Total years of experience :12 years, 8 Months
My mission is to make the follow up of this equipment, to prepares the files preliminary to deposit one the level of the ministry for the mines and energy including :
- To prepares the notes of calculation following ASME 2010 and CODAP 2010.
- Preparation WPS following ASME 2010.
- Preparation plans (SOLIDWORKS &AUTOCAD).
Follow-up examinations non-destructive one cisterns LPG (examination radiographs).
Follow-up examinations destructive one the level of GTP (traction, folding camera and impact strength) for the preparation of the PQR.
Follow-up the manufacturing of cisterns LPG.
Follow-up Cisterns LPG for the hydrostatic test with the mining engineer.
To prepare the final technical file of cistern LPG.
To make requirements out of raw material (sheets, accessories, tubes, shapes)
To detail plans of the metal frame and to make their follow-up of realization in the workshop.