Ali Raad, Construction Project Manager

Ali Raad

Construction Project Manager

CIVI LAND CO. FOR PETROLEUM SERVICES & GENERAL TRANSPORT LTD

Location
Iraq - Basra
Education
Master's degree, Civil Engineering
Experience
13 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 6 Months

Construction Project Manager at CIVI LAND CO. FOR PETROLEUM SERVICES & GENERAL TRANSPORT LTD
  • Iraq - Basra
  • My current job since June 2023

I employed as a project manager for FRAMEWORK AGREEMENT FOR PROVISION OF INFRASTRUCTURE REHABS AND BUILDING SERVICES
The scope of work:
• The scope of work covers the engineering design of the North Rumaila ST 350 NR NGL Upgrade Phase-1 project involves the construction of five new facilities at phase-1 area. These facilities include a Fire Station Building, Steel
Shed for four trucks, NR NGL Workshop, CS Workshop, Security Building with GRB tank and water facilities, Transformer & road. These new facilities will be strategically located on the site,
• The Fire Station Building, with an area of 14m width and 34m length, will provide ample space to house fire trucks, firefighting equipment, and the personnel required to respond to emergency situations.
• The Steel Shed for four trucks, with an area of 12m width and 24m length, will provide additional space for the storage and maintenance of vehicles and equipment.
• The NR NGL Workshop, with an area of 25m width and 80m length, will provide
space for the maintenance, repair, and overhaul of equipment used in the extraction and processing of natural gas liquids.
• The CS Workshop, with an area of 20.5m width and 78.5m length, will provide space
for the maintenance and repair of equipment used in the compression and storage of natural gas.
• The Security Building, with an area of 3m width and 16m length as temporary for
ph1, will provide space for security personnel and equipment.
• General site layout: - include the Above workshops, Roads parks, green zones, Electrical & Telcom cables routs, Lighting & CC tv systems, Portable water& sewage &
Rain water draining systems

Construction Project Manager at ETLALAT AL-HADHARA Company
  • Iraq - Basra
  • January 2023 to June 2023

I employed as a project manager for OT3 (DS6) temporary construction facilities work.
The scope of work:
1- TCF site preparation (Site grading, Roads)
2- Security facilities (Chain link fence and gates, Ditch & embankment wall, Watch towers, T-Wall)
3- Office facilities (OT3 Office)
4- Public facilities (Guard rooms, Laundry $ toilets, Parking area, Utilities)
5- Shelters (Generator shelter, Water pump shelters, Diesel tanks shelter)

Construction Project Manager at MIDADOIL Company
  • Iraq - Basra
  • September 2021 to December 2022

EPC (Engineering, Procurement, Construct) Project Called PROVISION OF EPC OF WAREHOUSE IN B9 CAMP AREA. The scope of work for this project
1. Steel Structure Offices for 16 staff personnel with 2 office pools, 2 single rooms for managers, toilet, conference room with video sets as projector, UPS
& TEL room, prayer room, rest room and all furniture’s as required
2. Two (2) independent warehouses Warehouse 1: 30m×49m×6.6m, two gates with truck accessible, concrete floor for over loading floor). Warehouse 2: 30m× 49m×6.6m, two gates with truck accessible, concrete floor for over loading floor), standard storage rack installed; inside of this warehouse, with
3. One (1) semi-open storage shed for bulk material (42m×21m×6.6m)
4. Guard room with toilet (Steel Structure)
5. Smoking shed Yard: 176m×115m compacted yard for storage of casing and tubing, suitable for heavy truck movement, 180 pcs of reinforced concrete
sleeper with dunnage and wedge for supporting casing, tubing, line pipe etc.
6. 30m×50m concrete floor yard for special materials with galvanized wire chain link fence & gate;
7. Parking yard: suitable for 12 trucks and 8 cars parking.
8. General requirement: water supply and drainage, fire-fighting system, storm water drain ditch, outdoor light for night operation; earthing & lightning;
Telecom systems (LAN, Fire Alarm, CCTV system), HVAC; asphalt road (6m width) suitable for operation
9. Helipad 40m x 40m with necessary access road
10. Backfill and grading work, Ditch and Berm around Warehouse
11. Jogging track with light along the road.
12. One (1) smoking shed in the safe location
13. Turnstile door with access control system

