Total Years of Experience: 19 Years, 4 Months
October 2021
To Present
Deputy Project manager
at Waagner Biro Bridge Gulf
Location :
United Arab Emirates - Dubai
July 2014
To October 2021
Construction Manager
at China state Construction Engineering Corp.
Location :
United Arab Emirates - Dubai
Manage, Plane, and Supervise the construction's activities, and coordination's with Engineer and Subcontractors of Bridges in Abu Dhabi airport
October 2013
To July 2014
Section Engineer
at yuksel
Location :
Qatar - Doha
Manage and supervise underpass and fly bridge at Lusial City
January 2013
To July 2013
Senior Engineer
at Shimizu Corporation
Location :
Bangladesh
-Produce and study Construction Plans, Sequences, and methodology.
-Supervise and Produce Working Drawings.
-Prepare Method of Statements.
-Design the Temporaries Work and supporting system( Beams, Slab, Columns and Walls).
-Prepare Procurement schedule.
-Control the Materials movement.
-Supervise Piling and Foundation works.
-Supervise and Produce Working Drawings.
-Prepare Method of Statements.
-Design the Temporaries Work and supporting system( Beams, Slab, Columns and Walls).
-Prepare Procurement schedule.
-Control the Materials movement.
-Supervise Piling and Foundation works.
April 2008
To December 2012
Senior civil engineer
at Shimizu Corporation
Location :
United Arab Emirates - Dubai
• Manage, organize, schedule, and follow up the Finishing works at the site, (Surface treatment, Painting, and footpath).And distributes the workers (Direct and Subcontractors) based on the activities and priority.
\n• Attend the suppliers and subcontractors meetings and discuss the schedules (delivery, commence and complete) date.
\n• Prepare the work schedule for the subcontractors, and discuss the method statements. Executing and monitoring schedule (Galadarie and Fitwell, Plus and Emcon” coating system”) for the Gantries erection and bridge painting.
\n• Leads the site Engineers and follow up their progress (Substructure, Superstructure and finishing) activities.
\n
\n• Cost assessment and finalize the quantities of the finishing works.
\n• Supervise, Discuses, and follow up the maintenance activities for the Bridges including the submittals (work notification, method statement, and Request for inspection).
June 2006
To April 2008
Site Engineer
at Burt,Hill
Location :
United Arab Emirates - Dubai
• Inspecting the structural activities as per drawings and specification.
• Arranging and managing with the QC's department the quality and quantity of the works.
• Witnessing the field tests (slump. Compressive strength, pull out, coring, curtain walls pressure test… etc).
• Reviewing the as built drawings and confirming the details.
• Checking the surveying works.
• Following the repair works stages, and confirming the used materials.
• Coordinating with JAFZA engineers to inspect each slab (Post tension slabs).
• Raising CAR’s, and discussing with the contractor’s engineers the following methods to close them.
• Write a monthly report (interior) regarding the activities.
• Arrange with the contractor the pouring process (pump location and the interval time for the concrete vehicles).
• Study and discuss the method statements, materials description and the technical issues with the main contractor and subcontractor
• Arranging and managing with the QC's department the quality and quantity of the works.
• Witnessing the field tests (slump. Compressive strength, pull out, coring, curtain walls pressure test… etc).
• Reviewing the as built drawings and confirming the details.
• Checking the surveying works.
• Following the repair works stages, and confirming the used materials.
• Coordinating with JAFZA engineers to inspect each slab (Post tension slabs).
• Raising CAR’s, and discussing with the contractor’s engineers the following methods to close them.
• Write a monthly report (interior) regarding the activities.
• Arrange with the contractor the pouring process (pump location and the interval time for the concrete vehicles).
• Study and discuss the method statements, materials description and the technical issues with the main contractor and subcontractor
Share on Facebook