Electrical Maintenance Manager
Aljazira Gas Power
Total years of experience :14 years, 2 Months
Team leader.
Work with the electrical team if needed.
Troubleshooting Turbomach T60 turbines and T130 (caterpillar).
Manage of the contractor during instruction new turbine.
Check and Inspect the material according to the contract.
Design and manage any electrical installation in the Plant.
Supervise all electrical team during erection new turbines.
Associate member during commissioning switchgear 33KV.
Associate member during commissioning T60 and Titan130 turbines.
Responsible to maintain all electrical equipment and auxiliary(transformers, black start, switchgear, etc) to insure smooth and maximum operation to the plant.
Monitor and manage the spare parts, consumables inventory and
maintain the stock level.
Maintenance Turbomach Gas Turbines(T60) with team members.
Associate member with solar people during troubleshooting, maintenance rental power Caterpillar turbines
Installing termination kit for power cable 11 and 33 KV.
Insulation and high pressure test for cable 11 and 33 KV
Installing motor control and power circuit MCC
Insulation Test for transformers, ratio test, and oil insulation test .
Routine start for black start generators to insure their condition .
Routine operation of separation system cleaning the diesel.
Troubleshooting and fixing all electrical problems in the plant.
I had to make plan for teaching courses during the semester.
I had to review the main points of the previous subject after that
I had to deliver an idea of a new subject to about 50 students during
two hours.
I had to control about 50 students at the same time.
I had to recognize each student individually to know how to deal with that
students.
التقدير العام #جيد# ----حصلت على الترتيب الثالث على الدفعة