Maruf Hasan, Senior Electrical Manager

Maruf Hasan

Senior Electrical Manager

Premier Group of Companies Ltd.

Location
Bangladesh - Dhaka
Education
Master's degree, Electrical Engineering
Experience
16 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 4 Months

Senior Electrical Manager at Premier Group of Companies Ltd.
  • Bangladesh - Dhaka
  • My current job since August 2021

Serve as a Senior Electrical Manager in Premier Group of Companies Ltd at Hilton Hotel Project, Gulshan-2, 36-stored iconic Five star Hotel with 06 basements. Supervise all kinds of Electrical Erection, Instillation and Commissioning, Electrical wiring for multistory construction and industrial equipments instillation and fittings, There are good ideas for MEP work, Earthing system for all residential equipments, Check proper Load distribution, Place finalize for Main Distribution Board MDB with RCD, RCCB.11KV/400V 4MVA, 1500KVA Combined heat and power (CHP)Generator, SubStation In HV And LV Panel with VCB, ACB And MCCB, Heating, ventilation and air conditioning (HVAC) engineers install and service air quality and temperature systems in homes, HT& LT Switchgears, PFI Plant, BBT, Lightning Arrestor, Automatic Circuit Recloser, Recloser Bypass Switch, Disconnect Switch, Load Break. There are several routes of becoming a heating, ventilation and air conditioning (HVAC)Instrumentation Systems, FPS, FDS and PA system, Lightning protection system (LPS), Handling PLC Programming Trouble shooting whenever required. Machine Preventive Make sure that all the line equipment is operational and proper preventive maintenance has been taken as per plan. Predictive Maintenance Identify predictive maintenance requirement for the equipment component discussing with supervisor or line manager.Breakdown Maintenance Maintain & troubleshoot any sudden breakdown on line equipment during production in minimum possible time frame. giving importance to quality of product produced and adhering to all applicable standard.Maintain and Troubleshoot all Motor Drive controllers Frequency controller.Inspect and maintain of all types of drive motors, Sensors, Limit switches, Encoders, machine safety system used in beverage filling lines.Preventive, Predicative Maintenance and Trouble shooting in Filling equipment, like latest technology high speed blow molding machines, filling equipment, .Manage contractors subcontractors and other staff and allocate responsibilities. Evaluate progress and prepare detailed reports Ensure adherence to all health and safety standards and report issues. power sub Prepare report like downtime notification, breakdown report and work order confirmation etc. *Project- Renaissance Hotel, Hilton Hotel

Plant Planning Engineer Electrical at HANWHA ENGINEERING & CONSTRUCTION CORPORATION LTD
  • Iraq - Baghdad
  • April 2017 to July 2021

Served as a Plant Planning Engineer Electrical in HANWHA ENGINEERING & CONSTRUCTION CORPORATION LTD, BISMAYAH 100, 000 UNIT HOUSING NEWCITY PROJECT at Bismayah New City Project, Baghdad, Iraq.Responsibility Supervise all kinds of Electrical Erection, Instillation and Commissioning, Electrical wiring for multistory construction and industrial equipments instillation and fittings, There are good ideas for MEP work, Earthing system for all residential equipments, Check proper Load distribution, Place finalize for Main Distribution Board MDB with RCD, RCCB. Programming & installation most branded PLC, VFD, VSD and RF System. Beckhoff Ethernet control system and SCADASupervisory control and Data Acquisition.Quiet Familiar with All kinds of Motor controls such as Star Delta Starter, ReverseForward Starter DOL Starter, Proximity Sensor, Photo Sensor, Limit Sensor, Heat detect Sensor, and Metal Sensor. Monitoring 60MW H.F.O(Heavy Fuel Oil) Power Plant, 33KV11KV SubStation, 11KV400V10MVA SubStation In HV And LV Panel with VCB, ACB And MCCB, Operating and Maintenance Elematic Precast Concrete Technology, Insulation Plant, Sandwich Wall Plant, Battery Wall plant, Hollow Core Plant, Cement Silo Plant, Batching Plant, AAC Plant, PHC Pile Plant, Mortal Plant, PVC Plant, Block Making Plant, Asphalt Plant. Machines such as A.W.MAutomatic Wire Machine, Concrete Mixer Machine, Shuttle, Comcaster, Vibrating Station, Curing Chamber, Lifting Device, Overhead Gantry, Cutting Machine, Heating plant, Stressing Machine, Ball Mill, Finger Car, Packing Machine, Generator 2500KVA, Central Vacuum Cleaning System, Air Compressor System, Chiller990KW, Boiler Heating Plant 3000kghr, HKTCO.H Crane 8 TON, 10TON, & 20TON, BANDOJib Crane 500KG&250KG. Insure that all works in plants according to NICNational Investment Commission quality & safety plans by QAQC HSE department .I prepare daily work report, monthly report, data collecting, Materials Inventory and Materials Requisition, and utilize Assistant Engineers, Supervisors And Foreman.

