define full scope, creation of Baseline Schedules, define best construction methodology, monitoring &controlling.
Main task:
1. Developing Project startup:
• Baselining of the project plan with management sign-off
• Commitment of resources by agency management
• Creation of a project database
• Project Kick-off meeting
2. Defining the appropriate techniques and the sequence of the construction.
3. Produce Method of statement for projects.
4. Developing Risk register for Project.
5. Assessing the viability and possibility of different construction methods, in order to decide which is the best in terms of budget, logistics and timing.
6. Deriving Cash flow, Resources, Design, Engineering and Procurement Schedules from the baseline. Planned Cost, labor and level of effort S' Curves to be generated as required.
Project: Nasr City Water Purification Plant and Delivery Pipe Lines Capacity 500, 000 m3/day
Main task:
1. Developing Project startup:
• Baselining of the project plan with management sign-off
• Commitment of resources by agency management
• Creation of a project database
• Project Kick-off meeting
2. Defining the appropriate techniques and the sequence of the construction.
3. Produce Method of statement for projects.
4. Developing Risk register for Project.
5. Assessing the viability and possibility of different construction methods, in order to decide which is the best in terms of budget, logistics and timing.
6. Deriving Cash flow, Resources, Design, Engineering and Procurement Schedules from the baseline. Planned Cost, labor and level of effort S' Curves to be generated as required.
Project: Nasr City Water Purification Plant and Delivery Pipe Lines Capacity 500, 000 m3/day
mai 2015
A janvier 2017
Senior Planning engineer
à Al-Marasem International For Development) “ Saudi Binladn group SBG “
Lieu :
Egypte - Le Caire
member of Head office planning department follows all Projects progress, Assist top management for Project control.
Main task:
1. Participate in the tendering process of new projects.
2. Defining the appropriate techniques and the sequence of the construction program.
3. Produce Method of statement for projects.
4. Assessing the viability and possibility of different construction methods, in order to decide which one is the best in terms of budget, logistics and timing.
5. Monitoring the progress of the construction site, and take corrective.
6. Assist Senior Planning Engineer in deriving Cash flow, Resources, Design, Engineering and Procurement Schedules from the baseline. Planned Cost, labor and level of effort S' Curves to be generated.
Projects:
1.Restoration and Renovation of Al Azhar Mosque. 2. Restoration and Renovation of Al Azhar Sheikhdom
3.El Nozha Alexandria International Airport Project. 4. Mivida Apartments Project.
5.Marassi Blanca Project. 6.Azhar Projects (11 Projects)
Main task:
1. Participate in the tendering process of new projects.
2. Defining the appropriate techniques and the sequence of the construction program.
3. Produce Method of statement for projects.
4. Assessing the viability and possibility of different construction methods, in order to decide which one is the best in terms of budget, logistics and timing.
5. Monitoring the progress of the construction site, and take corrective.
6. Assist Senior Planning Engineer in deriving Cash flow, Resources, Design, Engineering and Procurement Schedules from the baseline. Planned Cost, labor and level of effort S' Curves to be generated.
Projects:
1.Restoration and Renovation of Al Azhar Mosque. 2. Restoration and Renovation of Al Azhar Sheikhdom
3.El Nozha Alexandria International Airport Project. 4. Mivida Apartments Project.
5.Marassi Blanca Project. 6.Azhar Projects (11 Projects)
novembre 2013
A mai 2015
Planning & Project control engineer
à LIMAk Construction Egypt Branch
Lieu :
Egypte - Le Caire
Project: Rehabilitation and Expansion of Cairo International Airport Terminal Building 2 (TB2) Project.
Project parties:
Employer: Cairo Airport company (CAC) & Lender :World bank.
Project Management Consultant: Hill International
Project Engineer: ECG/NACO.
Contractor: Limak Egypt Branch
1. Review and approve / comment on the Construction schedules as submitted by the subcontractor(s) and ensure the Construction Schedule is in compliance with the overall project schedule.
2. Review and approve / comment on the procurement schedules as submitted by the subcontractors and ensure the procurement schedules are in compliance and are coordinated with current construction schedules.
