Material Controller
Gs
Total years of experience :16 years, 1 Months
As material control in ware house lay down area.
• ● Coordination and bringing the material from supplier.
• ● Inspection all material received at site.
• ● Make the material receiving report (MRR) to owner and consultative in site.
• ● Make the consolidated material receiving report (CMRR).
• ● Make damage report, if it found any damage in material.
• ● Make shortage report, if it found any shortage in material according to the packing list.
• ● Make request report for all material to the site engineers according to the drawing.
• ● Make the pressure tests that are needed for the instrument material.
• ● Periodical quantities check and feedback to the technical office.
● Save files and arrange them (Hard and Soft).
● ISO .
● Coast for some Data .
● Follow-up emails .
● Data Entrey .
As Material control in ware house lay down area.
• ● Coordination and bringing the material from supplier.
• ● Inspection all material received at site.
• ● Make the material receiving report (MRR) to owner and consultative in site.
• ● Make the consolidated material receiving report (CMRR).
• ● Make damage report, if it found any damage in material.
• ● Make shortage report, if it found any shortage in material according to the packing list.
• ● Make request report for all material to the site engineers according to the drawing.
• ● Make the pressure tests that are needed for the instrument material.
• ● Periodical quantities check and feedback to the technical office.
As Document Control
- Documents control.
- Purchases official.
- HR Officer.
- Equipment Coordinator.
- Time Keeper.
As Material control in ware house lay down area .
• ● Coordination and bringing the material from supplier.
• ● Inspection all material received at site.
• ● Make the material receiving report (MRR) to owner and consultative in site.
• ● Make the consolidated material receiving report (CMRR).
• ● Make damage report, if it found any damage in material.
• ● Make shortage report, if it found any shortage in material according to the packing list.
• ● Make request report for all material to the site engineers according to the drawing.
• ● Make the pressure tests that are needed for the instrument material.
• ● Periodical quantities check and feedback to the technical office
As Material control in ware house lay down area .
• ● Coordination and bringing the material from supplier.
• ● Inspection all material received at site.
• ● Make the material receiving report (MRR) to owner and consultative in site.
• ● Make the consolidated material receiving report (CMRR).
• ● Make damage report, if it found any damage in material.
• ● Make shortage report, if it found any shortage in material according to the packing list.
• ● Make request report for all material to the site engineers according to the drawing.
• ● Make the pressure tests that are needed for the instrument material.
• ● Periodical quantities check and feedback to the technical office.
مسؤل عن تركيب اجهزة قياس الضغط الخاصة بالموقع بجانب تامين الماتيرل والخامات الخاصة بالاجهزة
العمل مع بعض الممثلين والشخصيات الخاصة وشركات السياحة
Resrvation & Sales Of Hotels Room's
التدريب فى هذة الفترة على خدمة العملاء عبر الهاتف