Commissioning Engineer
Jacobs Engineering
Total years of experience :36 years, 4 Months
Jacobs Engineering, Marafiq Project STG-5 & 6 Yanbu, KSA, Thermal power plant 2 x 275 MW Commissioning Engineer February, 2013 To date
• Making improvements to and offering advice about operational procedures
• Providing technical support
• Ensuring safe working conditions
• Creating and carrying out test procedures
• Scheduling and coordinating work to tight deadlines
• Ensuring that equipment works to its specification
• Liaising with installation/project engineers
• Investigating problems, diagnosing/repairing faults
• Troubleshooting
• Writing reports and documentation
The Project consists of the following major equipments:
• Boiler 2 x 1000 ton (Doosan)
• Steam Turbine 2 x 275 MW (Doosan)
• Generator 2 x 345 MVA (Doosan)
• Distributed Control system (Yokogawa).
• 380 kV GIS
Saif Power Company Limited, 225 MW Combined Cycle Power Plant. (October 2009 to Date)
Job Title: Shift Engineer
Job Responsibilities: • Responsible for the smooth, reliable and efficient operation of the plant.
• Supervision of plant startup and shutdown activities
• Coordination with NPCC & RCC for commercial and switching
• Coordination with Plant Management and Maintenance Sections.
• Supervision of transient conditions and performs trouble shootings.
• High Voltage switching
• Preparation of equipments for safe maintenance.
• Execution of plant safety procedures like Lockout tagout, Confined space entry, Hot and cold work permits.
• Generation of Daily Operation Report
• Generation of Trip and Event reports
• Approval of work orders in Computerized Maintenance Management System (Maximo)
• Handled Major overhaul of two gas turbines and overall complex as outage coordinator.
• Participated in Quality, Environment and safety audits for IMS certification as auditor and auditee.
• Participated in the development and revision of operating procedures.
• Participated in plant commissioning, creating punch lists, pursue technical issues of commissioning.
The Unit consists of the following major equipments:
• Gas Turbine 6FA of 2 x 75 MW (GE)
• Steam Turbine of 75 MW (Siemens)
• HRSG 2 x 100 ton/h capacity (Hongzu)
• Generator 2 x 95 MVA (Elan)
• Generator 1 x 95 MVA (Siemens)
• Distributed Control system (ABB)
• Maximo Computerized Maintenance Management System
• 132 KV Switch Yard with SF6 Breakers
Shuaibah IWPP, 1200 MW and 36000 ton/h water, Steam power plant with MSF. (October, 2008 to October, 2009)
Job Title: Shift Supervisor
Job Responsibilities: • Responsible for the smooth, reliable and efficient operation of the plant.
• Supervision of plant startup and shutdown activities
• Coordination with LDC & SWCC for commercial and switching
• Supervision of transient conditions and performs trouble shootings.
• Preparation of equipments for safe maintenance.
• Execution of plant safety procedures like Lockout tagout, Confined space entry, Hot and cold work permits.
• Participated in plant commissioning, creating punch lists, pursue technical issues of commissioning.
The Unit consists of the following major equipments:
• Boiler of 3 x 2017 Tons/Hour capacity. (Ansaldo)
• Back Pressure Steam Turbine of 3 x 424 MW (Siemens)
• Generator 3 x 530 MVA (Siemens)
• MSF 12 x 3080 t/h (Doosan)
Saba Power Company, 134 MW Steam power plant. (April, 1999 to Oct, 2008)
Job Title: Shift Supervisor (Shift Incharge)
Job Responsibilities: • Responsible for the smooth, reliable and efficient operation of the plant.
• Supervision of plant startup and shutdown activities
• Coordination with Wapda for commercial and switching
• Supervision of transient conditions and performs trouble shootings.
• Preparation of equipments for safe maintenance.
• Execution of plant safety procedures like Lockout tagout, Confined space entry, Hot and cold work permits.
• Participated in plant commissioning, creating punch lists, pursue technical issues of commissioning.
