MEP Project Manager/ MEP Construction Manager
Torishima Pump Mfg.Co.Ltd
Total years of experience :21 years, 9 Months
* June 2006 till date, Torishima Pump Mfg.Co.Ltd- Doha, Qatar
MEP Project Manager/ MEP Construction Manager* for the below projects:
1) Mega Reservoirs Consultant: Arcadis/Energoprojekt Client: Kahramaa
Construction of main pumping stations and utilities pumping stations for Mega Reservoirs (7 days water storage for Doha City) at Umm Bikra and Al Thumama. Value = QR 300 Millions
2) CP682/4 Consultant: Stanley/ KEO Client: Drainage Affairs- ASHGHAL
Construction of TSE3 pumping station ( Doha North Sewerage
Treatment and Associated Works): Total Flow = 7, 032 L/s. Contract value = 126 millions QR.
3) CP685 Consultant: Hyder/Khatib &Alamy Client: Drainage Affairs- ASHGHAL
Construction of TSE1 & TSE2 pumping stations (1, 200 L/s each) to pump water to Doha irrigation network. Contract value = 48 millions QR
4) ERC1400/D20/C1 Consultant: Parsons/ Maunsell Client: Drainage Affairs- ASHGHAL
Construction of two storm-water lifting pump stations along Doha north Express Highway. Contract value = 4 millions QR.
5) CP682/1 Consultant: Stanley/KEO Client: Drainage Affairs- ASHGHAL
Construction of eight fuel pump stations with complete fuel system including all tanks, piping works, instrumentation and valves. Contract value = 9 millions QR.
6) Construction of Potable Water pumping Station at Labor City at Mesaimeer Project. Contract value = 12.5 Millions QR
Main Contractor: Al Ali Engineering
Consultant: M&Z Partners
Client: Private Engineering Office
End User: KAHRAMAA
*Parallel to my duties in projects execution I am in charge of all tenders estimations for mechanical systems.
* October2002 - June 2006, Nael Energy & General Enterprises Est. Abu Dhabi Branch- (NBH Group)
MEP Project Engineer at Water & Electricity Department for the following Projects:
Contract No. Consultant Client
1) Pilot Project Dornier Consult GTZ
Construction of 9 water wells to pump water to a storage basin and re-injection of water to the water table for experimental purposes.
2) G 1095 Mott MacDonald ADWEA
Construction of new distribution pumping station at Tarif, and refurbishment of existing pumping station at Sir Banyas Island Palace.
3) G 1040 Ital Consult ADWEA
Construction of Liwa rest-house pumping station, Hamrour filling
station, and electro-mechanical works of Liwa Palace, Giffin
ground water tanks, Jabana and Attab elevated tanks.
4) D 3116 Ital Consult ADWEA
Construction of new pumping station at Ghanada, refurbishment of existing pumping station at Al Khatem, and Taping of Salmyah branch from Shuwaihat main pipeline.
5) N 2664 Penspen ADWEA
EPC contract for construction of Lot-F at Mussafah pumping station.
For the above mentioned projects the following activities were of my duty:
✓ Preparing material submittals for all mechanical equipments and systems and getting consultant/client approval for the same.
✓ Preparing and submitting for approval all mechanical shop drawings.
✓ Sourcing, ordering (through procurement department) and delivery to site of all mechanical materials as per approved material submittals and shop drawings, for the installations works to be completed.
✓ Site management and coordination of all electro-mechanical activities as per projects working schedules.
✓ Conducting all mechanical equipments material inspections with the consultant representative.
* July 2001 - September 2001, FNC Dubai
Site Engineer at MEP Department
Monitoring and supervising of all building services installation activities at
Fujairah Tower (HVAC, Water Supply, Drainage & Fire Fighting
Systems)
Bachelor of Engineering (BE) in Mechanical Engineering
1997 - 2002 Lebanese American University (LAU), Byblos - Lebanon B.E. in Mechanical Engineering