Construction Project Manager at Tech- Iraq company
  • Iraq - Al Amarah
  • September 2020 to September 2021

EPC (Engineering, Procurement, Construct) Project Called Helipad Construction Project. To construct 4 heliports, the first 2 one in the work base of CNOOC company and the second 2 in M.O.C (Missan Oil Field) the
scope include: -
• Provides standards for the design of heliports serving helicopters with single rotors (Airbus' H145). Touchdown and Liftoff area (TLOF), Final Approach and Take Off (FATO) to be designed by both American codes ICAW &FAA.
• Engineering for (Sight layout, Helipad Areas, Roads with 1.5 km, lighting system for road, lighting system for helipad areas according to codes ICAW and FAA., constriction design, joint design)
• Procurement Process with Dutch company Q-Aviation company to provide special equipment for helipad like HAPI Heliport Approach
Path Indicators, Flush Inset, Flood lights, Landing direction lights.
• Execution the project in accordance with the QA/QC, HSE procedures and make the project primary cost & duration study with estimated
the resource and expenses to be as a Base Line to the project by using
the excel and primavera programs

Planning Engineer & deputy manager at ALBAB - company
  • Iraq - Al Amarah
  • July 2019 to September 2020

EPC (Engineering, Procurement, Construct) Project Called ESP POWER CONNECTION PHASE III. To construct more than 50 electrical routes 33 OHTL double and singles circuit electrical towers to well sites to supply power to for ESP, the scope of work
include: - Site survey, Routes Design, Material selection & supply, construction, test
, commissioning, start up.
As Planner I worked the following: -
• Make the project primary cost & duration study with estimated the resource and expenses to be as a Base Line to the project by using the excel and primavera programs
• Make the P.M.S (project management system) that a program done in excel which is used for controlling (project planning and project control) and
showing the following
- The work breakdown structure WPS and the weight for every step
- The main and sub activities for every item with the weight foe every constructed steps
- The start and the finish date for every activity
- Comparing the planed and actual progress
- Drawing the s curve for the project.
• Tracing the cost control and the budget control
• Creating, updating and reporting schedules
• Manage all the administration procedures and communication with the client (the Chinese side with CNOOC company) as well as all the invoices, change orders, weekly & monthly reports, and held the weekly presentation to comparing the actual with planed progress by using excel, outlook, PowerPoint, Iraqi, Chinese Civil Enterprise Law
• Make the ETR (equipment tracing report) that a program done in excel which is used for controlling the procurement process form the
purchasing order till arrival to site and comparing with actual time. this process includes the manufacturing, shipping, arrive to port, costume clearance, inland transport, arrive to site and the weight of every step comparing with the actual. Schedule and plan a construction plan with PRIMAVERA project software to keep the project on the track, control it and deliver it before the dead line.as well as the cost control

Construction Project Manager at NAT ASSISTANCE, |American company
  • Iraq - Al Kut
  • September 2017 to July 2019

EPC (Engineering, Procurement, Construct) infrastructure project Called Development and Rehabilitation of ALMUHANSESEEN D.C
Rehabilitation and development project contain sewages networks, potable water network, telecon network, underground electrical cables, and pavement with asphalt and concrete and sidewalks and all.
• Manage the design of sewage and drain water networks and all infrastructure work for above local roads using the AUTOCAD and excel programs
• Manage the design of Po. water networks and all infrastructure work for above local roads using the AUTOCAD and excel programs
• Manage all the administration procedures and communication with
client, the invoices, change orders, and all work requirement in accordance with Iraqi, Civil Enterprise Law
• Manage the project execution of all items, which contain from
execution of the above networks.

Construction Project Manager at Tech- Iraq company
  • Iraq - Al Amarah
  • January 2019 to July 2019

1. EPC (Engineering, Procurement, Construct) Project Called PARKING SHEDS, PUMP ROOM, SECURITY LIGHTING SYSTEM CONSTRUCTION.
The scope of work is
• Parking Shed Construction in Work base
(EPC (Engineering, Procurement, Construct)
• Additional Pump Room for ALMUSHARAH Pump Station
(EPC (Engineering, Procurement, Construct) for steel structure, sandwich panel, concrete work, mechanical & piping work
• Security Lighting System in BUT
Contain site formation, concrete foundation of towers, exploration of cables or pipes, installation, test, etc.

