Osama Nabil, MEP Projects Manager

Osama Nabil

MEP Projects Manager

Al-Areen MEP Construction Company

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, Electrical Power & Machines, Faculty of Engineering
Experience
12 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 9 Months

MEP Projects Manager at Al-Areen MEP Construction Company
  • Saudi Arabia - Riyadh
  • My current job since January 2015

• Managing various projects in different locations at the same time.
• Estimate the projects' cost
• Making cash flow statement for projects.
• Labors and Materials Cost Controls.
• Coordination Electromechanical Works with All Others Various works.
• Communicate with stakeholders and project's teams
• Making Shop drawing for all Executing works.
• Execution of electrical and low current works.
• Execution of Smart Systems (KNX Interface).
• Execution of Duct and HVAC Works.
• Execution Various Plumbing Systems.
• Execution Fire alarm systems.

Major Project:
• Execution Electrical, Tel, TV and CCTV Systems for Over 50 Palace and Villas Over Riyadh.
• Execution Duct and concealed AC Systems for Cural Hotel (4 Stars) at Solmania District, Riyadh.
• Execution Duct, concealed AC And Package AC Systems for Show Rooms At
Ar Rahmaniyah District, Riyadh.
• Execution Electrical, Duct, AC, Plumbing, Tel, TV and CCTV Systems for 22 Villa At al Nada District, Riyadh.
• Execution Duct and concealed AC Systems For 28 Villas At Al Dammam.

Electrical Engineer at Al-Areen Consulting Engineering
  • Saudi Arabia - Riyadh
  • February 2014 to January 2015

Supervision for subcontractors and formers, and Making BOQ, Shop drawings,
Supervision for electrical and low current works.
Power, Lighting and Low Current System Design for Hotels, Villa, Palace, Residential, Administrative Offices, Dispensary.
Calculation Short Circuit with MVA Base method & ETAP.
Design of earthing system according to IEEE standard. 80 & British standard CP1013.
All calculation required for cable sizing Such as Voltage Drop, Reduction Factor.
Fire alarm system design according to NFPA Standard.
Design of Cable Installation with Various Ways.
Calculation of Loads with NEC and IEC standards.
Design of Lighting with DiaLux Program.
Design according the rules of Saudi Arabia Municipal.
Making BOQ for electrical material.

Main Projects

Royal Hotel at Olaya St (4 Stars-more than 11000 m2 of building Area)
Four Stars Hotel at Bedeia neighborhood (More than 13100 m2 of building Area)
Al Ghat water treatment plant
Al Dammam Compound (About 50 non-Typical Villa)
Jeddah Compound (About 60 non-Typical Villa)
Al Nakhil Residential Apartments (about 4500 m2 of building Area)
Mosques, Palaces, Residential buildings, Beauty center and Show Rooms
Royal Hotel at Olaya St (4 Stars-more than 11000 m2 of building Area)
Four Stars Hotel at Bedeia neighborhood (More than 13100 m2 of building Area)
Al Ghat water treatment plant
Al Dammam Compound (About 50 non-Typical Villa)
Jeddah Compound (About 60 non-Typical Villa)
Al Nakhil Residential Apartments (about 4500 m2 of building Area)
Mosques, Palaces, Residential buildings, Beauty center and Show Rooms

Site engineer at Al-Areen Electro-Mechanical Construction Company
  • Saudi Arabia - Riyadh
  • March 2013 to February 2014

Execution of electrical and low current works,
Labors and Materials Cost Controls,
Managing various projects in different locations at the same time.

Electrical Engineer at EEE
  • Egypt - Cairo
  • July 2011 to March 2013

Power, lighting, low current system designer, and lux calculations.

Education

Bachelor's degree, Electrical Power & Machines, Faculty of Engineering
  • at Helwan University
  • June 2011

Specialties & Skills

Quantity Surveying
Site Supervision
Engineering Design
Electrical Engineering
Self Learning Any Required Information
Motivation
Computer Maintenance
Persuasion skills
Communication skills
Negotiation skills

Languages

Arabic
Native Speaker
English
Intermediate

Hobbies

  • Boxing