Amr Hanafy, Senior Mechanical Engineer

Amr Hanafy

Senior Mechanical Engineer

ECG Consulting Engineers Group Egypt.

Location
Egypt
Education
Bachelor's degree, تخصص ميكانيكا قوى
Experience
25 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 1 Months

Senior Mechanical Engineer at ECG Consulting Engineers Group Egypt.
  • Egypt - Cairo
  • May 2015 to August 2020

Project Handleds:

- Hyde park residential Buildings and Villas constructions and fully finished Basement Parking in New Cairo Fifth Settlement.
West Cairo (SPHINX) Airport Construction.
Kattameya (Capital) Airport Construction. Rehabilitation and Expansion of Cairo International Airport Terminal Building NO.2 (TB2).

- ATTAQA 650 MW Simple Cycle Power Generation Plant in Suez City.

- PORTO SHARM in SHARM El Sheikh City -AMER Group CO.

“Senior Electromechanical Consultant Engineer at EHAF Cairo Consulting Engineers Companyand as A Consultant Engineer Representative to SYSTRA Egypt C
  • Egypt - Cairo
  • December 2012 to May 2015

Project (1) : Schlumberger (Egypt Integrated Base construction) at October City.
Project (2) : Tunnels Metro Supervision “Greater Cairo Metro Line 3 Phase 2”, Which include (Air Treatments HVAC for Stations - Blowing Ventilation for Tunnels and Extraction Ventilation for Inter Stations Annex -Smoke Extraction and Over Pressurization Fans for Stations - Fire Fighting System for Tunnels and Stations - Elevators and Escalators - Dewatering Pumping and Plumbing System for Stations and Tunnels).

Job Responsibilities:
(1) Cover and consider all Site requirements from (Reporting, inspecting, providing consultations…).
(2) Perform periodic inspections (Visual and Dimensional) for MEP works and the quality of workmanship.
(3) Reviewing the shop drawings with contractors and making the field change requests if required.
(4) Monitoring performance and progress of the works in relation to agreed schedule.
(5) Analyzing the problems as built and proposing the suitable solutions.
(6) Following up and supervising on installation works for Ducting, PROMAT and Piping Systems.
(7) Perform the Snag, Punch and Final Inspection Lists.
(8) Covering and sharing all General Operation Tests (GOT) during Experimental Working Period (EWP).
(9) Covering and sharing all Equipments Testing, Adjusting and Balancing (TAB) for HVAC Systems.
(10) Covering and sharing the Provisional Taking Over (PTO) for commissioning of all systems.

ElectroMechanical (MEP) Project Manager at TRAVCO GROUP
  • Egypt - Cairo
  • October 2010 to July 2012

Job Responsibilities :
(1) Initiate purchase orders to satisfy the specified requirements of the project.
(2) Coordination with contractors to fulfill Owner's requirement on time and correspondence.
(3) Monitoring performance and progress of the works in relation to agreed schedule.
(4) Monitoring all material and shop drawing approval status.
(5) Ensure compliance of consultant specifications and comments by the contractors/suppliers.
(6) Ensure that the Company Quality Policy is understood and affected by all parties.
(7) Over all responsible for the timely completion of Project under predefined scope of work.
(8) Preparation of Monthly Progress Report.
(9) Follow site work progress and coordination meetings.
(10) Ensure smooth progress of MEP activities during execution of civil works.
(11) Perform periodic inspections of MEP work progress and quality of work and recommend corrective action to the Project Manager if required.
(12) Handling over document with O & M manuals and As Built Drawings for the project.
.

(MEP) Site Manager at Bakry Consultants Engineers
  • Libya - Tripoli
  • May 2008 to September 2010

: Project :Installation MEP works and execution the Infrastructure of project, Complete Construction for the Healthy Care Compound and the Hospital on Area about 5.5 Hectares , which included :
550 Rooms (8 Resident Buildings )-Administration Main Building - Class rooms Building- Laboratories and Clinics - Covered Games Hall - Theater Building - Kitchen and Laundry Building - Heating Boilers Plant - Central Air Conditioning Plant more over (1200 Fan Coils Units, 30 AHUS, S.A.F, EX.AF, Split Units, Chillers, Pumps, .) -Sewage Water Treatment Plant -Rain Water Treatment Plant -Domestic and Fire Fighting Water Plant - 4 (Covered Swimming Pools) - Fountains - Fuel Supply Plant- Modern Water Irrigation system- Building Automation System( B.A.S), (B.M.S) - Pipes Networks (Sanitary, A/C, Fire Fighting, Domestic Cold &Heating Water, Fuel, Irrigation, ..)
:Job Responsibilities
(2) Preparation & timely submission of Construction drawings until to get Owner's approval.
(3) Coordinate and designate the work to be carried out to supervisors / foreman and technicians.
(4) Modifying some Designs according to the nature and proposing solutions.
(5) Day to day supervision of site works and the quality of workmanship.
(6) Coordination with Subcontractors to fulfill Owner's requirement on time and correspondence
(7) Conducts such inspections & tests as may be required in conformance with the contract documents & the project’s inspection & test plan.
(8) Inform the Project Manager in respect of any variations or changes required to the site works as advised by the Owner Representative.
(9) Will ensure the on time delivery of material to site to avoid any unnecessary delay.
(10) Timely completion of site installation as per drawings and supplier's recommendations.
(11) Coordinate for testing and commissioning of equipment/system where ever applicable.
(12) After completion of each installation / testing activity get written approval from Owner Representative
.