2. Unit Rate project called (Work Over Well Pads Construction the Fourth Batch)
The scope of work is
Estimated 33 work over well pads need to prepared with unit price contract. The work should be completed within 45 days after receiving the service order issued by company

lab manager at UKM UNIVERSITY
  • Malaysia - Shah Alam
  • May 2014 to May 2017
Construction Manager at DIRECTORATE OF MUNICIPALITY AL – KUT |ALKUT SUBURBS COMPANY
  • Iraq - Al Kut
  • April 2013 to April 2014

I employed as a Construction Manager in rehabilitation & development of two district in ALKUT city called AL-HOORA & AL SALLAM
• Manage the geometric design of 110 local road with all its profiles and quantities by civil 3d program with excel
• Manage the design of pavement layers (Rigid Pavement) by using AASTOO METHOD in design of pavement layers.
• Manage the design of 5 car parking area with its parking sheds and landscapes areas by using the AutoCAD and manual design parking
• Manage all the administration procedures and communication with the client as well as all the invoices, change orders, weekly & monthly reports, and held the weekly presentation to comparing the actual with planed progress by using excel, outlook, PowerPoint, Iraqi Civil Enterprise Law
• Supervise all the project items starting with the infrastructure work of sewage networks and portable water network, communication network
• Schedule and plan a construction plan with PRIMAVERA project software to keep the project on the track, control it and deliver it before the dead line.
• Mobilizing the project requirement resources with 4 civil engineer, 5 surveyors, and local staff of 50 employees with 6 sub-contractors by using the excel program.

Construction Manager at DIRECTORATE OF MUNICIPALITY AL –KUT |YANABEE DUBAE COMPANY /
  • Iraq - Al Kut
  • January 2012 to March 2013

I employed as a Construction Manager in rehabilitation & development of two district in ALKUT city called AL-HAIDAREA & DOOR ALMUALEMEEN
• Manage the geometric design of 90 local road with all its profiles and quantities by civil 3d program with excel
• Manage the design of sewage & PO. Water networks and all infrastructure work for above local roads using the AUTOCAD and excel programs
• Manage the design of pavement layers (Rigid Pavement) by using AASTOO METHOD in design of pavement layers.
• Manage all the administration procedures and communication with the client as well as all the invoices, change orders, weekly & monthly reports, and held the weekly presentation to comparing the actual with planed progress by using excel, outlook, PowerPoint, Iraqi Civil Enterprise Law

• Supervise all the project items starting with the infrastructure work of sewage networks and portable water network, communication network
• Finishing work like the subbase layers - concrete layers - asphalt layer-sidewalk finishing.
• Schedule and plan a construction plan with MS project software to keep the project on the track, control it and deliver it before the dead line.
• mobilizing the project requirement resources with 3 civil engineer, 5 surveyors, and local staff of 58 employees with 4 sub-contractors.
• Supervising on the closing the project before dead line 365 Days only.

Civil Site Engineer at Ministry of Construction, Housing, Municipalities and Public Works
  • Iraq - Al Kut
  • January 2011 to January 2012

• I employed in resident engineer office to supervisor on cumulative housing
project in wassit. it’s contained about 504 flats unit
• Manage the weekly & monthly reports as well as the invoices of this project
• Manage the Quantities change orders and monitor it.
• Follow up the daily progress comparing with the planned one.

Civil Site Engineer at Wassit University
  • Iraq - Al Kut
  • September 2010 to September 2011

I employed as a site Engineer for finishing work in construct on 50 houses for the staff of Wassit

Education

Master's degree, Civil Engineering
  • at National University Of Malaysia
  • June 2017
Bachelor's degree, Civil Engineering
  • at University Of Baghdad
  • April 2010

Specialties & Skills

Construction Project Management
Construction Management
Construction Design
Civil Engineering
Oil and Gas
design engineering
engineering management

Languages

English
Expert

Memberships

Iraqi Engineers Union
  • Iraqi Engineers Union
  • June 2010

Training and Certifications

PMP (Training)
Training Institute:
MAPLE
Date Attended:
September 2014
Duration:
35 hours

Hobbies

  • Reading
    Engineering books , historical books