The Unit consists of the following major equipments:
• Boiler of 450 Tons/Hour capacity. (BWII)
• Steam Turbine of 134 MW (Toshiba)
• Generator 170 MVA (Toshiba)
• Distributed Control system (Bailey infi 90)
• MP2 Computerized Maintenance Management System
• Auxiliary Boiler 23 tons/hour. (BWII)
• Demineralization Plant (ECODYNE)
• 132 KV Switch Yard with SF6 Breakers
• Cooling Tower (GEA)
• Electrostatic Precipitator.
Fauji Kabir Wala Power Company Limited, 157 MW Combined cycle power plant. (April, 1998 to March, 1999)
Job Title: Control Room Operator
Job Responsibilities: • Responsible for the smooth, reliable and efficient operation of the plant.
• Responsible of smooth startup and shutdown of the plant.
• Coordination with Wapda for commercial and switching
• Handling of transient conditions and performs trouble shootings.
• Preparation of punch lists.
• Monitoring and participation in plant commissioning activities.
• Participated in plant commissioning, creating punch lists, pursue technical issues of commissioning.
The Unit consists of the following major equipments:
• Low BTU Gas turbines 2 x 50 MW (Westinghouse)
• Steam Turbine of 57 MW (Westinghouse)
• Generator x 3 (Westinghouse)
• Zurn HRSG with Duct Burners
• Distributed Control system WDPF (Westinghouse)
• Demineralization Plant
• 132 KV Switch Yard with SF6 Breakers
• Cooling Tower
Liberty Power Complex, 212 MW Combined cycle power plant. (August, 1997 to April, 1998)
Job Responsibilities:
• Responsible for the smooth, reliable and efficient operation of the plant.
• Responsible of smooth startup and shutdown of the plant.
• Coordination with Wapda for commercial and switching
• Handling of transient conditions and performs trouble shootings.
• Preparation of punch lists.
• Monitoring and participation in pre commissioning activities.
The Unit consists of the following major equipments:
• Gas turbine (V94.2) 145 MW (Ansaldo)
• Steam Turbine of 70 MW (Ansaldo).
• Generator x 2
• HRSG
• Distributed Control system (Bailey Infi-90)
• Auxiliary Boiler
• Demineralization Plant
• 132 KV Switch Yard with SF6 Breakers
• Cooling Tower
• Clarifiers
• Black start Diesel Generators
• Maximo Computerized Maintenance Management System
Dubai Aluminum Company Power Complex, 1000 MW Combined cycle power plant. (Dec, 1995 to August, 1997)
Job Title: Power Operator
Job Responsibilities: • Responsible for the smooth, reliable and efficient operation of the plant.
• Responsible for smooth startup and shutdown of the units.
• Handling of transient conditions and performs trouble shootings.
• Preparation of equipments for safe maintenance.
• Monitoring and logging of process parameters.
The Complex consists of the following major equipments:
• 8 x Gas Turbine Frame-5 20 MW (GE)
• 5 x Gas Turbine Frame-9B 90 MW (GE)
• 1 x Combined cycle 125 MW (ABB)
• 2 x Gas Turbine Frame-9E (EGT)
• 13 x Waste Heat Boilers
• Rectifiers
• Mark-V / VI Control system
• Demineralization Plant
• Centrifugal Air Compressor
• Chiller Air dryers
• Cooling Tower
KANUPP, 134 MW Nuclear power plant. (February, 1988 to December 1995)
Job Title: Assistant Plant Operator
Job Responsibilities: • Responsible for field and control room operations for the smooth, reliable and efficient operation of the plant.
• Responsible for field and control room operations for smooth startup and shutdown of the plant.
• Coordination with KESC
• Handling of transient conditions and performs trouble shootings.
• Preparation of equipments for safe maintenance.
• Monitoring and logging of process parameters.
The Complex consists of the following major equipments:
• Reactor 433 MW Thermal (CANDU)
• Steam Turbine 134 MW (Hitachi)
• Heavy water recovery dryers
• Heavy water upgrading plant
• Demineralization Plant
• Reciprocating Air Compressors
• 132 KV Oil Circuit Breakers
B-Tech Hons Electronics with 1st division Preston University, Kohat (Registered with Saudi Council of Engineers)
DAE Electrical