3. Review and continuously monitor, against approved schedules, the major construction progress and ensure equipment and manpower are adequate or in case of any shortage report to Projects Controls Manager
4. Review in detail the recovery schedules and ensure manpower and site supervision staffs are increased properly
5. Regular visits to project sites to validate whether the progress of work on site is in compliance with approved schedules, whether major milestones have been met and report deficiencies to Projects Controls Manager.
6. Advise the Projects Controls Manager of any foreseen slippage of progress and corrective actions to be taken.
7. Attend weekly progress meeting and monthly Executive meetings and participate in preparing the agenda.
8. Assist Projects Controls Manager during preparation of Monthly Progress reports and Monthly Executive Presentations.
9. Produce daily, weekly or biweekly detailed planning Reports as required.
10. Analysis of Rate for BOQ items.
11. Compiling progress reports to the Employer and/or Upper Level.
12. Monitor progress of works and resources and ensuring project programmed completion and carry out updating of planning. 13. Inspecting and then valuing completed work
Project parties:
Employer: Cairo Airport company (CAC) & Lender :World bank.
Project Management Consultant: Hill International
Project Engineer: ECG/NACO.
Contractor: Limak Egypt Branch
1. Review and approve / comment on the Construction schedules as submitted by the subcontractor(s) and ensure the Construction Schedule is in compliance with the overall project schedule.
2. Review and approve / comment on the procurement schedules as submitted by the subcontractors and ensure the procurement schedules are in compliance and are coordinated with current construction schedules.
3. Review and continuously monitor, against approved schedules, the major construction progress and ensure equipment and manpower are adequate or in case of any shortage report to Projects Controls Manager
4. Review in detail the recovery schedules and ensure manpower and site supervision staffs are increased properly
5. Regular visits to project sites to validate whether the progress of work on site is in compliance with approved schedules, whether major milestones have been met and report deficiencies to Projects Controls Manager.
6. Advise the Projects Controls Manager of any foreseen slippage of progress and corrective actions to be taken.
7. Attend weekly progress meeting and monthly Executive meetings and participate in preparing the agenda.
8. Assist Projects Controls Manager during preparation of Monthly Progress reports and Monthly Executive Presentations.
9. Produce daily, weekly or biweekly detailed planning Reports as required.
10. Analysis of Rate for BOQ items.
11. Compiling progress reports to the Employer and/or Upper Level.
12. Monitor progress of works and resources and ensuring project programmed completion and carry out updating of planning. 13. Inspecting and then valuing completed work
juin 2012
A mars 2013
Project management engineer (Planner)
à Al saeed for Consulting engineering
Lieu :
Egypte - Le Caire
Project: Intake, booster and pipelines of 10th Ramadan water treatment plant.
1. Planning, (Master / Detail Schedules, Update it & Follow Up).
2. Produce daily, weekly or biweekly detailed planning as required.
3. Analysis of Rate for BOQ items.
4. Extracting BOQ from design drawings.
5. Preparation of Monthly Payment Applications.
6. Compiling progress reports to the Employer and/or Upper Level.
7. Monitor progress of works and resources and ensuring project programmed completion and carry out updating of planning.
8. Inspecting and then valuing completed work.
1. Planning, (Master / Detail Schedules, Update it & Follow Up).
2. Produce daily, weekly or biweekly detailed planning as required.
3. Analysis of Rate for BOQ items.
4. Extracting BOQ from design drawings.
5. Preparation of Monthly Payment Applications.
6. Compiling progress reports to the Employer and/or Upper Level.
7. Monitor progress of works and resources and ensuring project programmed completion and carry out updating of planning.
8. Inspecting and then valuing completed work.
janvier 2010
A mai 2012
junior engineer
à rawasem technical support ( ben ladn group)
Lieu :
Autre
1) Producing structural detailed drawings.
2) Formwork & Cross-Section details.
3) Reviewing and ensuring drawings standards.
4) Producing BOQ.
5) Drawings & Document control.
2) Formwork & Cross-Section details.
3) Reviewing and ensuring drawings standards.
4) Producing BOQ.
5) Drawings & Document control.