مجموع سنوات الخبرة: 18 سنوات, 0 أشهر
ديسمبر 2020
إلى حتى الآن
Developer
في PANKINGDOM REAL ESTATE
مارس 2006
إلى حتى الآن
senior mechanical engineer
في PANKINGDOM REAL ESTATE
البلد :
المملكة العربية السعودية - المدينه المنوره
أغسطس 2017
إلى أغسطس 2019
MEP Project Manager
في HASSANESCO Company
البلد :
قطر
Related Project:
• MOI New Police College Complex
Duties and Responsibilities:
• Estimate scope of MEP trades during pre-construction.
• Review Contract Documents, making suggestions/modifications as they relate to the
MEP trades.
• Manage and lead MEP subcontractors throughout duration of the project.
• Review and approve material and equipment for MEP systems prior to installation.
• Monitor the installation and start-up of MEP systems and commissioning of project
with Engineer & Owner.
• Attend site progress, technical, management and any related meetings.
• Coordinate activities, materials procurement and other related activities with Field
Staff
• MOI New Police College Complex
Duties and Responsibilities:
• Estimate scope of MEP trades during pre-construction.
• Review Contract Documents, making suggestions/modifications as they relate to the
MEP trades.
• Manage and lead MEP subcontractors throughout duration of the project.
• Review and approve material and equipment for MEP systems prior to installation.
• Monitor the installation and start-up of MEP systems and commissioning of project
with Engineer & Owner.
• Attend site progress, technical, management and any related meetings.
• Coordinate activities, materials procurement and other related activities with Field
Staff
مارس 2015
إلى يونيو 2017
Senior Mechanical Engineer
في ELECTRO WATT Company
Mechanical Systems (HVAC, Plumbing and
FF)
Related Project:
▪ Marina Com5 Tower (Office Building (3B+G+2P+25 Floors)) at Lusail City.
Duties and Responsibilities:
• Review Project Specs, BOQ, IFC drawings and Authorities approval.
• Raising RFI’S for any conflict’s and doubts.
• Review Material submittals, Shop drawings, Coordination drawings and Method
statements.
• Oversee a junior mechanical engineers.
• Advise the project manager of any technical aspects of the mechanical services that may
affect construction progress, quality and the like.
• Attend a site progress and technical meetings as directed by the project manager.
• Preparing take off for materials based on approved material submittals and shop drawing.
• Preparing Orders for materials and following up with suppliers for the deliveries.
• Following up site progress as per base line program.
• Preparing variation orders for any additional works
FF)
Related Project:
▪ Marina Com5 Tower (Office Building (3B+G+2P+25 Floors)) at Lusail City.
Duties and Responsibilities:
• Review Project Specs, BOQ, IFC drawings and Authorities approval.
• Raising RFI’S for any conflict’s and doubts.
• Review Material submittals, Shop drawings, Coordination drawings and Method
statements.
• Oversee a junior mechanical engineers.
• Advise the project manager of any technical aspects of the mechanical services that may
affect construction progress, quality and the like.
• Attend a site progress and technical meetings as directed by the project manager.
• Preparing take off for materials based on approved material submittals and shop drawing.
• Preparing Orders for materials and following up with suppliers for the deliveries.
• Following up site progress as per base line program.
• Preparing variation orders for any additional works
فبراير 2012
إلى فبراير 2015
Project Mechanical Engineer
في Megatec Contracting Company
Mechanical Systems (HVAC, Plumbing and FF)
Related Projects:
▪ VIVA BAHRIA Towers (3, 4, 5)( residential buildings(2B+G+20 Floors)) at Pearl Qatar.
▪ MARWA Tower (Office building (2B+G+20 Floors)) at Al saad Area.
Duties and Responsibilities:
• Review Material submittals, Shop drawings, Coordination drawings and Method
statements.
• Preparing take off for materials based on approved material submittals and shop drawing.
• Following up the work on site as per approved Coordination and shop drawing.
• Following up for all Material and work inspection request.
• Attend meetings which related to site progress.
• Following up with suppliers for delivery of materials on time
Related Projects:
▪ VIVA BAHRIA Towers (3, 4, 5)( residential buildings(2B+G+20 Floors)) at Pearl Qatar.
▪ MARWA Tower (Office building (2B+G+20 Floors)) at Al saad Area.
Duties and Responsibilities:
• Review Material submittals, Shop drawings, Coordination drawings and Method
statements.
• Preparing take off for materials based on approved material submittals and shop drawing.
• Following up the work on site as per approved Coordination and shop drawing.
• Following up for all Material and work inspection request.
• Attend meetings which related to site progress.
• Following up with suppliers for delivery of materials on time
نوفمبر 2008
إلى يناير 2012
في Rabat Contracting Company
مايو 2008
إلى نوفمبر 2008
Technical Office Engineer
Mechanical Systems (HVAC, Plumbing and FF)
Scope of work:
▪ Preview of Design.
▪ Calculate any Calculations Required ( such as load calculation, head of pump and static
pressure for fans…etc)
▪ Estimation for equipment’s and materials.
▪ Make Deals with Suppliers.
▪ Make shop drawing, coordinating drawing and as-built drawing.
▪ Make Invoices.
Related Projects:
▪ Medina Central at Pearl Qatar
▪ HKT (office building).
▪ MKT (office building).
▪ QIB Hotel.
▪ Mounira Complex.
▪ Kaldary Building.
▪ Al-ain Hotel.
▪ Almagrabi Hospital., and tender projects.
➢ Design &Project management Engineering Company (DPME)
Scope of work:
▪ Preview of Design.
▪ Calculate any Calculations Required ( such as load calculation, head of pump and static
pressure for fans…etc)
▪ Estimation for equipment’s and materials.
▪ Make Deals with Suppliers.
▪ Make shop drawing, coordinating drawing and as-built drawing.
▪ Make Invoices.
Related Projects:
▪ Medina Central at Pearl Qatar
▪ HKT (office building).
▪ MKT (office building).
▪ QIB Hotel.
▪ Mounira Complex.
▪ Kaldary Building.
▪ Al-ain Hotel.
▪ Almagrabi Hospital., and tender projects.
➢ Design &Project management Engineering Company (DPME)
نوفمبر 2006
إلى مايو 2008
design engineer
في Sheraton Heliopolis Hotel
for HVAC systems, and using programs for calculations as:
▪ HAP 4.2 for load estimation.
▪ Duct sizing.
▪ Piping sizing, and working a shop drawing.
Related Projects:
▪ CIB Bank (Egypt) (design).
▪ Movmpick Hotel (QATAR) (HAP calculations).
➢ TAB Company (Testing & Balancing
▪ HAP 4.2 for load estimation.
▪ Duct sizing.
▪ Piping sizing, and working a shop drawing.
Related Projects:
▪ CIB Bank (Egypt) (design).
▪ Movmpick Hotel (QATAR) (HAP calculations).
➢ TAB Company (Testing & Balancing
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني