Halil Goksu, Free Lance

Halil Goksu

Free Lance

ARS Progetty Consortium. Lattanzio Advisory S.p.A.

البلد
تركيا - أنقرة
التعليم
ماجستير, Soil Mechanics MS. in Civil Engineering.
الخبرات
42 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :42 years, 10 أشهر

Free Lance في ARS Progetty Consortium. Lattanzio Advisory S.p.A.
  • إيطاليا
  • مارس 2016 إلى أكتوبر 2016

“Technical Assistance for Strengthening the Institutional Capacity of the National Authorising Officer (NAO) Office in Turkey in Performing its Tasks on the Implementation of Instrument for Pre-Accession (IPA)”. It is an European Union Project to help Turkey. Some ongoing Works Projects which are partially financed by the European Reunion are visited and reports are prepared regarding their implementation.

Project Manager في FRAMACO - EPIK JV - Hired by EPIK
  • العراق - بغداد
  • فبراير 2013 إلى يوليو 2013

Construction of an OBO Building in Baghdad inside the Green Zone on the American Embassy grounds. It is a 8, 00 mi. USD Contract: SAQMMA: 12-F-4826: A very high standard and unusually sophisticated type of work

Site Manager of the construction on site of the Joint Venture في Hochtief+HGG+Sachsen Wasser JV / Hired by HGG
  • تركيا - أرضروم
  • أكتوبر 2012 إلى فبراير 2013

Site Manager of the construction on site of the Joint Venture:
Project is the construction of Waste Water Treatment Plant and Wastewater Collectors including Creek Rehabilitation in Erzurum Greater Municipality. EuropeAid/129943/D/WKS/TR. It is a 28 million Euro Project financed by the European Union. Job is EPC type on the Contractor’s side.

Construction Manager في OBERMEYER Planen+Beraten GmbH
  • أذربيجان
  • سبتمبر 2011 إلى يوليو 2012

Project consists of construction of the Baku Chrystal Hall for the European Song Contest, Azerbaijan. Especially he supervised the erection of highly sophisticated 3D steel frames on the Consultant’s side. This was a very high quality fast track job.

Project Coordinator في METAG Construction Co. - Head Office
  • تركيا - أنقرة
  • مايو 2010 إلى أبريل 2011

He designed and implemented a Monthly Reporting System / Cost Control System; conform to PMP rules for the General Manager to follow-up regarding the forty (40) ongoing projects in Afghanistan worth a total of 600 million USD. Timing and severity of radical corporate decisions on running Projects were based on this unique Reporting System.
This reporting compares cost and income of ongoing projects with respect to early and late start of the project schedules, and advises in advance on possible malfunctioning of these projects. He used a cost control system based on the initial tender documents continuously revised by the site reports, payment certificates and up to date bill of quantities remaining. Systematic risk identification and mitigation were used.
He organized monthly planning sessions with the site people using conference calls.
He did special in-depth analyses of onsite critical technical issues for resolution especially regarding the high quality special purpose massive concrete: etc. airplane aprons.
Projects in Afghanistan usually are awarded by USACE. Rules were similar to FIDIC.
Airplane strips, airplane aprons, military type buildings, steel hangars, massive concrete, potable water, sewage, storm water, electrical and electronic equipment. All are EPC type of construction on the Contractor’s side.

Project Coordinator في AYDENIZ Construction Co. - Head Office
  • تركيا - أنقرة
  • مايو 2007 إلى فبراير 2010

He coordinated the Planning Department with a focus on overall Project Management of ongoing projects. He provided assistance on business development and tendering issues. He devised a cost control system based on the initial tender documents continuously revised by the site reports showing remaining work to be done.
Projects mostly are located in Afghanistan and awarded by the US Department of Defense, USACE and NAMSA (NATO). Rules were similar to FIDIC.
Airplane strips, airplane aprons, military type buildings, steel hangars, massive concrete, potable water, sewage, storm water, electrical and electronic equipment. All are EPC type of construction on the contractor’s side.

Project Manager, based in Algiers في EVREN Co. Inc
  • تركيا - اسطنبول
  • مايو 2006 إلى أبريل 2007

Taksept-Tizou Ouzou-Alger” Water Supply Project in Algeria. The $30 million water supply subcontract consisted of the detailed design and construction of reinforced concrete reservoirs (2x60.000m3) and concrete structures on the water pipeline (2x2000mm diameter). The Client was the General Contractor SNC Lavalin of Canada. FIDIC Rules. He organized to produce the detailed design in Algeria. He acted as the Project Manager vested by the required powers and managed the entire Project. Manpower reached 600 direct and indirect expatriate personnel during peak period.

Technical Office Manager (Acting Project Manager) في IMA-AGE JV. Water Supply and Distribution Project of Sanlıurfa
  • تركيا - أنقرة
  • مايو 2005 إلى فبراير 2006

Water Supply and Distribution Project of the city of Sanliurfa/TURKEY
The Project ($30 million) consisted of detailed design and construction of water supply pipes, main distribution network, pumping stations and storage reservoirs for the city of Sanliurfa in Turkey. The Client was the European Union. FIDIC Rules. He managed the routine meetings with the Client. He especially devised the strategy of claims under the title of Project Management with the Client. As an end result of innovative thinking a very important group of claims were paid by the Client to the Contractor after the arbitration.

Tender Department and Site Programming Unit Manager في OZDEMIR Construction Co. Inc. - Head Office
  • تركيا - أنقرة
  • مايو 2004 إلى أبريل 2005

He developed and used a general “Tender Computer Program” as a mathematical model fit to be easily adaptable to any new tender using the “Top Down Method”. This is a generic mathematical model which uses the already developed cost files organized either in unit prices or direct and indirect cost files. The General Manager of the company is only asked to produce a unique percentage on “The Profit and Risk Ratio”. He also devised a list of this ratio advised after analyzing various risk levels of different countries and client types where tenders originate. There is a total of full 23 Tenders submitted up to now and only four of them are awarded. He thinks that his approach is concise, unique and complete in itself. To improve this model only new cost data obtained from local subcontractors must be added to the model. Cost files already include very diverse tender topics. The same “Tender Computer Program” may be used during the Cost Control phase as a generic model of that Project. He plans to write a book on tender preparation when he retires.

Tender Department Manager في UNAL AKPINAR Construction Co. Inc. - Head Office
  • تركيا - أنقرة
  • مايو 2003 إلى فبراير 2004

He continued to develop and finalize a general “Tender Computer Program” as a mathematical model fit to be easily adaptable to any new tender using the “Top Down Method”. He managed to submit tenders for at least 15 very diverse construction projects. Only a handful was awarded.
He made business development. Especially he tried to compile and follow up all tender awarding international Clients on the global scale using Internet.

QA/QC Manager, based in Libya في GAMA Co. Inc
  • تركيا - أنقرة
  • مايو 2002 إلى أبريل 2003

Mellitah, Wafa Coastal Project (Refinery construction), Wafa/LIBYA
Project was the main subcontract ($120 million) of an EPC construction of an immense oil refinery and oil and gas terminal combined: His responsibilities included Concrete and steel works on a large scale; working on the Contractor’s side. The Client was an Italian consortium.

Technical Office Manager based on site في GURIS Construction Co. Inc
  • تركيا - أنقرة
  • مايو 2000 إلى أبريل 2002

Ankara Metro 3rd stage construction. Turkey.
The EPC Project ($30 million) consisted of a new metro track and related stations including a tunnel dug out by a TBM. During the initial stages of the Project he oversaw the basic engineering and detailed design of the system and the stations and got the approval after the formal Public Authority.

Senior Engineer for Business Development and tenders في GURIS Construction Co. Inc
  • تركيا - أنقرة
  • مايو 1998 إلى أبريل 2000

He prepared complete tender files and related cost estimates, made business contacts with government institutions and private companies. He started to build a systematic “Tender Computer Program” that could be used for all tenders in a generic fashion. On the other hand he worked on Build-Operate-Transfer (BOT) type hydro-energy projects. He identified all suitable dam sites in Turkey for that purpose. He developed feasibility files to some dams to submit to the State Authority.

Project Manager and Contracts Manager في ATTILLA DOGAN Co. Inc
  • تركيا - أنقرة
  • مايو 1996 إلى أبريل 1998

He worked on Business Development of construction projects in Turkey and overseas. He assisted in Tenders related to gas and oil pipelines and refineries which were the main speciality of the company. He developed Build-Operate-Transfer (BOT) model hydro-energy projects in Turkey. He executed the Contract Management of some ongoing projects.

Quality Assurance and Control (QA/QC) Manager based on site في GURIS-GAMA-SNCLavalin-BOMBARDIER JV
  • تركيا - أنقرة
  • مايو 1993 إلى أبريل 1996

He managed the QA/QC of the fixed facilities for the Ankara Metro Project; that is all of the construction work done by the Turkish contractors. As a side note: During these years, he also successfully designed, financed and constructed an 820 m2 building for his own account.

Senior Site Engineer في ANKARA CEMENT Co. Inc.
  • تركيا - أنقرة
  • مايو 1992 إلى أبريل 1993

Construction of a new cement factory, Ankara/TURKEY
He provided QA/QC supervision and planning to the construction from the owner’s side of the Project. He assisted on the payments to the contractors. He developed a detailed PRIMAVERA Project Plan to oversee the scheduling of the project.