Electrical Engineer at BSM Group
  • Bangladesh - Dhaka
  • January 2013 to March 2017

Supervise for electrical wiring instillation, and fitings, Proper installation for all kind of electrical equipments, There are good ideas for MEP work, Responsible for Maintenance and Servicing of Electro- Mechanical equipment (Electrical Sub-station, Generator, Lifts, Electric Distribution systems, Place finalize for Main Distribution Board MDB with RCD, RCCB.11KV/400V 6MVA SubStation In HV And LV Panel with VCB, ACB And MCCB, Heating, ventilation and air conditioning (HVAC) engineers install and service air quality and temperature systems in homes, HT& LT Switchgears, PFI Plant, BBT, Lightning Arrestor, Automatic Circuit Recloser, Recloser Bypass Switch, Disconnect Switch, Load Break. There are several routes of becoming a heating, ventilation and air conditioning (HVAC)Instrumentation Systems, Lightning protection system (LPS), Power supply to Medical equipment, pumps, Fire Fighting system, ETP Plant, Water treatment Plant etc).Capable to prepare electrical design & drawing for electrical installation relevant works for hospital building.Ensure supervise the all electrical work review check and Control.Coordination of architectural, Civil & electro-mechanical construction & installation works.Coordinate with Foreign and Local suppliers, checking quotations, specifications, compatibility, quality and price of materials and equipment for the construction of Hospital Building and Project building.Responsible to Manage Periodic Maintenance, troubleshooting, install, adjust or provide technical support to Electro mechanical & medical equipment and related electrical utilities.Execute the spare requirement & replacement tasks and keeping operational record and costs.Plan & Organize, Co-ordinate and execute all electrical and electronic engineering activities.BREvaluate the safety and effectiveness of all electrical equipments.Specializing in PLC and PC-based Control Systems, PLC programming & installation, repair services for most branded PLC & Inverters. all kinds of Electrical Installation, Electrical planning and Estimation, Electrical industrial wiring All work done as per Bangladesh Power Development Board (BPDB),

Electrical Engineer at Al Murooj Corner Gen. Contracting L.L.C
  • United Arab Emirates - Abu Dhabi
  • April 2010 to December 2012

