansion - North Vancouver (Key Project Highlight)
• Played a senior leadership role delivering a $340M construction scope within a major terminal expansion designed to nearly double export capacity at a live marine and rail facility.
• Executed works under extreme logistical constraints including live rail operations, confined work zones, and marine-side construction located tens of meters from the ocean.
• Managed deep excavation activities reaching approximately 60m below grade for critical vault structures under high groundwater pressure, implementing controlled sequencing and groundwater mitigation strategies.
• Achieved +4% margin uplift above original target while increasing final contract value by 27% over initial award through structured commercial governance and disciplined execution.
• Led administration and tracking of 300+ change events, implementing structured entitlement documentation and forecasting controls that improved financial predictability and negotiation outcomes.
• Coordinated installation of over 220, 000 meters of electrical cabling within an operating terminal while maintaining uninterrupted facility operations, including during COVID-19 restrictions.
- Company industry:
- Construction & Building