Senior Design Engineer في TABAR Engineering Consulting Ltd
  • تركيا - أنقرة
  • مايو 1991 إلى أبريل 1992

He provided the Engineering Basic Design of Water Supply of the city of Bursa including pumping stations. He worked on the estimation of unaccounted for water of the whole city by measuring existing flows on the network. He prepared bidding documents for the use of the client. This was a consultancy project financed by the European Union.

Private Contractor في Kusin Construction Co.
  • تركيا - إزمير
  • مايو 1990 إلى أبريل 1991

With his associate he finished one commercial plaza (4.000m2) and a house (160m2) in Kusadası. This was a free lance self employed management job on the contractor’s side.

Senior Design Engineer في TEMPO ALTYAPI Engineering Consulting Ltd
  • تركيا - بورصة
  • مايو 1988 إلى أبريل 1990

He did Basic Engineering Design of sewage collection and storm water mitigation systems of some parts of Istanbul. He worked on some feasibility studies related to combined hydro-energy and potable water systems.

Senior Design Engineer في Societe Des Etudes Hydrauliques D'Alger
  • الجزائر - الجزائر
  • مايو 1979 إلى أبريل 1988

He managed complete Basic Engineering Design and Detail Design packages of water supply lines and distribution systems, sewage, storm water networks, storm water retardation dams and sewage treatment facilities (Basic design only for treatment cases). Projects involved usually consisted of middle size cities (etc. 30 - 75 million habitants). He provided site inspection for some of these designs during implementation. Over 30 projects involved. This Company was a centralised Governmental Design Authority for all of Algeria.

Senior Design Engineer في ERKA-AS Research and Design Group
  • تركيا - أنقرة
  • مايو 1977 إلى أبريل 1979

He worked on Basic Engineering Design regarding one of the main Water Supply Networks for the city of Izmir/TURKEY. Project included pumping stations, forced mains, intermediary reservoirs, and gravitational pipelines up to the main storage reservoirs in the city. This work done was in a Design Office hired by the Contractor of the Project.

Civil Engineer Supervisor في Robert Matthew Johnson Marshall & Partners
  • المملكة العربية السعودية - مكة المكرمة
  • مايو 1976 إلى أبريل 1977

He worked on the supervision of the construction of pilgrim facilities at the Mecca area. This work was about building construction, quality control, contractor payment certificates and client relationships on the side of the Consultant.

Senior Design and Site Engineer في State Hydraulic Works
  • تركيا - أنقرة
  • يونيو 1970 إلى أبريل 1976

He worked on the design of main Water Distribution Network of Ankara/Turkey. He also produced Basic Engineering Designs regarding: Various irrigation systems (With classical earth structures, or with buried pipes, or with elevated open concrete channels) and related small dam designs, river regulations mitigating storm water damage to small towns. He supervised some steel and reinforced concrete designs and their implementation on site. He did some site inspection, solved engineering issues and approved payment certificates of contractors. The Company was a state owned giant responsible for the planning and tendering of all kinds of important water works in whole of Turkey.

الخلفية التعليمية

ماجستير, Soil Mechanics MS. in Civil Engineering.
  • في Middle East Technical University (METU) / Orta dogu Teknik Universitesi (ODTU)
  • يونيو 1972

This is one of the best Engineering Universities in Turkey based on the American model. All curriculum is in English.

بكالوريوس, Civil Engineer BS.
  • في Middle East Technical University (METU) / Orta Dogu Teknik Universitesi (ODTU)
  • يونيو 1970

This is one of the best Engineering Universities in Turkey based on the American model. All curriculum is in English.

الثانوية العامة أو ما يعادلها, High School Diploma
  • في Government College of the City of Izmir / İzmir Maarif Koleji
  • يونيو 1966

This was an elite government school; admission by a difficult exam. All technical curriculum in English except Humanities in Turkish.

Specialties & Skills

MS Project
Site Inspection
Water Supply
Monthly Reporting
Control System Design
Business Development
Tender management
Design Engineer
Cost Control Management
Site Inspection
Planning Management
Potable water supply & distribution, sewage systems, stormwater mitigation
Massive concrete, airplane strips and aprons
Infrastructure projects, steel and concrete buildings.
Political Sciences / Country Analysis

اللغات

العربية
متوسط
الانجليزية
متمرّس
الفرنسية
متمرّس
الالمانية
متوسط
التركية
متمرّس

العضويات

Turkish Society of Civil Engineers
  • Normal member
  • June 1970

التدريب و الشهادات

Training on PMP and others on Management (تدريب)
معهد التدريب:
Various
تاريخ الدورة:
January 2009

الهوايات

  • Forecasting political and economic situations in difficult countries.
    He can safely forecast future political, ethnical layout of moslem countries, Russia and Europe. Loves history, comparative study of religions and belief systems.