Head of MEP Department at Head Office in Bank Of Alexandria (Intesa San Paolo Group)
  • Egypt - Cairo
  • July 2005 to May 2008

Project s : Executing a fully innovation for all Branches including installation of MEP works Such that (Split Units, Package Units, Chilled water Units, Fire Fighting System, Pluming works...)
Consultants : Sabbour Engineering Office Associates - Salah Shaaban Office -D/ Hammad Office.
Job Responsibilities:
1) Preparing the B.O.Q for some projects, Examining, Recommending Technically and following up on the implementation of projects.
2) Reviewing designs and shop drawings with consultants and contractors.
3) Analyzing problems as built and proposing suitable solutions.
4) Executing a fully innovation for A/C projects for many branches.
5) Supervising on the implementation of the mechanical works of plumbing and fire fighting.
6) Coordination with contractors to fulfill Bank’s requirement on time and correspondence

Senior ElectroMechanical (MEP) Engineer at Al Nabila Resorts &Hotels
  • Egypt - Hurghada
  • May 2001 to June 2005

Job Responsibilities:
1) Responsible for Supervising on the implementation of the Installing all Mechanical Works (Central A/C in Cairo - Package and Split Units in Hurghada - Fire Fighting -Swimming Pools - Boilers Heating System -Sanitary Sewage water networks - Feeding Cold Water system -Modern water Irrigation system) .
2) Reviewing designs and shop drawings with consultants and contractors.
3) Analyzing problems as built and proposing suitable solutions.
4) Supervising on the implementation of the mechanical works of plumbing and fire fighting.
5) Coordination with contractors to fulfill Owner's requirement on time and correspondence.
6) Responsible for Operation and Maintenance for the delivered different systems.

Junior ElectroMechanical (MEP) Engineer at Miraco Carrier Air Conditioning Co.
  • Egypt - Cairo
  • April 1996 to April 2001

Job Responsibilities:
1) Replacement for disposal old units- retrofits for some units- installing (fan coil Units- air handling Units - cooling towers- chillers - pumps - pipes - control- hookups.....).
2) Start Up and Commissioning all units of the system.
3) Work at the Service Centre in the Reciprocating Chillers Department.
4) Carrying out Emergency Calls, Repairs Contracts and Overhauls maintenance.
5) Following up and Supervision on the operation, repairing and maintenance A/C systems as a Resident Engineer in some Administrative and Governmental Buildings.

Quality and Production Engineer at Baldwin Engineering Co
  • Egypt - Cairo
  • April 1995 to April 1996

Job Responsibilities:
1) Following up the production stages in manufacturing Fire Tubes Boilers and HIgh Pressure Vessels.
2) Supervising on fabrication stages, building, assembly, components installation,
3) Supervising on the Testing Methods Stages for Welding Ultra Sonic Waves, Gama Rays and Hydraulic Press).
4) Assuring Fabrication Process Control and Product quality .

Education

Bachelor's degree, تخصص ميكانيكا قوى
  • at جامعة حلوان -كلية الهندسة و التكنولوجيا
  • May 1993

Specialties & Skills

Project Execution
Design Conceptualization
Worksite
Supervisory Experience
Technical Project Leadership
Outstanding leadership, administrative and communication skills, a strong record of managerial senio

Languages

English
Intermediate

Memberships

Engineer Syndicate
  • Mechanical Power Engineering
  • June 1993

Training and Certifications

• MS Projects 2010 Certificate (Certificate)
Date Attended:
July 2012
Valid Until:
August 2012
• Projects Management Professionals (PMP) Certificate (Certificate)
Date Attended:
June 2012
Valid Until:
July 2012
Design of Automatic Fire Fighting Systems (Certificate)
Date Attended:
December 2007
Valid Until:
December 2007
Design of Central A/C, Loads Estimation (HAP), Refrigeration and Ventilation (Certificate)
Date Attended:
October 2007
Valid Until:
November 2007
Design of Plumbing Works, Water Feeding Sys, Swimming Pools and fountains (Certificate)
Date Attended:
February 2008
Valid Until:
February 2008
Supervisory Skills development (Certificate)
Date Attended:
January 2001
Valid Until:
January 2001