SEC COMBINED CYCLE POWER PLANTS PROJECT - PP14 (1980 MW)
Client : Saudi Electricity Company,
Consultant and client representative : WorelyParsons
Assigned as Civil Construction engineer in Power Generation Building, Transformers buildings, all the Pipe supports, Cable rack And Steam Turbine Generation (STG’s), electrical buildings, road works, and all the related finishing works responsible to Area construction manager where my responsibilities are included to the following:
-Manage and coordinate the inputs of project stakeholders to ensure the successful delivery of the project and Managing, monitoring and interpreting the contract design documents supplied by the client and Checks drawings, quantities and ensures that the calculations are accurate for the work.
-Manage and resolve site planning and coordination issues;
-Manage technical coordination meetings with subcontractors and project staff;
-Monitor project safety objectives, and implement the appropriate corrective actions where necessary in order to ensure that all relevant objectives are fulfilled
-coordinate the Project design and execution between Engineering, Architectural and Civil/Structural disciplines;
-Providing strategic planning advice in relation to the requirements for phasing of the works, the sequence of works and the necessary authority approval processes;
-Connecting the current Power Plant with a live operating power plant including all the construction activities such as pipe racks, duct banks, cable racks and steel structures with respect to all the risks and safety manners.
- constructing all the underground utilities for the plant including storm lines, lighting poles, duct banks, and paving ( concrete and asphlat ) ..... etc
- completing all the electrical operating buildings ( water treatment building, air compressor building, diesel generator building .... etc ) and the erection of the precast elements for the transformers .
Archirodon Construction Overseas, Ras-Alkhair - Saudi Arabia
Project : King Salman International complex for Maritime industries and services, 500M USD
Client : Saudi Aramco
Consultant and client representative : Parsons
project 2
Assigned as a senior civil engineer in the precast yard of Quay wall precast blocks ( Qty, 15500) and X- Blocks ( Qty 186000), responsible to the construction manager where my responsibilities are included to the following:
• Administration on the production operation and assurance that all work instructions and procedures are strictly followed
• controlling and monitoring the daily productivity for Xblocks and Quay wall precast blocks and make sure that the planned targets shall be achieved without any delay of production .
• Coordinate with Aramco PID “Project inspection department “and Aramco PMT “Project management team” for any site construction issues and production details.
• To ensure that workers are adequately skilled and experienced in following and understanding correct production methods
• To carry out trial mixes, maintain and update design mixes; and amend concrete batches due to fluctuation of moisture content mostly of raw materials
• Act positively, and participate in all health and safety issues at site, as required by the ARAMCO standards and specifications .
• preparing a daily/weekly/monthly report for the Construction S curves and resources allocation histogram .
- Company industry:
- Construction & Building
- Job role:
-
Engineering