I am Tatoba Kamble, worked for 20 years in Petrochemicals Industries.
Worked for 14 years in Gulf Countries for Oil & Gas sector in Design & Engineering field.
Now available as a Technical consultant for services like Operation, Maintenance, Trouble shooting, Design & Engineering aspects.
Also provide technical assistance for chronic, repeated problems & their solutions.
I am available for Remote work, Advice if any on following contact Nos. & my mail ...
Mobile nos.: 0091 9167542299/0091 9004610875.
Mail: tatobakamble@gmail.com
tbkamble@yahoo.com
2. Dodsal Engineering & Construction LLC, Oman .. 15 June 2008 TO 31 Jan 2010
Lead Engineer Control & Automation
➢ Project worked on
Qarn Alam Steam Injection project
✓ Review of Specification
✓ Vendor document review
3. Tasnee Petrochemicals, Al Jubail, Saudi Arabia 09 April 2007 TO 31 May 2008
Senior Engineer Instrumentation
➢ Work/Activities carried out
✓ Assigned a committee member from Instrumentation side for troubleshooting of Flare header choking problem faced in PP Plant. Committee submitted report to management in consultation with third party appointed.
✓ Suggest and implement best cost effective solutions to overcome long pending issues. Prepare Standard Maintenance Practices (SMP) and implement to avoid unwanted failures, upsets in process.
✓ Identification of critical instruments and procurement of its spare parts. Standardization of instruments for common spare parts.
✓ Management of Change (MOC) preparation and its execution for improvement and enhancement of reliability of instrumentation systems.
✓ Worked on safety Instrumented System (SIS) . Working experience on Valve Link software used for Partial stroke Checking (PST)
✓ Rectified charge heater damper problem which was long pending and made it operable from DCS. This has increased effienciency of charge heater.
✓ Commissioned Partial Stroke Test (PST) system used for 15 nos. emergency shut down valves.
✓ Replaced Polycarbonate bowls with metal bowls for critical valves to avoid emergency shut down, (Polycarbonate bowl crack/burst due to harsh environment) as an improvement plan.
✓ During Turn Around Maintenance (TAM) calibrated total 394 control valves of Koso make and Flowserve make.
✓ Spare parts technical scrutiny, inspection and its acceptance.
✓ Prepared data base for SAP system by identifying Critical, Non critical, control, monitoring instruments for PP Plant and PDH plant.
4. Indian Petrochemicals Corporation Ltd. Nagothane .. 23 Sept 1986 TO 07 April 2007
General Manager Instrumentation
➢ Projects Executed
✓ Extruder capacity enhancement from 10 T/Hr to 18T/Hr.
✓ Pellet Convening Package capacity enhancement
✓ Installation of addition Blow Down vessel and its associated instrumentation
✓ De Bottlenecking of PP plant
✓ Cyclone separator installation and its associated instrumentation
✓ 6 no. Bagging machines revamping done under my guidance and supervision (Project Manager) . Prepared Specifications, Procurement, Inspection, Installation, Commissioning and hand over to operation.
✓ Hydrogen package installation & commissioning
➢ Work /Activities Carried out
✓ Review of P & IDs
✓ Review of loop drawing
✓ Checking and review of field junction box termination drawings
✓ Loop checking
✓ Checking and correction of Interface connections as per approved drawings
✓ Review of DSC, PLC loop schematics
✓ Review & commented package vendor's drawings like GA, Hook up, Data Sheets
✓ Modification, improvement schemes implemented through FCO scheme
✓ Generated loop drawings, Logic Diagrams for DCS and PLC system for modifications
jobs
✓ Created Data Sheets
✓ Sizing of orifice plates, control vales
✓ Prepared specifications
✓ Prepared scope of work for improvement schemes
✓ Evaluation of small bids for modification jobs done
✓ Hazop, design reviews conducted for modification jobs
➢ Additional Activates in the field of Commissioning
✓ Handled the task of commissioning of Ammonia and Urea Plants of Chambal Fertilizer & Chemicals, Kota, Rajasthan.
✓ Commissioning team member of LLDPE/HDPE Plant.
✓ Yokogawa Centum V DCS system in PP Plant
✓ Allen Bradley 3/10 PLC
✓ Siemens S5 & S7 PLCs
✓ Extruder ZSK 220 Package
✓ Powder & Pellet Conveying Package
✓ Bagging & Palletizing Packages
Maintenance and trouble shooting activities actively carried out for DCS, PLCs, Package instruments, various types of field instruments. For such activities IPCL management appreciated.
• Quality System