Responsible for all Electrical such as Transformers, Medium and Low tension, Place finalize for Main Distribution Board MDB with RCD, RCCB.33KV11KV SubStation, 11KV400V 20MVA SubStation In HV And LV Panel with VCB, ACB And MCCB, Heating, ventilation and air conditioning (HVAC) engineers install and service air quality and temperature systems in homes, HT& LT Switchgears, PFI Plant, BBT, Lightning Arrestor, Automatic Circuit Recloser, Recloser Bypass Switch, Disconnect Switch, Load Break. There are several routes of becoming a heating, ventilation and air conditioning (HVAC)Instrumentation Systems, Supervising Mechanical / Electrical / Architectural jobs based on shop drawings and specificationsPreparing weekly and monthly progress reports and assess them against the project schedule.Ensuring the availability of adequate quantity of electrical material Responsible for Interior Implementation work.Conducting safety tool box lecture to enforce safety regulations for individuals on the siteRaising inspection requests for work completed Ensuring work is executed according to contract specifications, approved design drawings, agreed procedures, and method statementsImplementing strict adherence to safety rules and regulations Reducing the wastage of material and increase manpower productivityInteracting with client and consultant regarding the status of work Completing necessary quality assurance documentation of work under direct control Negotiating with client and consultant for obtaining approvals for requested modifications Updating drawings to fit newly approved modifications for As-Built drawings Checking all installations in preliminary stageEffectively control the utilities consumption to achieve the required savings.Responsible for keeping track of consumables provided for serving preventative and corrective maintenance, with the objective of maintaining costs within budget as well as ensuring that there is no stock out situation at any point of time which can lead to inconvenience for the visitors.Prepare routine and ad-hoc reports, with the objective of keeping the Project Manager informed about all issues relating to MEP activities and taking necessary action thereof as per guidance of the Project Manager.Implement an effective roaster for MEP team to cover the Project operations 24/7. Implement company health, safety and environment policy.Supervise electrical wiring for multi-story construction and industrial instillation, equipment and fittings, Proper installation for all kind of electrical equipments, design, develop, and test electrical devices and equipment, including communications systems, power generators, motors and navigation systems, and electrical systems for automobiles and aircraft. They also oversee the manufacture of these devices, systems, and equipment.Supervise of earthing system for all residential equipments, There are good ideas for MEP work, Check proper Load distribution, Place finalize for Main Distribution Board (MDB), All work done as per ADWEA (Abu Dhabi Water & Electricity Authority) ruls and regulation.

Project Coordinator at GEANT SAUDI LTD
  • Saudi Arabia - Riyadh
  • July 2006 to September 2008

Here I had supervised all kinds of Electrical Installation, Electrical planning and Estimation, Electrical industrial wiring, There are good ideas for MEP work, Check proper Load distribution, SubStation In HV And LV Panel with VCB, ACB And MCCB, Heating, ventilation and air conditioning (HVAC) engineers install and service air quality and temperature systems in homes, HT& LT Switchgears, PFI Plant, operating BMS, PAS, 2000 KVA Generator, (Different of Hotel Hyper and super markets)Ensure national & international codes during the installation of the electrical system.Modification and correction of electrical design and Bill of Quantity (BOQ).Capable of fault findings and installation of electrical equipment.Capable of making understanding electrical diagrams.Organize, plan, and manage all contractors and vendors to ensure execution of works as per approved design and drawings and also ensure the quality of works as per the technical specifications.Understand & supervision of electrical works, power generation and distribution, grounding, lighting system, CCTV, access control, car parking, under vehicle scanning system, and BMS.Keep constant liaison and attend meetings with management, contractors, clients, architects, team members, and other stakeholders.Make advance plans, supervise daily work progress, and take necessary actions to maintain the project`s work schedule.Practice and ensure health, safety, and environment (HSE) management system.Carry out any other job assigned by the management. 1.Nakheel Plaza, 2.Khurais Plaza, 3.Salam Mall 4. Hilton Hotel

Education

Master's degree, Electrical Engineering
  • at American International University Bangladesh(AIUB)
  • November 2023

*I passed AADC ( Al Ain Distribution Company ) Competence Test . *Completed Basic First Aid & Fire Fighting Training from Emirates Technical & Safety Development Centre. *Post graduate diploma in project management

Bachelor's degree, Electrical And Electronics Engineering
  • at Uttara University (UU)
  • July 2016
Diploma, Electrical Engineering
  • at Dhaka Polytechnic Institute
  • May 2006
High school or equivalent, Science
  • at Haider Ali High School and college
  • February 2001

Specialties & Skills

Languages

English
Expert
Arabic
Native Speaker
Hindi
Native Speaker
Urdu
Native Speaker

Training and Certifications

postgraduate diploma in project management (Certificate)
Date Attended:
January 2024